1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- February 09, 1999 LETTING Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its office in Building Five, Room A-148, 1900 Kanawha Boulevard East, Charleston, West Virginia 25305-0430 until 10 A.M. February 09, 1999 and said proposals will be publicly opened and read immediately thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 9218022 S320-0061/00-004.63 00 00BR 1002 007 E00 STRUCTURE REPLACEMENT PRATT BRIDGE OVER PAINT CREEK, CO 61/8, 0.2 MI S CO 83 COUNTY: KANAWHA BRIDGE : #4422 CONCRETE SLAB ON PRESTRESSED GIRDER SPAN(S): 5 ; DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 002 9814920 S309-0018/00-004.60 00 0STP 0018 093 E00 REHABILITATION-RESTORATION-RESURFACING MARKET ROAD CO 29 - CO 13 COUNTY: DODDRIDGE DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 003 9220603 S302-0081/00-021.75 00 00IM 0811 053 DECK REPLACEMENT FALLING WATERS O/P BRIDGE OVER CO 11/5, 1.68 MI S US 11 I/C COUNTY: BERKELEY BRIDGE : #4834 CONCRETE SLAB ON PRESTRESSED GIRDER SPAN(S): 3 ; DBE GOAL: 12 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 004 9728307A X328-0016/25-000.00 00 CONST NEW/RELOC 2 LANE ROAD W/BRIDGE(S) U328-0SCS/00-001.00 00 BRUSH CREEK INDUSTRAIL PARK ACCESS ROAD OVER BRUSH CREEK COUNTY: MERCER BRIDGE : 4750 & 4751PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 2 ; BRIDGE : 4752 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 005 *9822402 U328-0460/00-014.00 00 0NHG 0460 018 E00 TRAFFIC SIGNAL US 460 AT LOCUST ST. PRINCETON COUNTY: MERCER ------------------------------------------------------------------------------------------------------------------------------------ 006 9821907 U306-0010/00-015.39 00 TRAFFIC SIGNAL WV 10 AT HUNTINGTON HIGH SCHOLL HUNTINGTON COUNTY: CABELL ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- February 09, 1999 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 007 *9821906 U306-0060/00-000.44 00 TRAFFIC SIGNAL ADAMS AVE. AT W 23RD. ST. HUNTINGTON COUNTY: CABELL ------------------------------------------------------------------------------------------------------------------------------------ 008 *9822203 U306-0060/00-017.78 00 TRAFFIC SIGNAL US 60 AT CABELL MIDLAND HIGH SCHOOL ONA COUNTY: CABELL ------------------------------------------------------------------------------------------------------------------------------------ 009 *9815209 U322-0119/00-006.41 00 TRAFFIC SIGNAL US 119 AT WV 214 CONNECTOR YAWKEY INTERSECTION COUNTY: LINCOLN ------------------------------------------------------------------------------------------------------------------------------------ 010 9815625 S325-0250/00-015.06 00 0STP 0250 116 E00 REHABILITATION-RESTORATION-RESURFACING FARMINGTON - MANNINGTON RD WV 218 - CO 44 COUNTY: MARION DBE GOAL: 12 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 011 9814921 S331-0857/00-013.18 00 0STP 0857 009 E00 REHABILITATION-RESTORATION-RESURFACING FAIRCHANCE RD CO 71 - PA ST LI COUNTY: MONONGALIA DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 012 *9720612 U310-0009/00-006.38 00 UPGRADE & WIDEN PAVEMENT CUNARD-BROOKLYN ROAD BEGIN:0.11 MI S CO 9/13 END:CO 9/14 COUNTY: FAYETTE ------------------------------------------------------------------------------------------------------------------------------------ 013 *9720613 U310-0019/34-000.00 00 UPGRADE SURFACE TO PAVED OLD WV 16 BEGIN:WV 16 END:CO 19/20 COUNTY: FAYETTE ------------------------------------------------------------------------------------------------------------------------------------ 014 9721315 U338-0039/00-000.00 00 UPGRADE & WIDEN PAVEMENT KENNISON MOUNTAIN ROAD GREENBRIER CO. LINE TO 0.277 MI. E. WV 150 COUNTY: POCAHONTAS ------------------------------------------------------------------------------------------------------------------------------------ 015 *9833707 S349-0016/02-000.00 00 RESURFACING HEAVENER GROVE ROAD CR 16 TO CR 5/12 COUNTY: UPSHUR ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- February 09, 1999 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 016 *9812007 S318-0087/19-000.00 00 STRUCTURE REPLACEMENT KING VIEW ESTATES BRIDGE /ISAACS RUN, WV 87 COUNTY: JACKSON BRIDGE : 4772 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 017 *9828604 S326-0002/00-019.26 00 DRAINAGE IMPROVEMENTS 7TH AND 8TH STREETS, MOUNDSVILLE BEGIN: 0.06 MI N CR 250/88 END: 0.26 MI N CR 250/88 COUNTY: MARSHALL ------------------------------------------------------------------------------------------------------------------------------------ 018 9723304 S343-0017/00-013.03 00 STRUCTURE REPLACEMENT DOG RUN 0.06-0.09 MI W CO 17/9 COUNTY: RITCHIE BRIDGE : 4567 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 019 9704102 S344-0119/00-004.68 00 STRUCTURE REPLACEMENT ROBINSON RUN ARCH BRIDGE 0005 MI S 0.03 MI N CO 11 COUNTY: ROANE BRIDGE : 4451 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 020 *9803581 U351-0009/01-000.00 00 UPGRADE SURFACE TO PAVED HICKORY FLATS RD CR 9 TO 0.70 MI. W. CR 9 COUNTY: WEBSTER ------------------------------------------------------------------------------------------------------------------------------------ 021 *9720519 S321-0006/00-002.59 00 UPGRADE & WIDEN PAVEMENT FINK ROAD CR 6/3 TO CR 9 COUNTY: LEWIS ------------------------------------------------------------------------------------------------------------------------------------ 022 9720514 U321-0009/00-003.63 00 UPGRADE & WIDEN PAVEMENT CAMDEN-CHURCHVILLE RD CR 10 TO DODDRIDGE CO. LINE COUNTY: LEWIS ------------------------------------------------------------------------------------------------------------------------------------ 023 *9720516 S321-0017/00-000.00 00 UPGRADE & WIDEN PAVEMENT COPELY RD GILMER CO. LINE TO CR 18 COUNTY: LEWIS ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- February 09, 1999 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 024 9720518 S321-0021/00-000.00 00 UPGRADE & WIDEN PAVEMENT GOOSEPEN ROAD GILMER CO. LINE TO CR 21/5 COUNTY: LEWIS ------------------------------------------------------------------------------------------------------------------------------------ 025 *9720521 S349-0011/02-000.00 00 UPGRADE & WIDEN PAVEMENT ROCK CAVE RD WV 4 TO CR 11 COUNTY: UPSHUR ------------------------------------------------------------------------------------------------------------------------------------ 026 9722510R1 U320-0025/00-006.30 00 CONST TURN LANE(S) WASHINGTON AVENUE 0.06 MI W - 0.10 MI E CO 25/8 COUNTY: KANAWHA CONTRACT: 9722510 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ 027 9716917R1 X314-0050/36-000.00 00 CONST NEW/RELOC ROAD POTOMAC HIGHLANDS REGIONAL JAIL ACCESS ROAD CO RTE 50/36 AND US RTE 50 COUNTY: HAMPSHIRE CONTRACT: 9716917 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ 028 9708609R1 S317-0020/00-024.62 00 0STP 0020 133 EQ0 SLIDE REPAIR W/PILING SHINNSTON - LUMBERPORT ROAD 1.10 MI N US 19 - 1.15 MI N US 19 COUNTY: HARRISON CONTRACT: 9708609 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of total bid, whichever is greater. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained at the Charleston office. The right is reserved to reject any or all proposals. *These are projects on which any contractor with a Category "W" Prequalification Rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals on all projects will be furnished at twenty-five dollars ($25.00) per set. Extra plans will be furnished at fifteen dollars ($15.00) per set and extra proposals will be furnished at ten dollars ($10.00) per proposal. Cross sections will be furnished at fifty dollars ($50.00) per set. All will be furnished without refund and transmitted at your risk. The above noted project information will be available in the Contract Unit, Construction Section, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305 and may also be ordered by calling (304)558-2874. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national orign in consideration for an award. No proposals for these projects will be issued after 3:00 P.M. on the day prior to the letting. It is necessary to advise your approximate uncompleted workload when ordering plans and proposals. Announcement, opening and reading of bids received will be in the order as designated in the "Notice to Contractors". Sealed proposals may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9 A.M. and 10 A.M., the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division Of Highways John J. Welch, Jr., Director Project Control Division 1 1 FEDERAL PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 9218022 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S320-0061/00-004.63 00 00BR 1002 007 E00 COUNTIES : KANAWHA DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: RICHARD GENTHNER DESCRIPTION: PRATT BRIDGE ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN,PAVE 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 16,477.000 M3 0020 207-02 SUBGRADE 590.000 M3 0025 207-34 FABRIC FOR SEPARATION 882.000 M2 0030 211-01 UNCLASSIFIED BORROW EXCAVATION 10,463.000 M3 0035 211-02 ROCK BORROW EXCAVATION 1,035.000 M3 0040 307-01 CLASS I AGGREGATE BASE COURSE 958.000 M3 0045 308-01 CLASS 1 AGGREGATE BASE COURSE 29.000 MGR 0050 311-06 OPEN GRADED FREE DRAINING BASE 67.000 M3 0055 408-02 BITUMINOUS MATERIAL 1,000.000 L 0060 409-02 BITUMINOUS MATERIAL PRIME 3,345.000 L 0065 501-05150 NON-REIN PORTLAND CEMENT CONCRETE PAVEMENT 150MM 112.000 M2 0070 502-01300 PORTLAND CEMENT CONCRETE APPRACH SLAB 300MM 176.000 M2 0075 601-02 CLASS B CONCRETE 1.300 M3 0080 604-010600A2 METALLIC COATED CORRUGATED STEEL PIPE, 600MM, A2 9.100 M 0085 604-3703753 REINFORCED CONCRETE PIPE, 375MM, CLIII 8.900 M 0090 604-3704503 REINFORCED CONCRETE PIPE, 450MM, CLIII 22.300 M 0095 605-04 TYPE B INLET 1.000 EA 0100 605-091 TYPE G INLET, MODIFIED 1.000 EA 1 FEDERAL PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 9218022 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S320-0061/00-004.63 00 00BR 1002 007 E00 COUNTIES : KANAWHA DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN,PAVE 0105 606-29 FREE DRAINING BASE (FDB) TRENCH 65.000 M 0110 606-30 OUTLET PIPE 5.000 M 0115 607-011 TYPE 1 GUARDRAIL, CLASS I 337.000 M 0120 607-65 FLARED END TREATMENT 3.000 EA 0125 610-011 PLAIN CONCRETE CURBING, TYPE I 1.000 M 0130 636-05 TEMPORARY STRUCTURES FOR MAINTAINING TRAFFIC LUMP LUMP 0135 636-07 ERADICATION PAVEMENT MARKINGS 360.000 M 0140 636-09 TEMP PVMT MARKING-TAPE 1,250.000 M 0145 636-11 TRAFFIC CONTROL DEVICE 9,810.000 UN 0150 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 6.000 EA 0155 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 250.000 EA 0160 636-14 FLAGGER 2,800.000 HR 0165 636-19 TEMPORARY GUARDRAIL BARRIERS 288.000 M 0170 636-25A WARNING LIGHTS TYPE A 900.000 DA 0175 636-25B WARNING LIGHTS TYPE B 1,200.000 DA 0180 636-25C WARNING LIGHTS TYPE C 1,200.000 DA 0185 637-01 WATER FOR DUST PALLIATIVE 105.000 M3 0190 638-02 RIGHT OF WAY MARKERS 9.000 EA 0195 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0200 640-02 SMALL FIELD OFFICE/STORAGE BUILDING LUMP LUMP 0205 640-03 BUILDING EQUIPMENT LUMP LUMP 1 FEDERAL PROJECT PAGE 3 Call Order : 001 CONTRACT ID : 9218022 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S320-0061/00-004.63 00 00BR 1002 007 E00 COUNTIES : KANAWHA DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN,PAVE 0210 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0215 652-01 AGRICULTURAL LIMESTONE 2.200 MGR 0220 652-021 FERTILIZER 10-20-10 0.560 MGR 0225 652-022 UREA FORMALDEHYDE FERTILIZER 0.220 MGR 0230 652-031 SEED MIXTURES B, C-1, OR C-2 0.300 KG 0235 652-032 SEED MIXTURES D 14.700 KG 0240 652-041 STRAW OR HAY MULCH 3.000 MGR 0245 652-042 WOOD CELLULOSE FIBER MULCH 0.020 MGR 0250 655-01 MATTING 83.000 M2 0255 655-02A PERMANENT EROSION MATTING, TYPE A 75.000 M2 0260 655-02B PERMANENT EROSION MATTING, TYPE B 22.000 M2 0265 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,491.000 MGR AA1 0270 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 1,422.000 MGR AA2 0275 402-01(1)SG HOT MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 181.000 MGR BB1 0280 402-01(1)S HOT MIX ASPHALT SKID PAVEMENT, SLAG 173.000 MGR BB2 SECTION NO. 0002 BRIDGE NO. 4422 0285 203-01 DISMANTLING STRUCTURES LUMP LUMP 0290 207-34 FABRIC FOR SEPARATION 172.000 M2 0295 211-02 ROCK BORROW EXCAVATION 521.000 M3 0300 212-01 STRUCTURE EXCAVATION 59.000 M3 0305 212-05 SELECT MATERIAL FOR BACKFILLING 114.000 M3 1 FEDERAL PROJECT PAGE 4 Call Order : 001 CONTRACT ID : 9218022 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S320-0061/00-004.63 00 00BR 1002 007 E00 COUNTIES : KANAWHA DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 BRIDGE NO. 4422 0310 601-02 CLASS B CONCRETE 309.000 M3 0315 601-03 CLASS K CONCRETE 431.000 M3 0320 602-01 REIN STEEL BARS 61,054.000 KG 0325 602-02 EPOXY COATED REINFORCING BARS 71,028.000 KG 0330 603-18(915) PRESTRESSED CONCRETE I BEAMS 915MM 208.000 M 0335 603-19(1675) PRESTRESSED CONCRETE BULB T BEAMS 1675MM 359.000 M 0340 608-0124 RIGHT OF WAY FENCE CHAIN LINK 2.4M 115.000 M 0345 625-010760 DRILLED CAISSONS 760MM DIA. TYPE I 193.800 M 0350 625-011525 DRILLED CAISSONS 1525MM DIA. TYPE I 66.400 M 0355 625-030760 ROCK SOCKET 760MM FOUNDATION 16.000 M 0360 625-031525 ROCK SOCKET 1525MM FOUNDATION 15.900 M 0365 625-041525 DRILLED CAISSON TEST HOLE 1525MM LUMP LUMP 0370 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0375 679-06 TEST SLAB LUMP LUMP 0380 679-02 LATEX MODIFIED PORTLAND CEMENT MORTAR OR CONCRETE 71.000 M3 CC1 OVERLAYMENT OF BRIDGE DECK 0385 679-04 MICROSILICA CONCRETE OVERLAY 71.000 M3 CC2 1 FEDERAL PROJECT PAGE 5 Call Order : 002 CONTRACT ID : 9814920 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S309-0018/00-004.60 00 0STP 0018 093 E00 COUNTIES : DODDRIDGE DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: DON WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R 0005 218-03 GABIONS 62.000 CY 0010 229-01 SHOULDERS AND DITCHES 4.780 LM 0015 240-01(18) CLEANING CULVERTS 443.000 LF 0020 240-01(24) CLEANING CULVERTS 45.000 LF 0025 408-02 BITUMINOUS MATERIAL 2,860.000 GA 0030 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 24.000 LF 0035 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 18.000 LF 0040 605-09 TYPE G INLET 2.000 EA 0045 605-50 ADJUSTING CONCRETE HEADWALL 17.000 EA 0050 607-01(II) TYPE 1 GUARDRAIL 3,125.000 LF 0055 636-06 PILOT TRUCK AND DRIVER 10.000 DA 0060 636-11 TRAFFIC CONTROL DEVICES 2,860.000 UN 0065 636-14 FLAGGER 400.000 HR 0070 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 1,050.000 TN AA1 0075 308-01S CLASS 1 AGGREGATE, SLAG 945.000 TN AA2 0080 308-07SG CLASS 7 AGGREGATE, STONE OR GRAVEL 107.000 TN BB1 0085 308-07S CLASS 7 AGGREGATE, SLAG 96.000 TN BB2 0090 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 3,750.000 TN CC1 0095 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 3,375.000 TN CC2 0100 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 125.000 TN DD1 0105 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 113.000 TN DD2 1 FEDERAL PROJECT PAGE 6 Call Order : 003 CONTRACT ID : 9220603 