1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- September 03, 1997 LETTING Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its office in Building Five, Room A-148, 1900 Kanawha Boulevard East, Charleston, West Virginia 25305-0430 until 10 A.M. September 03, 1997 and said proposals will be publicly opened and read immediately thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 9618001 S325-0250/00-003.50 00 0STP 0250 080 EQ0 REHABILITATION-RESTORATION-RESURFACING MIDDLETOWN MALL - FAIRMONT ROAD 0.13 MI N I-79 OFF RAMP - 0.25 MI S CO 250 COUNTY: MARION DBE GOAL: 10 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 002 *9608006 S340-0034/00-025.89 00 0STP 0034 045 EQ0 GUARDRAIL RED HOUSE - PARADISE ROAD 0.29 MI N D8 - 0.09 MI N CR 34/9 COUNTY: PUTNAM ------------------------------------------------------------------------------------------------------------------------------------ 003 9705503A U318-0021/00-016.46 00 0STP 0021 040 EQ0 RESURFACING WITH GUARDRAIL S318-0021/00-016.77 00 OLD US 21 0.07 MI S I-77 OFF RAMP - 0.22 MI N CO 21/26 COUNTY: JACKSON DBE GOAL: 10 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 004 *9707001 S335-0070/00-001.16 02 0NFA 0701 100 000 DRAINAGE IMPROVEMENTS I-70 AND HOSPITAL RD I/S CR 40/8 & I-70 RAMP O WB COUNTY: OHIO ------------------------------------------------------------------------------------------------------------------------------------ 005 9218009 S310-0016/00-021.61 00 00BR 0016 062 E00 GRADE, DRAIN, PAVE, STRUCTURE COTTON HILL STATION BRIDGE #4065 OVER NEW RIVER & CSX RAILROAD, 1.58 MI. N. CO13 COUNTY: FAYETTE BRIDGE : #4065 CONCRETE ON ROLLED I BEAM SPAN(S): 8 ; STRUCTURE STEEL: 557098 KG DBE GOAL: 10 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 006 9401303 S305-0007/00-001.06 00 GRADE, DRAIN, PAVE, STRUCTURE ROCKDALE BRIDGE & OLD MILL BRIDGE OVER CROSS CR., 0.03 MI. W. CR 18/1 COUNTY: BROOKE BRIDGE : #4170 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 1 ; STRUCTURE STEEL: 68279 KG BRIDGE : #4171 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 1 ; STRUCTURE STEEL: 47492 KG ------------------------------------------------------------------------------------------------------------------------------------ 007 *9718316 S353-0001/00-000.00 00 RESURFACING LIMESTONE-WINDY RIDGE ROAD JCT CR 21 ON CR 1 CHANGE TO CR 20 ON CR 20 AT JCT CR 20/4 COUNTY: WIRT ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- September 03, 1997 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 008 9512903 S331-0039/01-000.00 00 STRUCTURE REPLACEMENT W WORLEY TRUSS DUNKARD CREEK, 0.02 - 0.10 MI E WV 7 COUNTY: MONONGALIA BRIDGE : 4397 ASPHALT ON STEEL DECK TRUSS SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 009 9709718 S346-0050/00-016.66 00 0STP 0050 127 EQ0 REHABILITATION-RESTORATION-RESURFACING THORNTON ROAD 0.16 MI W CO 7 - PRESTON CO. LINE COUNTY: TAYLOR DBE GOAL: 12 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 010 9632401 E316-0DSR/00-G22.44 00 FEMA 1137 STRUCTURE REPLACEMENT MILL ROAD BRIDGE #4405 .01 MI W JCT CR 20 COUNTY: HARDY BRIDGE : 4405 CONCRETE SLAB ON STEEL BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 011 *9717801 S338-0009/03-002.72 00 SLIDE REPAIR WITH PILING CR 9/3 SNOWSHOE RD BEGIN: 2.72 MI N JCT WV 66 END: 2.73 MI N JCT WV 66 COUNTY: POCAHONTAS ------------------------------------------------------------------------------------------------------------------------------------ 012 *9719501 S309-0025/00-002.41 00 RESURFACING MEATHOUSE FORK ROAD CO 18/13 - CO 58 COUNTY: DODDRIDGE ------------------------------------------------------------------------------------------------------------------------------------ 013 *9719701 S324-0002/03-000.00 00 RESURFACING MUDHOLE BRANCH ROAD JCT. CR 2 - 0.34 MILE N. JCT. CR 2 COUNTY: MCDOWELL ------------------------------------------------------------------------------------------------------------------------------------ 014 *9719702 S324-0009/00-000.00 00 RESURFACING RIFT - BIG CREEK ROAD JCT. WV 16 - 0.55 MILE S. JCT. WV 16 COUNTY: MCDOWELL ------------------------------------------------------------------------------------------------------------------------------------ 015 *9719703 S328-0010/06-000.00 00 RESURFACING POCASIN ROAD JCT. WV 10 - JCT. CR 6 COUNTY: MERCER ------------------------------------------------------------------------------------------------------------------------------------ 016 *9719704 S328-0013/01-000.00 00 RESURFACING WINDMILL GAP ROAD JCT. CR 13 -0.08 MILE N. JCT. CR 13/3 COUNTY: MERCER ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- September 03, 1997 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 017 *9719705 S328-0219/01-000.00 00 RESURFACING OLD OAKVALE ROAD JCT. WV 104 - JCT. CR 460/10 COUNTY: MERCER ------------------------------------------------------------------------------------------------------------------------------------ 018 *9627703 U353-0004/00-000.00 00 RESURFACING CAMP BARBE ROAD JCT WV 14 TO 0.11 MI. E. JCT WV14 COUNTY: WIRT ------------------------------------------------------------------------------------------------------------------------------------ 019 9718328 E316-0010/00-004.35 00 SLIDE REPAIR WITH PILING RIG ROAD 0.611 MI S CO 10/1 COUNTY: HARDY ------------------------------------------------------------------------------------------------------------------------------------ 020 9717005 U317-0058/00-003.01 00 TRAFFIC SIGNAL WV 58 AT I-79 RAMPS ANMOORE COUNTY: HARRISON ------------------------------------------------------------------------------------------------------------------------------------ 021 9615905R1 S310-0019/00-015.48 00 00NH 0019 177 E STRUCTURE RENOVATION NEW RIVER GORGE BR #2719.3 ON US 19, 1.16 MILES NORTH OF WV 16 COUNTY: FAYETTE BRIDGE : 2719.3 STEEL DECK ARCH SPAN(S): 23 ; DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. CONTRACT: 9615905 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of total bid, whichever is greater. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained at the Charleston office. The right is reserved to reject any or all proposals. *These are projects on which any contractor with a Category "W" Prequalification Rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals on all projects will be furnished at twenty-five dollars ($25.00) per set. Extra plans will be furnished at fifteen dollars ($15.00) per set and extra proposals will be furnished at ten dollars ($10.00) per proposal. Cross sections will be furnished at fifty dollars ($50.00) per set. All will be furnished without refund and transmitted at your risk. The above noted project information will be available in the Contract Unit, Construction Section, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305 and may also be ordered by calling (304)558-2874. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national orign in consideration for an award. No proposals for these projects will be issued after 3:00 P.M. on the day prior to the letting. It is necessary to advise your approximate uncompleted workload when ordering plans and proposals. Announcement, opening and reading of bids received will be in the order as designated in the "Notice to Contractors". Sealed proposals may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9 A.M. and 10 A.M., the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division Of Highways John J. Welch, Jr., Director Project Control Division 1 1 FEDERAL PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 9618001 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S325-0250/00-003.50 00 0STP 0250 080 EQ0 COUNTIES : MARION DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/15/98 RES. ENG.: HARRY LOOKER, ACTING DESCRIPTION: MIDDLETOWN MALL - FAIRMONT ROAD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RRR 0005 218-03 GABIONS 60.000 M3 0010 229-01 SHOULDERS AND DITCHES 3.600 KM 0015 240-010450 CLEANING CULVERTS 450MM 36.000 M 0020 408-02 BITUMINOUS MATERIAL 8,230.000 L 0025 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 500.000 M2 0030 604-010600A2 METALLIC COATED CORRUGATED STEEL PIPE, 600MM, A2 26.000 M 0035 604-090600 END SECTION FOR CORRUGATED STEEL PIPE 600MM 2.000 EA 0040 605-09 TYPE G INLET 6.000 EA 0045 607-012 TYPE 1 GUARDRAIL CLASS II 293.400 M 0050 607-091 TYPE 1 GUARDRAIL REMOVED AND RESET 1,461.200 M 0055 607-101 TYPE 1 GUARDRAIL REMOVED AND STORED 99.100 M 0060 607-35 GUARDRAIL ELEMENT 20.000 EA 0065 607-42 STEEL POST 1.8M 20.000 EA 0070 636-06 PILOT TRUCK AND DRIVER 8.000 DA 0075 636-08 TEMP PVMT MARKING-PAINT 7,000.000 M 0080 636-11 TRAFFIC CONTROL DEVICE 1,960.000 UN 0085 636-14 FLAGGER 460.000 HR 0090 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 680.000 MGR AA1 0095 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 620.000 MGR AA2 0100 308-07SG CLASS 7 AGGREGATE STONE OR GRAVEL 10.000 MGR BB1 1 FEDERAL PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 9618001 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S325-0250/00-003.50 00 0STP 0250 080 EQ0 COUNTIES : MARION DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/15/98 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RRR 0105 308-07S CLASS 7 AGGREGATE, SLAG 9.000 MGR BB2 0110 401-7SG SRCATCH COURSE, STONE OR GRAVEL 940.000 MGR CC1 0115 401-7S SCRATCH COURSE, SLAG 855.000 MGR CC2 0120 402-01SG HMA SKID PAVEMENT, STONE/GRAVEL 1,975.000 MGR DD1 0125 402-01S HMA SKID PAVEMENT, SLAG 1,800.000 MGR DD2 1 FEDERAL PROJECT PAGE 3 Call Order : 002 CONTRACT ID : 9608006 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S340-0034/00-025.89 00 0STP 0034 045 EQ0 COUNTIES : PUTNAM GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/97 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 INST/REPL GDRL 0005 607-011 TYPE 1 GUARDRAIL, CLASS I 960.120 M 0010 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 25.000 EA 0015 607-30 SPECIAL TRAILING END TERMINAL 1.000 EA 0020 636-11 TRAFFIC CONTROL DEVICE 1,520.000 UN 0025 636-14 FLAGGER 140.000 HR 1 FEDERAL PROJECT PAGE 4 Call Order : 003 CONTRACT ID : 9705503A Letting Date : 09/03/97 10:00 A.M. PROJECTS : U318-0021/00-016.46 00 0STP 0021 040 EQ0 S318-0021/00-016.77 00 COUNTIES : JACKSON DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/98 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY ITEMS(U318-21-16.46) 0005 207-01 UNCLASSIFIED EXCAVATION 657.000 M3 0010 207-34 FABRIC FOR SEPARATION 9,507.000 M2 0015 229-01 SHOULDERS AND DITCHES 0.770 KM 0020 311-06 OPEN GRADED FREE DRAINING BASE 733.000 M3 0025 408-02 BITUMINOUS MATERIAL 1,091.000 L 0030 506-01 CONCRETE PAVEMENT REPAIR 140.900 M2 0035 507-02 CRACK AND POTHOLE REPAIR 9.300 MGR 0040 604-010300A2 METALLIC COATED CORRUGATED STEEL PIPE, 300MM, A2 67.200 M 0045 604-010400A2 METALLIC COATED CORRUGATED STEEL PIPE 400MM, A2 8.000 M 0050 604-010450A2 METALLIC COATED CORRUGATED STEEL PIPE, 450MM, A2 2.000 M 0055 604-100375A2 METALLIC COATED CORRUGATED STEEL PIPE ARCH, 425X325MM,A2 14.100 M 0060 604-100450A2 METALLIC COATED CORRUGATED STEEL PIPE ARCH, 525X375MM, A2 53.000 M 0065 605-04 TYPE B INLET 