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S302-0081/00-021.75 00 00IM 0811 053 COUNTIES : BERKELEY DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/30/99 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 4,729.000 M3 0020 207-02 SUBGRADE 1,137.000 M3 0025 207-34 FABRIC FOR SEPARATION 11,313.000 M2 0030 311-06 OPEN GRADED FREE DRAINING BASE 758.000 M3 0035 408-02 BITUMINOUS MATERIAL 2,841.000 L 0040 415-05 REMOVE EXISTING PAVEMENT SURFACE 2,023.000 M2 0045 502-01300 PORTLAND CEMENT CONCRETE APPRACH SLAB 300MM 570.000 M2 0050 605-02 TYPE B MANHOLE 2.000 EA 0055 605-03 TYPE A INLET 2.000 EA 0060 605-04 TYPE B INLET 1.000 EA 0065 605-08 TYPE F INLET 4.000 EA 0070 605-09 TYPE G INLET 3.000 EA 0075 605-091 TYPE G INLET, MODIFIED 1.000 EA 0080 605-12 ADJUSTING MISCELLANEOUS TYPES OF INLETS 7.000 EA 0085 606-29 FREE DRAINING BASE (FDB) TRENCH 2,440.000 M 0090 606-30 OUTLET PIPE 62.000 M 0095 607-011 TYPE 1 GUARDRAIL, CLASS I 176.000 M 0100 607-051 TYPE 5 GUARDRAIL CLASS I 457.000 M 0105 607-091 TYPE 1 GUARDRAIL REMOVED AND RESET 33.000 M 1 FEDERAL PROJECT PAGE 7 Call Order : 003 CONTRACT ID : 9220603 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S302-0081/00-021.75 00 00IM 0811 053 COUNTIES : BERKELEY DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/30/99 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 607-51 REMOVE AND RESET GUARDRAIL POST 22.000 EA 0115 607-65 FLARED END TREATMENT 2.000 EA 0120 610-011 PLAIN CONCRETE CURBING, TYPE I 22.000 M 0125 610-065 MEDIAN, TYPE V 198.000 M 0130 633-01 CONCRETE GUTTER 282.700 M2 0135 636-07 ERADICATION PAVEMENT MARKINGS 3,500.000 M 0140 636-09 TEMP PVMT MARKING-TAPE 3,400.000 M 0145 636-10 TEMPORARY RAISED PAVEMENT MARKERS 1,500.000 EA 0150 636-11 TRAFFIC CONTROL DEVICE 26,140.000 UN 0155 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 4.000 EA 0160 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 160.000 EA 0165 636-14 FLAGGER 800.000 HR 0170 636-14B TRAFFIC DIRECTOR 300.000 HR 0175 636-17 TEMPORARY CONCRETE BARRIERS 1,500.000 M 0180 636-18 REMOVING AND RESETTING TEMPORARY CONCRETE BARRIERS 2,200.000 M 0185 636-21 ELECTRIC ARROW 60.000 DA 0190 636-22 CHANGEABLE MESSAGE SIGN 500.000 DA 0195 636-25B WARNING LIGHTS TYPE B 13,200.000 DA 0200 636-25C WARNING LIGHTS TYPE C 23,600.000 DA 0205 636-28 SHADOW VEHICLE 15.000 DA 0210 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 FEDERAL PROJECT PAGE 8 Call Order : 003 CONTRACT ID : 9220603 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S302-0081/00-021.75 00 00IM 0811 053 COUNTIES : BERKELEY DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/30/99 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0215 640-01 STANDARD FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0220 640-03 BUILDING EQUIPMENT LUMP LUMP 0225 642-031 DITCH CHECKS 13.000 EA 0230 642-041 TEMPORARY SEED 56.000 KG 0235 642-044 SEED MIXTURE L 56.000 KG 0240 642-051 STRAW OR HAY MULCH 2.100 MGR 0245 642-06 FERTILIZER 0.200 MGR 0250 642-10 AGRICULTURAL LIMESTONE 2.100 MGR 0255 642-11 HAY OR STRAW BALES 48.000 EA 0260 642-12 SILT FENCE 260.000 M 0265 652-01 AGRICULTURAL LIMESTONE 2.000 MGR 0270 652-021 FERTILIZER 10-20-10 0.200 MGR 0275 652-035 SEED MIXTURE L 51.200 KG 0280 652-041 STRAW OR HAY MULCH 1.900 MGR 0285 655-01 MATTING 72.000 M2 0290 663-0112W EDGE LINE WHITE TYPE II 1,480.000 M 0295 663-0112Y EDGE LINE YELLOW TYPE II 1,480.000 M 0300 663-0212W LANE LINE OR CENTER LINE WHITE TYPE II 370.000 M 0305 663-12P2 RAISED PAVEMENT MARKER TYPE P-2 65.000 EA 0310 664-014 IMPACT ATTENUATING DEVICE TYPE IV 2.000 EA 0315 664-014A REMOVE AND RESET G.R.E.A.T. ATTENUATING DEVICE TYPE IV 4.000 EA 1 FEDERAL PROJECT PAGE 9 Call Order : 003 CONTRACT ID : 9220603 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S302-0081/00-021.75 00 00IM 0811 053 COUNTIES : BERKELEY DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/30/99 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0320 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 6,565.000 MGR AA1 0325 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 6,018.000 MGR AA2 0330 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,071.000 MGR AB1 0335 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 982.000 MGR AB2 0340 401-14SG HMA SHOULDER REPAIR, STONE OR GRAVEL 109.000 MGR AC1 0345 401-14S HMA SHOULDER REPAIR, SLAG 100.000 MGR AC2 0350 402-01(1)SG HOT MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 844.000 MGR AD1 0355 402-01(1)S HOT MIX ASPHALT SKID PAVEMENT, SLAG 774.000 MGR AD2 0360 604-020450C2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, 450MM, C2 63.500 M AE1 0365 604-250450A2 CORRUGATED ALUMINUM ALLOY PIPE 450MM, A2 63.500 M AE2 0370 604-760450A2 ALUMINUM COATED CORRUGATED STEEL PIPE, 450MM, A2 63.500 M AE3 0375 604-110450C7 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE ARCH, 525 X 14.500 M AF1 375MM, C7 0380 604-290450A7 CORRUGATED ALUMINUM ALLOY PIPE ARCH, 525X375MM, A7 14.500 M AF2 0385 604-770450A7 ALUMINUM COATED CORRUGATED STEEL PIPE ARCH, 525X375MM, A7 14.500 M AF3 0390 604-020600C2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, 600MM, C2 18.500 M AG1 0395 604-250600A2 CORRUGATED ALUMINUM ALLOY PIPE 600MM, A2 18.500 M AG2 0400 604-760600A2 ALUMINUM COATED CORRUGATED STEEL PIPE, 600MM, A2 18.500 M AG3 SECTION NO. 0002 FALLING WATERS BR. #4834 0405 203-01 DISMANTLING STRUCTURES LUMP LUMP 0410 212-01 STRUCTURE EXCAVATION 1,220.000 M3 0415 212-05 SELECT MATERIAL FOR BACKFILLING 235.000 M3 1 FEDERAL PROJECT PAGE 10 Call Order : 003 CONTRACT ID : 9220603 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S302-0081/00-021.75 00 00IM 0811 053 COUNTIES : BERKELEY DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/30/99 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 FALLING WATERS BR. #4834 0420 218-04200 CRUSHED ROCK SLOPE PROTECTION 200MM 1,020.000 M2 0425 601-02 CLASS B CONCRETE 637.000 M3 0430 601-03 CLASS K CONCRETE 364.000 M3 0435 602-01 REIN STEEL BARS 56,853.000 KG 0440 602-02 EPOXY COATED REINFORCING BARS 74,625.000 KG 0445 603-16 PRESTRESSED CONCRETE BOX BEAMS (686MM X 1220MM) 509.000 M 0450 616-04H310079 STEEL BEARING PILES, HP 310X79, DRVN 362.000 M 0455 616-05H250062 STEEL BEARING PILES, HP 250X62, PRE-DRILLED AND DRIVEN 488.000 M 0460 616-05H310079 STEEL BEARING PILES, HP 310X79, PRE-DRILLED AND DRIVEN 80.000 M 0465 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0470 679-06 TEST SLAB LUMP LUMP 0475 679-02 LATEX MODIFIED PORTLAND CEMENT MORTAR OR CONCRETE 68.000 M3 BA1 OVERLAYMENT OF BRIDGE DECK 0480 679-04 MICROSILICA CONCRETE OVERLAY 68.000 M3 BA2 SECTION NO. 0003 COMPUTER SYSTEM 0485 640-04 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP 1 STATE PROJECT PAGE 11 Call Order : 004 CONTRACT ID : 9728307A Letting Date : 02/09/99 10:00 A.M. PROJECTS : X328-0016/25-000.00 00 U328-0SCS/00-001.00 00 COUNTIES : MERCER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/30/99 ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE SITE 1,2 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 2,378.000 CY 0020 211-02 ROCK BORROW EXCAVATION 198.000 CY 0025 212-01 STRUCTURE EXCAVATION 366.000 CY 0030 212-02 WET EXCAVATION 218.000 CY 0035 212-05 SELECT MATERIAL FOR BACKFILLING 34.000 CY 0040 601-02 CLASS B CONCRETE 301.000 CY 0045 602-01 REINFORCING STEEL BARS 28,776.000 LB 0050 603-01 PRESTRESSED CONCRETE BEAMS 636.000 LF 0055 607-01(III) TYPE 1 GUARDRAIL 446.000 LF 0060 636-11 TRAFFIC CONTROL DEVICES 2,668.000 UN 0065 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 2.000 EA 0070 