2.000 EA 0070 605-09 TYPE G INLET 1.000 EA 0075 605-19 ADJUSTING TYPE B INLET 2.000 EA 0080 606-01150 METALLIC COATED CORRUGATED STEEL PIPE FOR UNDERDRAIN 150MM 1,663.800 M 0085 607-011 TYPE 1 GUARDRAIL, CLASS I 240.100 M 0090 607-091 TYPE 1 GUARDRAIL REMOVED AND RESET 122.000 M 0095 607-101A GUARDRAIL REMOVAL 30.500 M 0100 636-06 PILOT TRUCK AND DRIVER 6.000 DA 0105 636-08 TEMP PVMT MARKING-PAINT 4,000.000 M 1 FEDERAL PROJECT PAGE 5 Call Order : 003 CONTRACT ID : 9705503A Letting Date : 09/03/97 10:00 A.M. PROJECTS : U318-0021/00-016.46 00 0STP 0021 040 EQ0 S318-0021/00-016.77 00 COUNTIES : JACKSON DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/98 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY ITEMS(U318-21-16.46) 0110 636-11 TRAFFIC CONTROL DEVICE 7,356.000 UN 0115 636-14 FLAGGER 720.000 HR 0120 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0125 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0130 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 765.000 MGR AA1 0135 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 697.000 MGR AA2 0140 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 2,345.000 MGR BB1 0145 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 2,134.000 MGR BB2 0150 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 384.000 MGR CC1 0155 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 350.000 MGR CC2 0160 402-01SG HMA SKID PAVEMENT, STONE/GRAVEL 756.000 MGR FF1 0165 402-01S HMA SKID PAVEMENT, SLAG 688.000 MGR FF2 SECTION NO. 0002 RESURFACING(S318-21-16.77) 0170 408-02 BITUMINOUS MATERIAL 5,502.000 L 0175 636-06 PILOT TRUCK AND DRIVER 4.000 DA 0180 636-08 TEMP PVMT MARKING-PAINT 4,980.000 M 0185 636-11 TRAFFIC CONTROL DEVICE 3,147.000 UN 0190 636-14 FLAGGER 200.000 HR 0195 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 942.000 MGR AA1 0200 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 859.000 MGR AA2 1 FEDERAL PROJECT PAGE 6 Call Order : 003 CONTRACT ID : 9705503A Letting Date : 09/03/97 10:00 A.M. PROJECTS : U318-0021/00-016.46 00 0STP 0021 040 EQ0 S318-0021/00-016.77 00 COUNTIES : JACKSON DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/98 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 RESURFACING(S318-21-16.77) 0205 401-17SG HOT-MIX ASPHALT POTHOLE REPAIR, STONE OR GRAVEL 8.000 MGR DD1 0210 401-17S HOT-MIX ASPHALT POTHOLE REPAIR, SLAG 8.000 MGR DD2 0215 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 5.000 MGR EE1 0220 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 5.000 MGR EE2 0225 402-01SG HMA SKID PAVEMENT, STONE/GRAVEL 2,665.000 MGR FF1 0230 402-01S HMA SKID PAVEMENT, SLAG 2,426.000 MGR FF2 SECTION NO. 0003 SIGNING(U318-21-16.46) 0235 657-06S100115 A-441 SUPPORTS, S 100X11.5 GALVANIZED 2.000 M 0240 657-06W150018 A-441 SUPPORTS, W 150X18, GALVANIZED 3.000 M 0245 657-10 4.5KG CHANNEL POST 142.000 M 0250 657-14 9.0KG BACK TO BACK CHANNEL POST 30.000 M 0255 657-17 CLASS B CONCRETE FOOTING, REINFORCED, ROADSIDE 3.320 M3 0260 657-18 POST REMOVAL 28.000 EA 0265 661-011 2MM FLAT SHEET SIGNS 7.000 M2 0270 661-11 INSTALL REUSABLE SIGNS 28.000 EA SECTION NO. 0004 CHANNELIZATION(U318-21-16.46) 0275 663-0102W EDGE LINE WHITE TYPE II 1,820.000 KM 0280 663-0212Y LANE LINE OR CENTER LINE YELLOW TYPE II 230.000 M 0285 663-0312 BARRIER LINES TYPE II 2,620.000 M 0290 663-042 TYPE II CHANNELIZING LINES 90.000 M 1 FEDERAL PROJECT PAGE 7 Call Order : 003 CONTRACT ID : 9705503A Letting Date : 09/03/97 10:00 A.M. PROJECTS : U318-0021/00-016.46 00 0STP 0021 040 EQ0 S318-0021/00-016.77 00 COUNTIES : JACKSON DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/98 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0004 CHANNELIZATION(U318-21-16.46) 0295 663-055 TYPE V STOP LINES 50.000 M 0300 663-075Y TYPE V STRIPES YELLOW 210.000 M 0305 663-105 TYPE V LANE ARROWS 12.000 EA SECTION NO. 0005 SANITARY SEWER LINE(U318-21-16.46) 0310 675-0820052 DUCTILE IRON SEWER PIPE CLASS 52, 200MM 12.200 M 0315 675-18 ADJUSTING MANHOLE 3.000 EA 1 STATE PROJECT PAGE 8 Call Order : 004 CONTRACT ID : 9707001 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S335-0070/00-001.16 02 0NFA 0701 100 000 COUNTIES : OHIO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/14/97 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DRAINAGE IMPROVEMENTS 0005 409-02 BITUMINOUS MATERIAL PRIME 86.000 L 0010 604-50600 CORRUGATED POLYETHYLENE PIPE 309.000 M 0015 605-01 TYPE A MANHOLE 1.000 EA 0020 605-12 ADJUSTING MISCELLANEOUS TYPES OF INLETS 1.000 EA 0025 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE/GRAVE 12.000 MGR AA1 0030 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 11.000 MGR AA2 0035 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 5.000 MGR BB1 0040 407-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 4.600 MGR BB2 0045 407-2(3)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 2.000 MGR CC1 0050 407-2(3)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1.800 MGR CC2 1 FEDERAL PROJECT PAGE 9 Call Order : 005 CONTRACT ID : 9218009 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S310-0016/00-021.61 00 00BR 0016 062 E00 COUNTIES : FAYETTE DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 41,682.000 M3 0020 207-34 FABRIC FOR SEPARATION 3,645.000 M2 0025 240-010450 CLEANING CULVERTS 450MM 26.000 M 0030 307-01 CLASS I AGGREGATE BASE COURSE 748.000 M3 0035 409-02 BITUMINOUS MATERIAL PRIME 4,813.000 L 0040 502-01300 PORTLAND CEMENT CONCRETE APPRACH SLAB 300MM 108.000 M2 0045 601-02 CLASS B CONCRETE 3.000 M3 0050 604-760600A2 ALUMINUM COATED