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 102.000 EA 0075 636-14 FLAGGER 100.000 HR 0080 636-25(A) WARNING LIGHTS 400.000 DA 0085 636-25(B) WARNING LIGHTS 240.000 DA 0090 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0095 640A-1 MINIMAL FIELD OFFICE LUMP LUMP 0100 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP SECTION NO. 0002 ROADWAY 1 STATE PROJECT PAGE 12 Call Order : 004 CONTRACT ID : 9728307A Letting Date : 02/09/99 10:00 A.M. PROJECTS : X328-0016/25-000.00 00 U328-0SCS/00-001.00 00 COUNTIES : MERCER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/30/99 ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 ROADWAY 0105 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0110 204-01 MOBILIZATION LUMP LUMP 0115 207-01 UNCLASSIFIED EXCAVATION 991.000 CY 0120 207-02 SUBGRADE 343.000 CY 0125 207-34 FABRIC FOR SEPARATION 2,522.000 SY 0130 211-01 UNCLASSIFIED BORROW EXCAVATION 19.000 CY 0135 307-01 CLASS 1 AGGREGATE BASE COURSE 736.000 CY 0140 408-02 BITUMINOUS MATERIAL 85.000 GA 0145 409-02 BITUMINOUS MATERIAL 955.000 GA 0150 607-01(III) TYPE 1 GUARDRAIL 775.000 LF 0155 636-11 TRAFFIC CONTROL DEVICES 3,197.000 UN 0160 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 1.000 EA 0165 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 50.000 EA 0170 636-14 FLAGGER 200.000 HR 0175 636-19 TEMPORARY GUARDRAIL BARRIER 575.000 LF 0180 636-25(B) WARNING LIGHTS 720.000 DA 0185 638-02 RIGHT OF WAY MARKERS 12.000 EA 0190 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0195 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0200 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 598.000 TN AA1 0205 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 544.000 TN AA2 1 STATE PROJECT PAGE 13 Call Order : 004 CONTRACT ID : 9728307A Letting Date : 02/09/99 10:00 A.M. PROJECTS : X328-0016/25-000.00 00 U328-0SCS/00-001.00 00 COUNTIES : MERCER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/30/99 ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 ROADWAY 0210 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 163.000 TN BB1 0215 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 149.000 TN BB2 SECTION NO. 0003 BRIDGE 3 0220 203-01 DISMANTLING STRUCTURES LUMP LUMP 0225 204-01 MOBILIZATION LUMP LUMP 0230 211-02 ROCK BORROW EXCAVATION 157.000 CY 0235 212-01 STRUCTURE EXCAVATION 294.000 CY 0240 212-02 WET EXCAVATION 139.000 CY 0245 212-05 SELECT MATERIAL FOR BACKFILLING 35.000 CY 0250 601-02 CLASS B CONCRETE 196.000 CY 0255 602-01 REINFORCING STEEL BARS 16,856.000 LB 0260 603-01 PRESTRESSED CONCRETE BEAMS 508.000 LF 0265 607-01(III) TYPE 1 GUARDRAIL 124.000 LF 0270 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 1 STATE PROJECT PAGE 14 Call Order : 005 CONTRACT ID : 9822402 Letting Date : 02/09/99 10:00 A.M. PROJECTS : U328-0460/00-014.00 00 0NHG 0460 018 E00 COUNTIES : MERCER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/24/99 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TRAFFIC SIGNAL 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICES 5,100.000 UN 0015 636-14 FLAGGER 100.000 HR 0020 636-21 ELECTRIC ARROW 8.000 DA 0025 660-01(01) SIGNAL CONTROLLERS LUMP LUMP 0030 660-02(LPS-C) TRAFFIC DETECTORS 8.000 EA 0035 660-03(V-12) SIGNAL SECTIONS 39.000 EA 0040 660-04(C1) SIGNAL SUPPORTS 2.000 EA 0045 660-04(C1L) SIGNAL SUPPORTS 2.000 EA 0050 660-05(H) JUNCTION BOXES, TYPE H 10.000 EA 0055 660-07(01) MISCELLANEOUS SIGNAL LUMP LUMP 0060 662-07(250)W LUMINAIRES 2.000 EA 0065 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0070 663-05(V) TYPE V, STOP LINES 175.000 LF 1 STATE PROJECT PAGE 15 Call Order : 006 CONTRACT ID : 9821907 Letting Date : 02/09/99 10:00 A.M. PROJECTS : U306-0010/00-015.39 00 COUNTIES : CABELL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/03/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TRAFFIC SIGNAL 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICES 5,200.000 UN 0015 636-14 FLAGGER 120.000 HR 0020 636-21 ELECTRIC ARROW 4.000 DA 0025 660-01 SIGNAL CONTROLLERS LUMP LUMP 0030 660-02(LPS-C) TRAFFIC DETECTORS 6.000 EA 0035 660-03(V-12) SIGNAL SECTIONS 29.000 EA 0040 660-04(C1)A SIGNAL SUPPORTS, INSTALLATION ONLY 4.000 EA 0045 660-05(H) JUNCTION BOXES, TYPE H 4.000 EA 0050 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0055 660-17 INTERSECTION PHONE SYSTEM LUMP LUMP 0060 662-02 GALVANIZED STEEL CONDUIT LUMP LUMP 0065 662-02 GALVANIZED STEEL CONDUIT LUMP LUMP 0070 662-06(H18X18 JUNCTION BOX 7.000 EA 0075 662-07(250)W LUMINAIRES 7.000 EA 0080 662-08(10) CABLE ( 1.00 ) LUMP 0085 662-08(9) CABLE ( 1.00 ) LUMP 0090 662-10(40-12V LIGHTING SUPPORT, TYPE V 3.000 EA 0095 662-10(40-16V LIGHTING SUPPORT, TYPE V 2.000 EA 0100 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0105 662-15(10) ELECTRICAL TESTS ( 1.00 ) LUMP 1 STATE PROJECT PAGE 16 Call Order : 006 CONTRACT ID : 9821907 Letting Date : 02/09/99 10:00 A.M. PROJECTS : U306-0010/00-015.39 00 COUNTIES : CABELL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/03/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TRAFFIC SIGNAL 0110 662-15(9) ELECTRICAL TESTS ( 1.00 ) LUMP 0115 662-16 SYSTEM MODIFICATION LUMP LUMP 0120 663-05(V) TYPE V, STOP LINES 70.000 LF 1 STATE PROJECT PAGE 17 Call Order : 007 CONTRACT ID : 9821906 Letting Date : 02/09/99 10:00 A.M. PROJECTS : U306-0060/00-000.44 00 COUNTIES : CABELL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/21/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TRAFFIC SIGNAL 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICES 4,200.000 UN 0015 636-14 FLAGGER 80.000 HR 0020 636-21 ELECTRIC ARROW 2.000 DA 0025 660-01 SIGNAL CONTROLLERS LUMP LUMP 0030 660-02(LPS-C) TRAFFIC DETECTORS 6.000 EA 0035 660-03(V-12) SIGNAL SECTIONS 18.000 EA 0040 660-03(V-8) SIGNAL SECTIONS 6.000 EA 0045 660-04(C1)A SIGNAL SUPPORTS, INSTALLATION ONLY 3.000 EA 0050 660-05(H) JUNCTION BOXES, TYPE H 1.000 EA 0055 660-06(1) SIGNAL INTERCONNECT LUMP LUMP 0060 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0065 660-17 INTERSECTION PHONE SYSTEM LUMP LUMP 0070 663-05(V) TYPE V, STOP LINES 55.000 LF 1 STATE PROJECT PAGE 18 Call Order : 008 CONTRACT ID : 9822203 Letting Date : 02/09/99 10:00 A.M. PROJECTS : U306-0060/00-017.78 00 COUNTIES : CABELL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/03/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TRAFFIC SINGAL 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICES 4,800.000 UN 0015 636-14 FLAGGER 100.000 HR 0020 660-01 SIGNAL CONTROLLERS LUMP LUMP 0025 660-02(LPS-C) TRAFFIC DETECTORS 6.000 EA 0030 660-03(V-12) SIGNAL SECTIONS 20.000 EA 0035 660-04(C1) SIGNAL SUPPORTS 1.000 EA 0040 660-04(C1L) SIGNAL SUPPORTS 2.000 EA 0045 660-05(H) JUNCTION BOXES, TYPE H 7.000 EA 0050 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0055 662-07(250)W LUMINAIRES 2.000 EA 0060 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0065 663-05(V) TYPE V, STOP LINES 65.000 LF 1 STATE PROJECT PAGE 19 Call Order : 009 CONTRACT ID : 9815209 Letting Date : 02/09/99 10:00 A.M. PROJECTS : U322-0119/00-006.41 00 COUNTIES : LINCOLN GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/03/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 FLASHER 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICES 4,600.000 UN 0015 636-14 FLAGGER 40.000 HR 0020 636-21 ELECTRIC ARROW 2.000 DA 0025 660-01(01) SIGNAL CONTROLLERS LUMP LUMP 0030 660-03(V-12) SIGNAL SECTIONS 9.000 EA 0035 660-04(C1L) SIGNAL SUPPORTS 2.000 EA 0040 660-07(01) MISCELLANEOUS SIGNAL LUMP LUMP 0045 662-07(250)W LUMINAIRES 2.000 EA 0050 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 1 FEDERAL PROJECT PAGE 20 Call Order : 010 CONTRACT ID : 9815625 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S325-0250/00-015.06 00 0STP 0250 116 E00 COUNTIES : MARION DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/11/99 RES. ENG.: DON WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R 0005 218-03 GABIONS 30.000 CY 0010 229-01 SHOULDERS AND DITCHES 3.450 LM 0015 408-02 BITUMINOUS MATERIAL 2,500.000 GA 0020 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 14.000 LF 0025 605-09 TYPE G INLET 7.000 EA 0030 605-51 TYPE U INLET 1.000 EA 0035 607-01(I) TYPE 1 GUARDRAIL 8,200.000 LF 0040 607-01(II) TYPE 1 GUARDRAIL 1,312.500 LF 0045 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 825.000 LF 0050 607-10-1(A) GUARDRAIL REMOVAL 8,775.000 LF 0055 607-25(A) CUT SLOPE TERMINAL, TYPE A 1.000 EA 0060 607-25(B) CUT SLOPE TERMINAL, TYPE B 1.000 EA 0065 607-42 STEEL POSTS (6') 10.000 EA 0070 607-65 FLARED END TREATMENT 24.000 EA 0075 607-66 TANGENT END TREATMENT 1.000 EA 0080 636-06 PILOT TRUCK AND DRIVER 9.000 DA 0085 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4" SOLID LINE 30,600.000 LF 0090 636-11 TRAFFIC CONTROL DEVICES 2,140.000 UN 0095 636-14 FLAGGER 320.000 HR 0100 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 800.000 TN AA1 0105 308-01S CLASS 1 AGGREGATE, SLAG 720.000 TN AA2 1 FEDERAL PROJECT PAGE 21 Call Order : 010 CONTRACT ID : 9815625 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S325-0250/00-015.06 00 0STP 0250 116 E00 COUNTIES : MARION DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/11/99 RES. ENG.: DON WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R 0110 308-07 CLASS 7 AGGREGATE BASE COURSE 18.000 CY BB1 0115 308-07S CLASS 7 AGGREGATE, SLAG 16.000 TN BB2 0120 401-7SG SCRATCH COURSE, STONE OR GRAVEL 1,330.000 TN CC1 0125 401-7S SCRATCH COURSE, SLAG 1,200.000 TN CC2 0130 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 2,750.000 TN DD1 0135 402-01(1)S HMA SKID PVT, (W-1) SLAG 2,475.000 TN DD2 1 FEDERAL PROJECT PAGE 22 Call Order : 011 CONTRACT ID : 9814921 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S331-0857/00-013.18 00 0STP 0857 009 E00 COUNTIES : MONONGALIA DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/28/99 RES. ENG.: DON WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R 0005 229-01 SHOULDERS AND DITCHES 0.500 LM 0010 240-01(18) CLEANING CULVERTS 286.000 LF 0015 240-01(24) CLEANING CULVERTS 38.000 LF 0020 408-02 BITUMINOUS MATERIAL 1,650.000 GA 0025 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 80.000 LF 0030 605-09 TYPE G INLET 17.000 EA 0035 605-09-1 TYPE G INLET, MODIFIED 1.000 EA 0040 605-51 TYPE U INLET 2.000 EA 0045 607-01(II) TYPE 1 GUARDRAIL 1,575.000 LF 0050 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 1,775.000 LF 0055 607-10-1(A) GUARDRAIL REMOVAL 137.500 LF 0060 636-06 PILOT TRUCK AND DRIVER 12.000 DA 0065 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4" SOLID LINE 21,200.000 LF 0070 636-11 TRAFFIC CONTROL DEVICES 1,960.000 UN 0075 636-14 FLAGGER 280.000 HR 0080 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 1,175.000 TN AA1 0085 308-01S CLASS 1 AGGREGATE, SLAG 1,058.000 TN AA2 0090 308-07SG CLASS 7 AGGREGATE, STONE OR GRAVEL 128.000 TN BB1 0095 308-07S CLASS 7 AGGREGATE, SLAG 116.000 TN BB2 0100 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 2,665.000 TN CC1 0105 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 2,400.000 TN CC2 1 FEDERAL PROJECT PAGE 23 Call Order : 011 CONTRACT ID : 9814921 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S331-0857/00-013.18 00 0STP 0857 009 E00 COUNTIES : MONONGALIA DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/28/99 RES. ENG.: DON WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R 0110 401-7SG SCRATCH COURSE, STONE OR GRAVEL 460.000 TN DD1 0115 401-7S SCRATCH COURSE, SLAG 415.000 TN DD2 0120 401-11SG HOT-MIX ASPHALT FOR PAVED GUTTER, ST/GR 10.000 TN EE1 0125 401-11S HOT-MIX ASPHALT FOR PAVED GUTTER, SLAG 9.000 TN EE2 0130 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 1,775.000 TN FF1 0135 402-01(1)S HMA SKID PVT, (W-1) SLAG 1,580.000 TN FF2 1 STATE PROJECT PAGE 24 Call Order : 012 CONTRACT ID : 9720612 Letting Date : 02/09/99 10:00 A.M. PROJECTS : U310-0009/00-006.38 00 COUNTIES : FAYETTE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 409-02 BITUMINOUS MATERIAL 275.000 GA 0010 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 40.000 LF 0015 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 245.000 LF 0020 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 35.000 LF 0025 636-11 TRAFFIC CONTROL DEVICES 2,875.000 UN 0030 636-14 FLAGGER 120.000 HR 0035 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 800.000 TN AA1 0040 308-08S CLASS 8 AGGREGATE, SLAG 728.000 TN AA2 0045 407-02(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 545.000 TN BB1 0050 407-02(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 496.000 TN BB2 0055 407-3SG HOT-MIX ASPHAPLT PATCH AND LEVEL COURSE, STONE OR GRAVEL 375.000 TN CC1 0060 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 342.000 TN CC2 0065 407-7SG SCRATCH COURSE, STONE OR GRAVEL 265.000 TN DD1 0070 407-7S SCRACTH COURSE, SLAG 242.000 TN DD2 1 STATE PROJECT PAGE 25 Call Order : 013 CONTRACT ID : 9720613 Letting Date : 02/09/99 10:00 A.M. PROJECTS : U310-0019/34-000.00 00 COUNTIES : FAYETTE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 409-02 BITUMINOUS MATERIAL 2,020.000 GA 0010 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 150.000 LF 0015 636-11 TRAFFIC CONTROL DEVICES 2,461.000 UN 0020 636-14 FLAGGER 100.000 HR 0025 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 900.000 TN AA1 0030 308-08S CLASS 8 AGGREGATE, SLAG 819.000 TN AA2 0035 407-1(II)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 775.000 TN BB1 0040 407-1(II)S HOT-MIX ASPHALT BASE COURSE, SLAG 705.000 TN BB2 0045 407-2(I)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 400.000 TN CC1 0050 407-2(I)S HOT-MIX ASPHALT WEARING COURSE, SLAG 364.000 TN CC2 1 STATE PROJECT PAGE 26 Call Order : 014 CONTRACT ID : 9721315 Letting Date : 02/09/99 10:00 A.M. PROJECTS : U338-0039/00-000.00 00 COUNTIES : POCAHONTAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/15/99 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, BASE WIDENING TO 22', DRAINAGE, AND STONE 0005 211-08 ROCK BORROW EXCAVATION 25.000 TN 0010 218-03 GABIONS 7.000 CY 0015 408-02 BITUMINOUS MATERIAL 2,800.000 GA 0020 604-37(18)II REINFORCED CONCRETE PIPE 12.000 LF 0025 604-50(18) CORRUGATED POLYETHYLENE PIPE 740.000 LF 0030 604-50(24) CORRUGATED POLYETHYLENE PIPE 300.000 LF 0035 604-50(36) CORRUGATED POLYETHYLENE PIPE 80.000 LF 0040 605-09 TYPE G INLET 2.000 EA 0045 636-06 PILOT TRUCK AND DRIVER 34.000 DA 0050 636-11 TRAFFIC CONTROL DEVICES 4,120.000 UN 0055 636-14 FLAGGER 680.000 HR 0060 663-01(II)W EDGE LINE WHITE 14.440 MI 0065 663-02(II)Y LANE LINE OR CENTER LINE YELLOW 7.220 MI 0070 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 5,000.000 TN AA1 0075 308-08S CLASS 8 AGGREGATE, SLAG 4,550.000 TN AA2 0080 308-09SG CLASS 9 AGGREGATE STONE OR GRAVEL 48.000 TN BB1 0085 308-09S CLASS 9 AGGREGATE SLAG 44.000 TN BB2 0090 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,050.000 TN CC1 0095 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 955.000 TN CC2 0100 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 5,200.000 TN DD1 0105 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 4,732.000 TN DD2 1 STATE PROJECT PAGE 27 Call Order : 014 CONTRACT ID : 9721315 Letting Date : 02/09/99 10:00 A.M. PROJECTS : U338-0039/00-000.00 00 COUNTIES : POCAHONTAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/15/99 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, BASE WIDENING TO 22', DRAINAGE, AND STONE 0110 407-7SG SCRATCH COURSE, STONE OR GRAVEL 5,200.000 TN EE1 0115 407-7S SCRACTH COURSE, SLAG 4,732.000 TN EE2 1 STATE PROJECT PAGE 28 Call Order : 015 CONTRACT ID : 9833707 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S349-0016/02-000.00 00 COUNTIES : UPSHUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/01/99 RES. ENG.: WILLIAM FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 620.000 GA 0010 636-11 TRAFFIC CONTROL DEVICES 6,810.000 UN 0015 636-14 FLAGGER 100.000 HR 0020 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 834.000 TN AA1 0025 308-08S CLASS 8 AGGREGATE, SLAG 759.000 TN AA2 0030 407-02(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,140.000 TN BB1 0035 407-02(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,037.000 TN BB2 0040 407-3SG HOT-MIX ASPHAPLT PATCH AND LEVEL COURSE, STONE OR GRAVEL 1,140.000 TN CC1 0045 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 1,037.000 TN CC2 1 STATE PROJECT PAGE 29 Call Order : 016 CONTRACT ID : 9812007 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S318-0087/19-000.00 00 COUNTIES : JACKSON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/17/99 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 334.000 CY 0020 207-32 FABRIC FOR SUBSURFACE DRAINAGE 300.000 SY 0025 212-05 SELECT MATERIAL FOR BACKFILLING 11.000 CY 0030 218-06 FOUNDATION PROTECTION 193.000 CY 0035 409-02 BITUMINOUS MATERIAL 221.000 GA 0040 601-02 CLASS B CONCRETE 23.000 CY 0045 602-02 EPOXY COATED REINFORCING STEELBARS 4,594.000 LB 0050 603-16(21X36) PRESTRESSED CONCRETE BOX BEAMS 21X36 475.000 LF 0055 607-01(I) TYPE 1 GUARDRAIL 250.000 LF 0060 607-65 FLARED END TREATMENT 2.000 EA 0065 616-04HP12X74 STEEL BEARING PILES, DRIVEN 220.000 LF 0070 616-05HP12X74 STEEL BEARING PILES, PRE-DRILLED AND DRIVEN 110.000 LF 0075 636-01 TRAFFIC CONTROL LUMP LUMP 0080 636-05 TEMPORARY STRUCTURES FOR MAINTAINING TRAFFIC ( 1.00 ) LUMP 0085 638-02 RIGHT OF WAY MARKERS 6.000 EA 0090 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0095 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0100 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 243.000 TN AA1 0105 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 226.000 TN AA2 1 STATE PROJECT PAGE 30 Call Order : 016 CONTRACT ID : 9812007 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S318-0087/19-000.00 00 COUNTIES : JACKSON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/17/99 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0110 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 24.000 TN BB1 0115 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 22.000 TN BB2 0120 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 111.000 TN CC1 0125 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 103.000 TN CC2 1 STATE PROJECT PAGE 31 Call Order : 017 CONTRACT ID : 9828604 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S326-0002/00-019.26 00 COUNTIES : MARSHALL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/15/99 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DRAINAGE IMPROVEMENT 0005 506-01 CONCRETE PAVEMENT REPAIR 67.000 SY 0010 609-01 CONCRETE SIDEWALK 74.000 SY 0015 609-02 BED COURSE MATERIAL 8.000 CY 0020 610-02(I) INTEGRAL CONCRETE CURBING 60.000 LF 0025 636-11 TRAFFIC CONTROL DEVICES 1,622.000 UN 0030 636-21 ELECTRIC ARROW 14.000 DA 0035 675-07(4) PLASTIC SEWER PIPE 35.000 LF 0040 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 11.000 TN AA1 0045 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 10.000 TN AA2 1 STATE PROJECT PAGE 32 Call Order : 018 CONTRACT ID : 9723304 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S343-0017/00-013.03 00 COUNTIES : RITCHIE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/30/99 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 162.000 CY 0020 207-32 FABRIC FOR SUBSURFACE DRAINAGE 253.000 SY 0025 211-01 UNCLASSIFIED BORROW EXCAVATION 139.000 CY 0030 212-05 SELECT MATERIAL FOR BACKFILLING 12.000 CY 0035 218-06 FOUNDATION PROTECTION 253.000 CY 0040 409-02 BITUMINOUS MATERIAL 210.000 GA 0045 601-02 CLASS B CONCRETE 25.000 CY 0050 602-02 EPOXY COATED REINFORCING STEELBARS 4,604.000 LB 0055 603-16(27X36) PRESTRESSED CONCRETE BOX BEAMS 27X36 476.000 LF 0060 607-01(II) TYPE 1 GUARDRAIL 250.000 LF 0065 616-04HP10X57 STEEL BEARING PILES, DRIVEN 404.000 LF 0070 636-01 TRAFFIC CONTROL LUMP LUMP 0075 636-05 TEMPORARY STRUCTURES FOR MAINTAINING TRAFFIC ( 1.00 ) LUMP 0080 638-02 RIGHT OF WAY MARKERS 11.000 EA 0085 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0090 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0095 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 220.000 TN AA1 0100 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 207.000 TN AA2 0105 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 19.000 TN BB1 1 STATE PROJECT PAGE 33 Call Order : 018 CONTRACT ID : 9723304 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S343-0017/00-013.03 00 COUNTIES : RITCHIE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/30/99 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0110 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 18.000 TN BB2 0115 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 28.000 TN CC1 0120 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 27.000 TN CC2 1 STATE PROJECT PAGE 34 Call Order : 019 CONTRACT ID : 9704102 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S344-0119/00-004.68 00 COUNTIES : ROANE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/30/99 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 80.000 CY 0020 207-32 FABRIC FOR SUBSURFACE DRAINAGE 320.000 SY 0025 211-01 UNCLASSIFIED BORROW EXCAVATION 450.000 CY 0030 212-05 SELECT MATERIAL FOR BACKFILLING 16.000 CY 0035 218-06 FOUNDATION PROTECTION 428.000 CY 0040 409-02 BITUMINOUS MATERIAL 242.000 GA 0045 502-01(12I) PORTLAND CEMENT CONCRETE APPROACH SLAB 112.000 SY 0050 601-02 CLASS B CONCRETE 23.000 CY 0055 601-03 CLASS K CONCRETE 49.000 CY 0060 602-02 EPOXY COATED REINFORCING STEELBARS 13,510.000 LB 0065 603-16(17X36) PRESTRESSED CONCRETE BOX BEAMS 17X36 434.500 LF 0070 6047416-4X511 ALUMINUM BOX CULVERT 67.500 LF 0075 607-01(I) TYPE 1 GUARDRAIL 175.000 LF 0080 607-65 FLARED END TREATMENT 2.000 EA 0085 616-04HP10X57 STEEL BEARING PILES, DRIVEN 260.000 LF 0090 636-01 TRAFFIC CONTROL LUMP LUMP 0095 636-05 TEMPORARY STRUCTURES FOR MAINTAINING TRAFFIC ( 1.00 ) LUMP 0100 638-02 RIGHT OF WAY MARKERS 8.000 EA 0105 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 35 Call Order : 019 CONTRACT ID : 9704102 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S344-0119/00-004.68 00 COUNTIES : ROANE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/30/99 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0110 640A-1 MINIMAL FIELD OFFICE LUMP LUMP 0115 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0120 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 130.000 TN AA1 0125 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 122.000 TN AA2 0130 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 170.000 TN BB1 0135 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 160.000 TN BB2 0140 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 38.000 TN CC1 0145 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 