CORRUGATED STEEL PIPE, 600MM, A2 74.000 M 0055 605-09 TYPE G INLET 4.000 EA 0060 607-011 TYPE 1 GUARDRAIL, CLASS I 374.000 M 0065 607-25B CUT SLOPE TERMINAL, TYPE B 1.000 EA 0070 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 1.000 EA 0075 633-03 DUMPED ROCK GUTTER 21.000 M3 0080 636-07 ERADICATION PAVEMENT MARKINGS 180.000 M 0085 636-09 TEMP PVMT MARKING-TAPE 850.000 M 0090 636-11 TRAFFIC CONTROL DEVICE 7,475.000 UN 0095 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 1.000 EA 0100 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 50.000 EA 0105 636-14 FLAGGER 1,400.000 HR 1 FEDERAL PROJECT PAGE 10 Call Order : 005 CONTRACT ID : 9218009 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S310-0016/00-021.61 00 00BR 0016 062 E00 COUNTIES : FAYETTE DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 636-22 CHANGEABLE MESSAGE SIGN 1,100.000 DA 0115 636-25A WARNING LIGHTS TYPE A 2,200.000 DA 0120 636-25B WARNING LIGHTS TYPE B 2,200.000 DA 0125 637-01 WATER FOR DUST PALLIATIVE 5.000 M3 0130 638-02 RIGHT OF WAY MARKERS 20.000 EA 0135 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0140 640-01 STANDARD FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0145 640-03 BUILDING EQUIPMENT LUMP LUMP 0150 642-041 TEMPORARY SEED 59.000 KG 0155 642-051 STRAW OR HAY MULCH 4.000 MGR 0160 642-06 FERTILIZER 1.000 MGR 0165 642-11 HAY OR STRAW BALES 40.000 EA 0170 642-12 SILT FENCE 450.000 M 0175 652-01 AGRICULTURAL LIMESTONE 2.000 MGR 0180 652-021 FERTILIZER 10-20-10 1.000 MGR 0185 652-022 UREA FORMALDEHYDE FERTILIZER 0.300 MGR 0190 652-031 SEED MIXTURES B, C-1, OR C-2 32.000 KG 0195 652-032 SEED MIXTURES D 45.000 KG 0200 652-041 STRAW OR HAY MULCH 2.000 MGR 0205 652-042 WOOD CELLULOSE FIBER MULCH 1.000 MGR 0210 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 986.000 MGR AA1 1 FEDERAL PROJECT PAGE 11 Call Order : 005 CONTRACT ID : 9218009 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S310-0016/00-021.61 00 00BR 0016 062 E00 COUNTIES : FAYETTE DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0215 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 897.000 MGR AA2 0220 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 134.000 MGR BB1 0225 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 122.000 MGR BB2 0230 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 428.000 MGR CC1 0235 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 389.000 MGR CC2 SECTION NO. 0002 COMPUTER SYSTEM FOR FIELD OFFICE 0240 640-04 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP SECTION NO. 0003 TRAINING 0245 699 ON JOB TRAINING 2,000.000 HR SECTION NO. 0004 BRIDGE #4065 0250 203-01 DISMANTLING STRUCTURES LUMP LUMP 0255 212-01 STRUCTURE EXCAVATION 329.000 M3 0260 212-02 WET EXCAVATION 70.000 M3 0265 212-05 SELECT MATERIAL FOR BACKFILLING 19.000 M3 0270 601-02 CLASS B CONCRETE 1,534.000 M3 0275 601-03 CLASS K CONCRETE 642.000 M3 0280 602-01 REIN STEEL BARS 65,729.000 KG 0285 602-02 EPOXY COATED REINFORCING BARS 136,705.000 KG 0290 615-01 STEEL SUPERSTRUCTURE ( 557,098.00 ) LUMP 0295 616-05H250062 STEEL BEARING PILES, HP 250X62, PRE-DRILLED AND DRIVEN 134.000 M 1 FEDERAL PROJECT PAGE 12 Call Order : 005 CONTRACT ID : 9218009 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S310-0016/00-021.61 00 00BR 0016 062 E00 COUNTIES : FAYETTE DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0004 BRIDGE #4065 0300 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 13 Call Order : 006 CONTRACT ID : 9401303 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S305-0007/00-001.06 00 COUNTIES : BROOKE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/99 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 0.70 ) LUMP 0010 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0015 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0020 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0025 204-01 MOBILIZATION LUMP LUMP 0030 207-01 UNCLASSIFIED EXCAVATION 2,169.000 M3 0035 207-02 SUBGRADE 478.000 M3 0040 207-34 FABRIC FOR SEPARATION 3,019.000 M2 0045 211-01 UNCLASSIFIED BORROW EXCAVATION 5,231.000 M3 0050 211-02 ROCK BORROW EXCAVATION 1,125.000 M3 0055 307-01 CLASS I AGGREGATE BASE COURSE 1,096.000 M3 0060 308-01 CLASS 1 AGGREGATE BASE COURSE 583.000 MGR 0065 409-02 BITUMINOUS MATERIAL PRIME 6,920.000 L 0070 502-01300 PORTLAND CEMENT CONCRETE APPRACH SLAB 300MM 234.000 M2 0075 604-010450A2 METALLIC COATED CORRUGATED STEEL PIPE, 450MM, A2 30.000 M 0080 604-102025C5 METALLIC COATED CORRUGATED STEEL PIPE ARCH, 2375X1675MM, C5 40.000 M 0085 604-162025 END SECTION FOR CORRUGATED STEEL PIPE ARCH 2375X1675MM 1.000 EA 0090 607-012 TYPE 1 GUARDRAIL CLASS II 228.600 M 0095 607-25B CUT SLOPE TERMINAL, TYPE B 1.000 EA 0100 636-09 TEMP PVMT MARKING-TAPE 800.000 M 0105 636-11 TRAFFIC CONTROL DEVICE 10,100.000 UN 1 STATE PROJECT PAGE 14 Call Order : 006 CONTRACT ID : 9401303 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S305-0007/00-001.06 00 COUNTIES : BROOKE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/99 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 175.000 EA 0115 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 2.000 EA 0120 636-14 FLAGGER 400.000 HR 0125 636-19 TEMPORARY GUARDRAIL BARRIERS 144.780 M 0130 636-25B WARNING LIGHTS TYPE B 480.000 DA 0135 638-02 RIGHT OF WAY MARKERS 19.000 EA 0140 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0145 640-02 SMALL FIELD OFFICE/STORAGE BUILDING LUMP LUMP 0150 640-03 BUILDING EQUIPMENT LUMP LUMP 0155 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECT LUMP LUMP 0160 LUMP LUMP AA1 0165 LUMP LUMP AA2 0170 402-01SG HMA SKID PAVEMENT, STONE/GRAVEL 186.000 MGR BB1 0175 402-01S HMA SKID PAVEMENT, SLAG 169.000 MGR BB2 SECTION NO. 0002 ROCKDALE BR. #4170 0180 203-01 DISMANTLING STRUCTURES LUMP LUMP 0185 211-02 ROCK BORROW EXCAVATION 633.000 M3 0190 212-01 STRUCTURE EXCAVATION 170.000 M3 0195 212-02 WET EXCAVATION 243.000 M3 0200 212-05 SELECT MATERIAL FOR BACKFILLING 45.000 M3 0205 601-02 CLASS B CONCRETE 262.000 M3 1 STATE PROJECT PAGE 15 Call Order : 006 CONTRACT ID : 9401303 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S305-0007/00-001.06 00 COUNTIES : BROOKE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/99 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 ROCKDALE BR. #4170 0210 601-03 CLASS K CONCRETE 125.000 M3 0215 602-01 REIN STEEL BARS 4,839.000 KG 0220 602-02 EPOXY COATED REINFORCING BARS 47,441.000 KG 0225 615-01 STEEL SUPERSTRUCTURE ( 1.00 ) LUMP 0230 616-04H310079 STEEL BEARING PILES, HP 310X79, DRVN 80.000 M 0235 625-010910 DRILLED CAISSONS 910MM DIAMETER 117.000 M 0240 625-030910 ROCK SOCKET 910MM FOUNDATION 43.000 M 0245 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP SECTION NO. 0003 OLD MILL BR. #4171 0250 203-01 DISMANTLING STRUCTURES LUMP LUMP 0255 211-02 ROCK BORROW EXCAVATION 334.000 M3 0260 212-01 STRUCTURE EXCAVATION 242.000 M3 0265 212-02 WET EXCAVATION 137.000 M3 0270 212-05 SELECT MATERIAL FOR BACKFILLING 32.000 M3 0275 601-02 CLASS B CONCRETE 330.000 M3 0280 601-03 CLASS K CONCRETE 142.000 M3 0285 602-01 REIN STEEL BARS 4,500.000 KG 0290 602-02 EPOXY COATED REINFORCING BARS 35,020.000 KG 0295 615-01 STEEL SUPERSTRUCTURE ( 1.00 ) LUMP 0300 616-04H250062 STEEL BEARING PILES, HP 250X62, DRIVEN 73.000 M 0305 636-05 TEMPORARY STRUCTURES FOR MAINTAINING TRAFFIC LUMP LUMP 1 STATE PROJECT PAGE 16 Call Order : 006 CONTRACT ID : 9401303 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S305-0007/00-001.06 00 COUNTIES : BROOKE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/99 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0003 OLD MILL BR. #4171 0310 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 17 Call Order : 007 CONTRACT ID : 9718316 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S353-0001/00-000.00 00 COUNTIES : WIRT GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/97 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 2,428.000 L 0010 636-11 TRAFFIC CONTROL DEVICE 2,899.000 UN 0015 636-14 FLAGGER 140.000 HR 0020 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE/GRAVE 37.000 MGR AA1 0025 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 34.000 MGR AA2 0030 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 605.000 MGR BB1 0035 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 551.000 MGR BB2 0040 401-17SG HOT-MIX ASPHALT POTHOLE REPAIR, STONE OR GRAVEL 19.000 MGR CC1 0045 401-17S HOT-MIX ASPHALT POTHOLE REPAIR, SLAG 18.000 MGR CC2 0050 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 22.000 MGR DD1 0055 407-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 21.000 MGR DD2 0060 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,128.000 MGR EE1 0065 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,027.000 MGR EE2 0070 407-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 451.000 MGR FF1 0075 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 411.000 MGR FF2 1 STATE PROJECT PAGE 18 Call Order : 008 CONTRACT ID : 9512903 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S331-0039/01-000.00 00 COUNTIES : MONONGALIA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/98 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 415.000 M3 0020 207-34 FABRIC FOR SEPARATION 566.000 M2 0025 211-01 UNCLASSIFIED BORROW EXCAVATION 172.000 M3 0030 211-02 ROCK BORROW EXCAVATION 81.000 M3 0035 307-01 CLASS I AGGREGATE BASE COURSE 159.000 M3 0040 409-02 BITUMINOUS MATERIAL PRIME 833.000 L 0045 607-011 TYPE 1 GUARDRAIL, CLASS I 41.910 M 0050 607-012 TYPE 1 GUARDRAIL CLASS II 51.435 M 0055 636-05 TEMPORARY STRUCTURES FOR MAINTAINING TRAFFIC LUMP LUMP 0060 636-11 TRAFFIC CONTROL DEVICE 3,945.000 UN 0065 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 2.000 EA 0070 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 10.000 EA 0075 636-14 FLAGGER 460.000 HR 0080 636-19 TEMPORARY GUARDRAIL BARRIERS 76.200 M 0085 636-25A WARNING LIGHTS TYPE A 800.000 DA 0090 636-25B WARNING LIGHTS TYPE B 1,290.000 DA 0095 637-01 WATER FOR DUST PALLIATIVE 40.000 M3 0100 638-02 RIGHT OF WAY MARKERS 7.000 EA 0105 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 19 Call Order : 008 CONTRACT ID : 9512903 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S331-0039/01-000.00 00 COUNTIES : MONONGALIA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/98 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 640A-1 MINIMAL FIELD OFFICE LUMP LUMP 0115 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 119.000 MGR BB1 0120 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 108.000 MGR BB2 0125 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 83.000 MGR CC1 0130 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 76.000 MGR CC2 SECTION NO. 0002 BRIDGE 0135 203-01 DISMANTLING STRUCTURES LUMP LUMP 0140 212-05 SELECT MATERIAL FOR BACKFILLING 24.000 M3 0145 218-06 FOUNDATION PROTECTION 585.000 M3 0150 601-02 CLASS B CONCRETE 133.000 M3 0155 602-02 EPOXY COATED REINFORCING BARS 7,662.000 KG 0160 615-02A PRE-FABRICATED STEEL BRIDGE SUPERSTRUCTURE LUMP LUMP 0165 616-04H310110 STEEL BEARING PILES, HP 