36.000 TN CC2 1 STATE PROJECT PAGE 36 Call Order : 020 CONTRACT ID : 9803581 Letting Date : 02/09/99 10:00 A.M. PROJECTS : U351-0009/01-000.00 00 COUNTIES : WEBSTER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: WILLIAM FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 409-02 BITUMINOUS MATERIAL 4,435.000 GA 0010 636-06 PILOT TRUCK AND DRIVER 8.000 DA 0015 636-11 TRAFFIC CONTROL DEVICES 2,675.000 UN 0020 636-14 FLAGGER 160.000 HR 0025 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 578.000 TN AA1 0030 308-01S CLASS 1 AGGREGATE, SLAG 526.000 TN AA2 0035 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 2,033.000 TN BB1 0040 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,850.000 TN BB2 0045 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 407.000 TN CC1 0050 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 370.000 TN CC2 1 STATE PROJECT PAGE 37 Call Order : 021 CONTRACT ID : 9720519 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S321-0006/00-002.59 00 COUNTIES : LEWIS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: WILLIAM FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SPOT WIDEN, UPGRADE PAVEMENT 0005 408-02 BITUMINOUS MATERIAL 961.000 GA 0010 636-06 PILOT TRUCK AND DRIVER 10.000 DA 0015 636-11 TRAFFIC CONTROL DEVICES 7,636.000 UN 0020 636-14 FLAGGER 200.000 HR 0025 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 1,443.000 TN AA1 0030 308-08S CLASS 8 AGGREGATE, SLAG 1,313.000 TN AA2 0035 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,762.000 TN BB1 0040 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,603.000 TN BB2 0045 407-3SG HOT-MIX ASPHAPLT PATCH AND LEVEL COURSE, STONE OR GRAVEL 1,922.000 TN CC1 0050 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 1,749.000 TN CC2 1 STATE PROJECT PAGE 38 Call Order : 022 CONTRACT ID : 9720514 Letting Date : 02/09/99 10:00 A.M. PROJECTS : U321-0009/00-003.63 00 COUNTIES : LEWIS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: WILLIAM FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SPOT WIDEN, UPGRADE PAVEMENT 0005 207-01 UNCLASSIFIED EXCAVATION 705.000 CY 0010 408-02 BITUMINOUS MATERIAL 1,279.000 GA 0015 409-02 BITUMINOUS MATERIAL 3,845.000 GA 0020 636-06 PILOT TRUCK AND DRIVER 13.000 DA 0025 636-11 TRAFFIC CONTROL DEVICES 11,155.000 UN 0030 636-14 FLAGGER 260.000 HR 0035 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 1,136.000 TN AA1 0040 308-08S CLASS 8 AGGREGATE, SLAG 1,034.000 TN AA2 0045 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,410.000 TN BB1 0050 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,283.000 TN BB2 0055 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 2,346.000 TN CC1 0060 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 2,135.000 TN CC2 0065 407-3SG HOT-MIX ASPHAPLT PATCH AND LEVEL COURSE, STONE OR GRAVEL 2,346.000 TN DD1 0070 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 2,135.000 TN DD2 1 STATE PROJECT PAGE 39 Call Order : 023 CONTRACT ID : 9720516 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S321-0017/00-000.00 00 COUNTIES : LEWIS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: WILLIAM FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SPOT WIDEN, UPGRADE PAVEMENT 0005 408-02 BITUMINOUS MATERIAL 459.000 GA 0010 636-06 PILOT TRUCK AND DRIVER 5.000 DA 0015 636-11 TRAFFIC CONTROL DEVICES 3,500.000 UN 0020 636-14 FLAGGER 100.000 HR 0025 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 603.000 TN AA1 0030 308-08S CLASS 8 AGGREGATE, SLAG 549.000 TN AA2 0035 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 842.000 TN BB1 0040 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 766.000 TN BB2 0045 407-3SG HOT-MIX ASPHAPLT PATCH AND LEVEL COURSE, STONE OR GRAVEL 1,010.000 TN CC1 0050 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 919.000 TN CC2 1 STATE PROJECT PAGE 40 Call Order : 024 CONTRACT ID : 9720518 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S321-0021/00-000.00 00 COUNTIES : LEWIS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: WILLIAM FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SPOT WIDEN, UPGRADE PAVEMENT 0005 408-02 BITUMINOUS MATERIAL 1,199.000 GA 0010 636-06 PILOT TRUCK AND DRIVER 13.000 DA 0015 636-11 TRAFFIC CONTROL DEVICES 9,300.000 UN 0020 636-14 FLAGGER 260.000 HR 0025 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 1,791.000 TN AA1 0030 308-08S CLASS 8 AGGREGATE, SLAG 1,630.000 TN AA2 0035 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 2,198.000 TN BB1 0040 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 2,000.000 TN BB2 0045 407-3SG HOT-MIX ASPHAPLT PATCH AND LEVEL COURSE, STONE OR GRAVEL 2,747.000 TN CC1 0050 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 2,500.000 TN CC2 1 STATE PROJECT PAGE 41 Call Order : 025 CONTRACT ID : 9720521 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S349-0011/02-000.00 00 COUNTIES : UPSHUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: WILLIAM FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SPOT WIDEN, UPGRADE PAVEMENT 0005 408-02 BITUMINOUS MATERIAL 680.000 GA 0010 636-06 PILOT TRUCK AND DRIVER 7.000 DA 0015 636-11 TRAFFIC CONTROL DEVICES 7,640.000 UN 0020 636-14 FLAGGER 140.000 HR 0025 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 1,191.000 TN AA1 0030 308-08S CLASS 8 AGGREGATE, SLAG 1,083.000 TN AA2 0035 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,247.000 TN BB1 0040 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,135.000 TN BB2 0045 407-3SG HOT-MIX ASPHAPLT PATCH AND LEVEL COURSE, STONE OR GRAVEL 1,020.000 TN CC1 0050 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 928.000 TN CC2 1 STATE PROJECT PAGE 42 Call Order : 026 CONTRACT ID : 9722510R1 Letting Date : 02/09/99 10:00 A.M. PROJECTS : U320-0025/00-006.30 00 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CONSTRUCT TURN LANE(S) 0005 207-01 UNCLASSIFIED EXCAVATION 1,172.190 CY 0010 207-34 FABRIC FOR SEPARATION 1,312.000 SY 0015 212-05 SELECT MATERIAL FOR BACKFILLING 41.570 CY 0020 408-02 BITUMINOUS MATERIAL 211.000 GA 0025 409-02 BITUMINOUS MATERIAL 674.000 GA 0030 601-02 CLASS B CONCRETE 3.000 CY 0035 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 30.000 LF 0040 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 36.000 LF 0045 604-01(30)A2 METALLIC COATED CORRUGATED STEEL PIPE 8.000 LF 0050 604-01(42)A2 METALLIC COATED CORRUGATED STEEL PIPE 15.000 LF 0055 604-09(15) END SECION FOR CORRUGATED STEEL PIPE 1.000 EA 0060 604-09(30) END SECION FOR CORRUGATED STEEL PIPE 1.000 EA 0065 605-04 TYPE B INLET 2.000 EA 0070 605-09 TYPE G INLET 1.000 EA 0075 608-01(4F) RIGHT-OF-WAY FENCE, CHAIN LINK TYPE 100.000 LF 0080 608-09 RIGHT OF WAY FENCE REMOVED AND RESET 350.000 LF 0085 610-05(II) BITUMINOUS CURBING 330.000 LF 0090 636-11 TRAFFIC CONTROL DEVICES 4,669.000 UN 0095 636-14 FLAGGER 1,000.000 HR 0100 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0105 663-01-1(II)W EDGE LINE, WHITE 1,290.000 LF 1 STATE PROJECT PAGE 43 Call Order : 026 CONTRACT ID : 9722510R1 Letting Date : 02/09/99 10:00 A.M. PROJECTS : U320-0025/00-006.30 00 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CONSTRUCT TURN LANE(S) 0110 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 1,925.000 LF 0115 663-04(II) TYPE II CHANNELIZING LINES 100.000 LF 0120 663-05(V) TYPE V, STOP LINES 24.000 LF 0125 663-07(V)Y TYPE V, STRIPES, YELLOW 137.000 LF 0130 663-10(V) TYPE V, LANE ARROWS 4.000 EA 0135 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 275.000 TN AA1 0140 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 