310X110, DRVN 250.000 M 0170 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0175 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECT LUMP LUMP 1 FEDERAL PROJECT PAGE 20 Call Order : 009 CONTRACT ID : 9709718 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S346-0050/00-016.66 00 0STP 0050 127 EQ0 COUNTIES : TAYLOR DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/98 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RRR 0005 218-03 GABIONS 24.000 M3 0010 229-01 SHOULDERS AND DITCHES 6.377 KM 0015 240-010375 CLEANING CULVERTS 375MM 10.000 M 0020 240-010450 CLEANING CULVERTS 450MM 125.000 M 0025 240-010900 CLEANING CULVERTS 900MM 8.500 M 0030 408-02 BITUMINOUS MATERIAL 11,300.000 L 0035 601-46 MODIFIED CONCRETE END POST 2.000 EA 0040 604-010375A2 METALLIC COATED CORRUGATED STEEL PIPE, 375MM, A2 12.200 M 0045 604-010450A2 METALLIC COATED CORRUGATED STEEL PIPE, 450MM, A2 6.000 M 0050 604-010900A2 METALLIC COATED CORRUGATED STEEL PIPE, 900MM, A2 8.000 M 0055 605-09 TYPE G INLET 20.000 EA 0060 605-50 ADJUSTING CONCRETE HEADWALL 1.000 EA 0065 605-51 TYPE U INLET 2.000 EA 0070 607-011 TYPE 1 GUARDRAIL, CLASS I 3,240.300 M 0075 607-012 TYPE 1 GUARDRAIL CLASS II 185.000 M 0080 607-091 TYPE 1 GUARDRAIL REMOVED AND RESET 189.000 M 0085 607-101A GUARDRAIL REMOVAL 1,947.500 M 0090 607-25A CUT SLOPE TERMINAL, TYPE A 3.000 EA 0095 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 31.000 EA 0100 607-31 SPECIAL APPROACH END TERMINAL 3.000 EA 0105 636-06 PILOT TRUCK AND DRIVER 20.000 DA 1 FEDERAL PROJECT PAGE 21 Call Order : 009 CONTRACT ID : 9709718 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S346-0050/00-016.66 00 0STP 0050 127 EQ0 COUNTIES : TAYLOR DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/98 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RRR 0110 636-08 TEMP PVMT MARKING-PAINT 11,306.000 M 0115 636-11 TRAFFIC CONTROL DEVICE 2,900.000 UN 0120 636-14 FLAGGER 600.000 HR 0125 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 1,050.000 MGR AA1 0130 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 945.000 MGR AA2 0135 308-07SG CLASS 7 AGGREGATE STONE OR GRAVEL 57.000 MGR BB1 0140 308-07S CLASS 7 AGGREGATE, SLAG 51.000 MGR BB2 0145 401-11SG HOT-MIX ASPHALT FOR PAVED GUTTER, ST/GR 34.000 MGR CC1 0150 401-11S HOT-MIX ASPHALT FOR PAVED GUTTER, SLAG 31.000 MGR CC2 0155 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 200.000 MGR DD1 0160 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 180.000 MGR DD2 0165 402-01SG HMA SKID PAVEMENT, STONE/GRAVEL 3,260.000 MGR EE1 0170 402-01S HMA SKID PAVEMENT, SLAG 2,934.000 MGR EE2 1 STATE PROJECT PAGE 22 Call Order : 010 CONTRACT ID : 9632401 Letting Date : 09/03/97 10:00 A.M. PROJECTS : E316-0DSR/00-G22.44 00 FEMA 1137 COUNTIES : HARDY GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/98 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 204-01 MOBILIZATION LUMP LUMP 0010 207-01 UNCLASSIFIED EXCAVATION 84.000 M3 0015 207-02 SUBGRADE 48.000 M3 0020 207-34 FABRIC FOR SEPARATION 298.000 M2 0025 307-01 CLASS I AGGREGATE BASE COURSE 60.000 M3 0030 409-02 BITUMINOUS MATERIAL PRIME 493.000 L 0035 607-013 TYPE 1 GUARDRAIL CLASS III 55.100 M 0040 636-08 TEMP PVMT MARKING-PAINT 200.000 M 0045 636-11 TRAFFIC CONTROL DEVICE 3,360.000 UN 0050 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 2.000 EA 0055 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 50.000 EA 0060 636-14 FLAGGER 100.000 HR 0065 636-25A WARNING LIGHTS TYPE A 3,000.000 DA 0070 636-25B WARNING LIGHTS TYPE B 1,000.000 DA 0075 638-02 RIGHT OF WAY MARKERS 6.000 EA 0080 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0085 640A-1 MINIMAL FIELD OFFICE LUMP LUMP 0090 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECT LUMP LUMP 0095 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 41.000 MGR AA1 0100 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 37.000 MGR AA2 0105 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 18.000 MGR AB1 1 STATE PROJECT PAGE 23 Call Order : 010 CONTRACT ID : 9632401 Letting Date : 09/03/97 10:00 A.M. PROJECTS : E316-0DSR/00-G22.44 00 FEMA 1137 COUNTIES : HARDY GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/98 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 16.000 MGR AB2 SECTION NO. 0002 BRIDGE #4405 0115 203-01 DISMANTLING STRUCTURES LUMP LUMP 0120 211-02 ROCK BORROW EXCAVATION 112.000 M3 0125 212-01 STRUCTURE EXCAVATION 110.000 M3 0130 212-02 WET EXCAVATION 296.000 M3 0135 212-05 SELECT MATERIAL FOR BACKFILLING 20.000 M3 0140 601-02 CLASS B CONCRETE 138.000 M3 0145 602-01 REIN STEEL BARS 4,163.000 KG 0150 602-02 EPOXY COATED REINFORCING BARS 3,414.000 KG 0155 603-01 PRESTRESSED CONCRETE BEAMS 108.000 M 0160 607-011 TYPE 1 GUARDRAIL, CLASS I 26.000 M 0165 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 24 Call Order : 011 CONTRACT ID : 9717801 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S338-0009/03-002.72 00 COUNTIES : POCAHONTAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/26/97 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESTORATION AND REHABILITATION (SLIDE REPAIR #2969) 0005 204-01 MOBILIZATION LUMP LUMP 0010 207-34 FABRIC FOR SEPARATION 470.000 SY 0015 604-50(18) CORRUGATED POLYETHYLENE PIPE 40.000 LF 0020 605-09 TYPE G INLET 1.000 EA 0025 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 287.500 LF 0030 607-39 TREATED WOOD BLOCK (6"X6"X14") 28.000 EA 0035 614-3 CONCRETE LAGGING 1,150.000 SF 0040 636-01 TRAFFIC CONTROL LUMP LUMP 0045 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0050 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0055 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 32.000 TN AA1 0060 308-01S CLASS 1 AGGREGATE, SLAG 29.500 TN AA2 0065 308-07SG CLASS 7 AGGREGATE, STONE OR GRAVEL 91.000 TN BB1 0070 308-07S CLASS 7 AGGREGATE, SLAG 84.000 TN BB2 0075 614-1(W10X68) STEEL PILES 1,550.000 LF CC1 0080 614-1(W10X49) STEEL PILES 1,550.000 LF CC2 1 STATE PROJECT PAGE 25 Call Order : 012 CONTRACT ID : 9719501 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S309-0025/00-002.41 00 COUNTIES : DODDRIDGE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/97 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 229-01 SHOULDERS AND DITCHES 5.460 KM 0010 408-02 BITUMINOUS MATERIAL 6,000.000 L 0015 636-06 PILOT TRUCK AND DRIVER 6.000 DA 0020 636-11 TRAFFIC CONTROL DEVICE 2,320.000 UN 0025 636-14 FLAGGER 200.000 HR 0030 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 530.000 MGR AA1 0035 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 477.000 MGR AA2 0040 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 2,200.000 MGR BB1 0045 407-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,980.000 MGR BB2 1 STATE PROJECT PAGE 26 Call Order : 013 CONTRACT ID : 9719701 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S324-0002/03-000.00 00 COUNTIES : MCDOWELL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/97 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 400.000 L 0010 636-11 TRAFFIC CONTROL DEVICE 1,403.000 UN 0015 636-14 FLAGGER 48.000 HR 0020 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 100.000 MGR AA1 0025 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 91.000 MGR AA2 0030 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 325.000 MGR BB1 0035 407-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 296.000 MGR BB2 1 STATE PROJECT PAGE 27 Call Order : 014 CONTRACT ID : 9719702 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S324-0009/00-000.00 00 COUNTIES : MCDOWELL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/97 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 700.000 L 0010 636-06 PILOT TRUCK AND DRIVER 3.000 DA 0015 636-11 TRAFFIC CONTROL DEVICE 1,403.000 UN 0020 636-14 FLAGGER 72.000 HR 0025 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 150.000 MGR AA1 0030 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 137.000 MGR AA2 0035 401-2(4)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 450.000 MGR BB1 0040 401-2(4)S HOT-MIX ASPHALT WEARING COURSE, SLAG 410.000 MGR BB2 0045 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 100.000 MGR CC1 0050 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 91.000 MGR CC2 0055 401-7SG SRCATCH COURSE, STONE OR GRAVEL 175.000 MGR DD1 0060 401-7S SCRATCH COURSE, SLAG 160.000 MGR DD2 1 STATE PROJECT PAGE 28 Call Order : 015 CONTRACT ID : 9719703 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S328-0010/06-000.00 00 COUNTIES : MERCER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/97 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 950.000 L 0010 636-06 PILOT TRUCK AND DRIVER 3.000 DA 0015 636-11 TRAFFIC CONTROL DEVICE 1,403.000 UN 0020 636-14 FLAGGER 72.000 HR 0025 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 375.000 MGR AA1 0030 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 342.000 MGR AA2 0035 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 425.000 MGR BB1 0040 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 387.000 MGR BB2 0045 407-7SG SCRATCH COURSE, STONE OR GRAVEL 200.000 MGR CC1 0050 407-7S SCRATCH COURSE, SLAG 182.000 MGR CC2 1 STATE PROJECT PAGE 29 Call Order : 016 CONTRACT ID : 9719704 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S328-0013/01-000.00 00 COUNTIES : MERCER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/97 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 1,500.000 L 0010 636-06 PILOT TRUCK AND DRIVER 4.000 DA 0015 636-11 TRAFFIC CONTROL DEVICE 1,610.000 UN 0020 636-14 FLAGGER 96.000 HR 0025 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 650.000 MGR AA1 0030 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 592.000 MGR AA2 0035 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 650.000 MGR BB1 0040 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 592.000 MGR BB2 0045 407-7SG SCRATCH COURSE, STONE OR GRAVEL 350.000 MGR CC1 0050 407-7S SCRATCH COURSE, SLAG 319.000 MGR CC2 1 STATE PROJECT PAGE 30 Call Order : 017 CONTRACT ID : 9719705 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S328-0219/01-000.00 00 COUNTIES : MERCER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/97 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 1,450.000 L 0010 636-06 PILOT TRUCK AND DRIVER 4.000 DA 0015 636-11 TRAFFIC CONTROL DEVICE 2,956.000 UN 0020 636-14 FLAGGER 96.000 HR 0025 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 250.000 MGR AA1 0030 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 228.000 MGR AA2 0035 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 625.000 MGR BB1 0040 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 569.000 MGR BB2 0045 407-7SG SCRATCH COURSE, STONE OR GRAVEL 325.000 MGR CC1 0050 407-7S SCRATCH COURSE, SLAG 296.000 MGR CC2 1 STATE PROJECT PAGE 31 Call Order : 018 CONTRACT ID : 9627703 Letting Date : 09/03/97 10:00 A.M. PROJECTS : U353-0004/00-000.00 00 COUNTIES : WIRT GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/97 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RELOCATION 0005 207-01 UNCLASSIFIED EXCAVATION 238.000 M3 0010 211-01 