275.000 TN AA2 0145 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 356.000 TN BB1 0150 308-01S CLASS 1 AGGREGATE, SLAG 321.000 TN BB2 0155 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 507.000 TN CC1 0160 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 457.000 TN CC2 0165 401-7SG SCRATCH COURSE, STONE OR GRAVEL 90.000 TN DD1 0170 401-7S SCRATCH COURSE, SLAG 82.000 TN DD2 0175 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 170.000 TN EE1 0180 402-01(1)S HMA SKID PVT, (W-1) SLAG 155.000 TN EE2 0185 407-1(II)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 57.000 TN FF1 0190 407-1(II)S HOT-MIX ASPHALT BASE COURSE, SLAG 52.000 TN FF2 0195 407-2(I)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 53.000 TN GG1 0200 407-2(I)S HOT-MIX ASPHALT WEARING COURSE, SLAG 48.000 TN GG2 1 STATE PROJECT PAGE 44 Call Order : 027 CONTRACT ID : 9716917R1 Letting Date : 02/09/99 10:00 A.M. PROJECTS : X314-0050/36-000.00 00 COUNTIES : HAMPSHIRE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 8,739.000 CY 0020 207-02 SUBGRADE 1,446.000 CY 0025 207-34 FABRIC FOR SEPARATION 7,557.000 SY 0030 211-02 ROCK BORROW EXCAVATION 3,010.000 CY 0035 307-01 CLASS 1 AGGREGATE BASE COURSE 548.000 CY 0040 308-01 CLASS 1 AGGREGATE BASE COURSE 645.000 TN 0045 311-06 OPEN GRADED FREE DRAINING BASE COURSE 344.000 CY 0050 601-02 CLASS B CONCRETE 5.190 CY 0055 604-77(49X33) ALUMINUM COATED CORRUGATED STEEL PIPE ARCH, B2 543.000 LF 0060 605-09 TYPE G INLET 13.000 EA 0065 606-22 CRUSHED STONE, GRAVEL,OR SILICA SAND FOR UNDERDRAINS 9.000 CY 0070 606-25(6) UNDERDRAIN PIPE 93.000 LF 0075 606-29 FREE DRAINING BASE (FDB) TRENCH 1,360.000 LF 0080 606-30 OUTLET PIPE 277.000 LF 0085 607-01(I) TYPE 1 GUARDRAIL 80.000 LF 0090 607-10-1(A) GUARDRAIL REMOVAL 118.000 LF 0095 607-65 FLARED END TREATMENT 1.000 EA 0100 633-01 CONCRETE GUTTER 173.000 SY 0105 633-03 DUMPED ROCK GUTTER 139.000 CY 1 STATE PROJECT PAGE 45 Call Order : 027 CONTRACT ID : 9716917R1 Letting Date : 02/09/99 10:00 A.M. PROJECTS : X314-0050/36-000.00 00 COUNTIES : HAMPSHIRE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 636-11 TRAFFIC CONTROL DEVICES 4,845.000 UN 0115 636-14 FLAGGER 400.000 HR 0120 636-25(B) WARNING LIGHTS 400.000 DA 0125 637-01 WATER FOR DUST PALLIATIVE 16.500 MG 0130 638-02 RIGHT OF WAY MARKERS 26.000 EA 0135 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0140 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0145 640-03 BUILDING EQUIPMENT LUMP LUMP 0150 642-01 TEMPORARY BERMS 600.000 LF 0155 642-02 SLOPE DRAINS 14.000 LF 0160 642-03-1 DITCH CHECKS 97.000 EA 0165 642-04-04 SEED MIXTURE L 232.000 LB 0170 642-05-1 STRAW OR HAY MULCH 3.840 TN 0175 642-06 FERTILIZER 0.770 TN 0180 642-10 AGRICULTURAL LIMESTONE 2.880 TN 0185 642-12 SILT FENCE 3,648.000 LF 0190 652-01 AGRICULTURAL LIMESTONE 1.920 TN 0195 652-02-1 FERTILIZER, 10-20-10 1.680 TN 0200 652-02-2 UREA FORMALDEHIDE FERTILIZER 0.280 TN 0205 652-03-05 SEED MIXTURE L 232.000 LB 0210 652-04-1 STRAW OR HAY MULCH 3.840 TN 1 STATE PROJECT PAGE 46 Call Order : 027 CONTRACT ID : 9716917R1 Letting Date : 02/09/99 10:00 A.M. PROJECTS : X314-0050/36-000.00 00 COUNTIES : HAMPSHIRE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0215 655-02(B) PERMANENT EROSION MATTING-TYPE B 1,128.000 SY 0220 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,228.000 TN AA1 0225 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,116.000 TN AA2 0230 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 305.000 TN BB1 0235 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 277.000 TN BB2 0240 604-76(42)A2 ALUMINUM COATED CORRUGATED STEEL PIPE 838.000 LF CC1 0245 604-04(42)A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STL PIPE 838.000 LF CC2 0250 604-37(42)II REINFORCED CONCRETE PIPE 838.000 LF CC3 0255 604-76(24)A2 ALUMINUM COATED CORRUGATED STEEL PIPE 396.000 LF DD1 0260 604-04(24)A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STL PIPE 396.000 LF DD2 0265 604-37(24)II REINFORCED CONCRETE PIPE 396.000 LF DD3 0270 604-76(18)A2 ALUMINUM COATED CORRUGATED STEEL PIPE 685.000 LF EE1 0275 604-04(18)A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STL PIPE 685.000 LF EE2 0280 604-37(18)II REINFORCED CONCRETE PIPE 685.000 LF EE3 0285 604-09(18) END SECION FOR CORRUGATED STEEL PIPE 1.000 EA FF1 0290 604-38(18) REINFORCED CONCRETE END SECTION FOR ROUND CONCRETE PIPE 1.000 EA FF2 0295 604-09(24) END SECION FOR CORRUGATED STEEL PIPE 1.000 EA GG1 0300 604-38(24) REINFORCED CONCRETE END SECTION FOR ROUND CONCRETE PIPE 1.000 EA GG2 SECTION NO. 0002 BOX CULVERT EXTENSION 0305 203-01 DISMANTLING STRUCTURES LUMP LUMP 0310 211-02 ROCK BORROW EXCAVATION 4.000 CY 1 STATE PROJECT PAGE 47 Call Order : 027 CONTRACT ID : 9716917R1 Letting Date : 02/09/99 10:00 A.M. PROJECTS : X314-0050/36-000.00 00 COUNTIES : HAMPSHIRE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 BOX CULVERT EXTENSION 0315 212-05 SELECT MATERIAL FOR BACKFILLING 10.000 CY 0320 601-02 CLASS B CONCRETE 7.000 CY 0325 602-02 EPOXY COATED REINFORCING STEELBARS 1,720.000 LB 0330 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 FEDERAL PROJECT PAGE 48 Call Order : 028 CONTRACT ID : 9708609R1 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S317-0020/00-024.62 00 0STP 0020 133 EQ0 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: DON WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SLIDE REPAIR 0005 204-01 MOBILIZATION LUMP LUMP 0010 207-34 FABRIC FOR SEPARATION 270.000 M2 0015 229-01 SHOULDERS AND DITCHES 0.125 KM 0020 240-010600 CLEANING CULVERTS 600MM 14.000 M 0025 408-02 BITUMINOUS MATERIAL 245.000 L 0030 605-09 TYPE G INLET 1.000 EA 0035 606-270200 CORRUGATED POLYETHYLENE UNDERDRAIN PIPE 200MM 92.000 M 0040 607-091 TYPE 1 GUARDRAIL REMOVED AND RESET 80.010 M 0045 607-29-2 BREAKAWAY CABLE TERMINAL, REMOVED AND STORED 1.000 EA 0050 607-65 FLARED END TREATMENT 1.000 EA 0055 636-11 TRAFFIC CONTROL DEVICE 3,859.000 UN 0060 636-14 FLAGGER 980.000 HR 0065 636-25B WARNING LIGHTS TYPE B 126.000 DA 0070 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0075 640A-1 MINIMAL FIELD OFFICE LUMP LUMP 0080 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0085 670-04200251 DUCTILE IRON PIPE TYPE II CL51, 200MM 11.000 M 0090 670-07200150 PLASTIC PIPE CLASS 150, 200MM 415.000 M 0095 670-09150 GATE VALVE AND VALVE BOX, 150MM 1.000 EA 0100 670-09200 GATE VALVE AND VALVE BOX, 200MM 1.000 EA 0105 670-10030005 STEEL CASING PIPE, 300MM 4.76MM 11.000 M 1 FEDERAL PROJECT PAGE 49 Call Order : 028 CONTRACT ID : 9708609R1 Letting Date : 02/09/99 10:00 A.M. PROJECTS : S317-0020/00-024.62 00 0STP 0020 133 EQ0 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: DON WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SLIDE REPAIR 0110 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 18.000 MGR AA1 0115 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 20.000 MGR AA2 0120 308-07S CLASS 7 AGGREGATE, SLAG 216.000 MGR BB1 0125 308-07SG CLASS 7 AGGREGATE STONE OR GRAVEL 240.000 MGR BB2 0130 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 41.000 MGR CC1 0135 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 45.000 MGR CC2 0140 402-014S HOT-MIX ASPHALT SKID PAVEMENT, SLAG 81.000 MGR DD1 0145 402-014SG HOT-MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 90.000 MGR DD2 0150 614-1W310283 STEEL PILES, W 310X283 1,210.000 M EE1 0155 614-1W310202 STEEL PILES, W 310X202 1,210.000 M EE2 0160 614-1H360174 STEEL PILES, HP 360X174 1,210.000 M EE3 0165 614-150 CONCRETE LAGGING 150MM 153.000 M2 FF1 0170 614-4 TIMBER LAGGING 153.000 M2 FF2