UNCLASSIFIED BORROW EXCAVATION 515.000 M3 0015 211-08 ROCK BORROW EXCAVATION 75.000 MGR 0020 408-02 BITUMINOUS MATERIAL 7.000 L 0025 409-02 BITUMINOUS MATERIAL PRIME 1,900.000 L 0030 604-010900A2 METALLIC COATED CORRUGATED STEEL PIPE, 900MM, A2 7.200 M 0035 607-011 TYPE 1 GUARDRAIL, CLASS I 19.100 M 0040 607-101A GUARDRAIL REMOVAL 11.400 M 0045 636-11 TRAFFIC CONTROL DEVICE 2,916.000 UN 0050 636-14 FLAGGER 100.000 HR 0055 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0060 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0065 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE/GRAVE 630.000 MGR AA1 0070 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 574.000 MGR AA2 0075 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 82.000 MGR BB1 0080 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 75.000 MGR BB2 0085 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 275.000 MGR CC1 0090 407-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 251.000 MGR CC2 0095 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 84.000 MGR DD1 0100 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 77.000 MGR DD2 0105 407-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 30.000 MGR EE1 1 STATE PROJECT PAGE 32 Call Order : 018 CONTRACT ID : 9627703 Letting Date : 09/03/97 10:00 A.M. PROJECTS : U353-0004/00-000.00 00 COUNTIES : WIRT GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/97 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RELOCATION 0110 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 28.000 MGR EE2 1 STATE PROJECT PAGE 33 Call Order : 019 CONTRACT ID : 9718328 Letting Date : 09/03/97 10:00 A.M. PROJECTS : E316-0010/00-004.35 00 COUNTIES : HARDY GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 04/01/98 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SLIDE CORR 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 211-08 ROCK BORROW EXCAVATION 146.000 MGR 0020 218-07 FABRIC FOR EROSION CONTROL 71.000 M2 0025 308-01 CLASS 1 AGGREGATE BASE COURSE 88.000 MGR 0030 408-02 BITUMINOUS MATERIAL 499.000 L 0035 601-02 CLASS B CONCRETE 5.000 M3 0040 602-01 REIN STEEL BARS 183.000 KG 0045 604-010600A2 METALLIC COATED CORRUGATED STEEL PIPE, 600MM, A2 11.000 M 0050 605-09 TYPE G INLET 1.000 EA 0055 607-012 TYPE 1 GUARDRAIL CLASS II 152.400 M 0060 607-37 BUFFER END SECTION 2.000 EA 0065 614-1H250085 STEEL PILES, HP 250X85 540.000 M 0070 614-3 CONCRETE LAGGING 87.000 M2 0075 633-03 DUMPED ROCK GUTTER 18.000 M3 0080 636-11 TRAFFIC CONTROL DEVICE 7,636.000 UN 0085 636-14 FLAGGER 80.000 HR 0090 636-17 TEMPORARY CONCRETE BARRIERS 16.000 M 0095 636-25B WARNING LIGHTS TYPE B 168.000 DA 0100 638-02 RIGHT OF WAY MARKERS 8.000 EA 0105 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 34 Call Order : 019 CONTRACT ID : 9718328 Letting Date : 09/03/97 10:00 A.M. PROJECTS : E316-0010/00-004.35 00 COUNTIES : HARDY GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 04/01/98 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SLIDE CORR 0110 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0115 308-07SG CLASS 7 AGGREGATE STONE OR GRAVEL 77.000 MGR AA1 0120 308-07S CLASS 7 AGGREGATE, SLAG 70.100 MGR AA2 0125 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 20.000 MGR BB1 0130 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 18.200 MGR BB2 0135 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 74.000 MGR CC1 0140 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 67.340 MGR CC2 1 STATE PROJECT PAGE 35 Call Order : 020 CONTRACT ID : 9717005 Letting Date : 09/03/97 10:00 A.M. PROJECTS : U317-0058/00-003.01 00 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/15/97 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TRAFFIC SIGNAL 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICE 6,900.000 UN 0015 636-14 FLAGGER 200.000 HR 0020 636-21 ELECTRIC ARROW 8.000 DA 0025 660-01 SIGNAL CONTROLLERS LUMP LUMP 0030 660-01 SIGNAL CONTROLLERS LUMP LUMP 0035 660-02LPSC TRAFFIC DETECTORS 12.000 EA 0040 660-03V305 SIGNAL SECTIONS 53.000 EA 0045 660-04C1A SIGNAL SUPPORTS, INSTALLATION ONLY 7.000 EA 0050 660-05H JUNCTION BOXES TYPE H 19.000 EA 0055 660-06 SIGNAL INTERCONNECT LUMP LUMP 0060 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0065 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0070 660-16 AREA MASTER CONTROLLER 1.000 EA 0075 660-17 INTERSECTION PHONE SYSTEM LUMP LUMP 0080 662-07250W LUMINAIRES (250W.) 4.000 EA 0085 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0090 663-045 TYPE V CHANNELIZING LINES 20.000 M 0095 663-055 TYPE V STOP LINES 68.000 M 1 FEDERAL PROJECT PAGE 36 Call Order : 021 CONTRACT ID : 9615905R1 Letting Date : 09/03/97 10:00 A.M. PROJECTS : S310-0019/00-015.48 00 00NH 0019 177 E COUNTIES : FAYETTE DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/98 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CLEAN AND REPAIR NEW RIVER GORGE BRIDGE # 2719.3 0005 204-01 MOBILIZATION LUMP LUMP 0010 615-03 FABRICATED STRUCTURAL STEEL ( 1.00 ) LUMP 0015 615-11 REMOVE AND REPLACE RIVET OR BOLT 800.000 EA 0020 615-19 CAULKING OF SEAMS AND JOINTS IN STRUCTURAL STEEL LUMP LUMP 0025 636-11 TRAFFIC CONTROL DEVICES 23,250.000 UN 0030 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 1.000 EA 0035 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 200.000 EA 0040 636-14 FLAGGER 400.000 HR 0045 636-21 ELECTRIC ARROW 240.000 DA 0050 636-25(B) WARNING LIGHTS 600.000 DA 0055 685-01A ULTRA HIGH PRESSURE WATER JETTING LUMP LUMP 0060 685-01B LOW PRESSURE WATER CLEANING LUMP LUMP