1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- September 28, 1999 LETTING Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its office in Building Five, Room A-148, 1900 Kanawha Boulevard East, Charleston, West Virginia 25305-0430 until 10 A.M. September 28, 1999 and said proposals will be publicly opened and read immediately thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 9816882 S301-0046/01-001.61 00 CONST NEW/RELOC 2 LANE ROAD W/BRIDGE(S) HALL TRUSS BRIDGE OVER BUCKHANNON RIVER, 0.01 MI W OF CO 46 COUNTY: BARBOUR BRIDGE : #3346 CONCRETE SLAB ON PRESTRESSED GIRDER SPAN(S): 3 ; ------------------------------------------------------------------------------------------------------------------------------------ 002 9514505 U336-0033/04-000.00 00 0PFH 0088 020 E00 UPGRADE & WIDEN PAVEMENT SPRUCE KNOB ROAD INTER. OF US RTE 33 & 33/4 TO INTER. OF 33/4 & FOREST RT 112 COUNTY: PENDLETON ------------------------------------------------------------------------------------------------------------------------------------ 003 *9912714 U304-0004/00-026.08 00 INTERSECTION IMPROVEMENT WV4 AT BRAXTON CO. HIGH SCHOOL WIDENING AND TRAFFIC SIGNAL BETWEEN SUTTON AND FLATWOODS COUNTY: BRAXTON ------------------------------------------------------------------------------------------------------------------------------------ 004 *9834404 U342-0219/00-030.09 02 STP 0219 109 E00 RAILROAD CROSSING IMPROVEMENT HUTTONSVILLE TO ELKINS ROAD 0.18 MILES NORTH OF CR 21 AND AT CR 21 COUNTY: RANDOLPH REMARKS : PRE-QUALIFICATION NOT REQUIRED. ------------------------------------------------------------------------------------------------------------------------------------ 005 9816601 U311-0030/00-000.00 00 CONST NEW/RELOC 2 LANE ROAD DUCK RUN FEDERAL PRISON ROAD WV 5 - PRISON SITE COUNTY: GILMER ------------------------------------------------------------------------------------------------------------------------------------ 006 9922102 U334-0020/21-002.00 00 RESURFACING VAUGHAN - CLAY COUNTY LINE BEGIN:2.00 MI N FAYETTE COUNTY LINE END:CLAY COUNTY LINE COUNTY: NICHOLAS ------------------------------------------------------------------------------------------------------------------------------------ 007 9732504R1 S303-0003/25-000.01 00 STRUCTURE REPLACEMENT INDIAN CREEK ROAD BRIDGE REPLACEMENT .01 MILE EAST OF WV 3 COUNTY: BOONE BRIDGE : 4636 CONCRETE SLAB ON CONCRETE GIRDER SPAN(S): 2 ; CONTRACT: 9732504R DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- September 28, 1999 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 008 9729307 S310-0025/00-000.71 00 STRUCTURE REPLACEMENT DUNLOUP BRIDGE #3 CO. RTE. 25 COUNTY: FAYETTE BRIDGE : #4616 CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 009 9720609 U310-0002/00-001.50 00 UPGRADE & WIDEN PAVEMENT SMITHERS - BELL CREEK ROAD BEGIN:CO 2/3 END:0.01 MI S CO 2/19 COUNTY: FAYETTE ------------------------------------------------------------------------------------------------------------------------------------ 010 9720610 U310-0038/00-003.63 00 UPGRADE & WIDEN PAVEMENT OLD COUNTY 18 BEGIN:0.01 MI S CO 38/4 END:WV 16 COUNTY: FAYETTE ------------------------------------------------------------------------------------------------------------------------------------ 011 9720611 U310-0060/05-000.00 00 UPGRADE & WIDEN PAVEMENT CHESTNUTBURG RD +1 BEGIN:0.24 MI N US 19 END:CO 60/25 COUNTY: FAYETTE ------------------------------------------------------------------------------------------------------------------------------------ 012 *9905501 S329-0015/00-000.97 00 RESURFACING KELLER RUN BRIDGE KELLER RUN, 0.97 MI N WV 28 COUNTY: MINERAL ------------------------------------------------------------------------------------------------------------------------------------ 013 9836201AR1U330-0049/00-018.08 00 CONST NEW/RELOC ROAD LICK CREEK RD 0.07 MI S - 0.15 N CO 49/1 COUNTY: MINGO ------------------------------------------------------------------------------------------------------------------------------------ 014 9720626 U345-0012/02-000.00 00 UPGRADE & WIDEN PAVEMENT MARTHAS CHAPEL ROAD BEGIN:CO 3/21 END: CO 3/1 COUNTY: SUMMERS ------------------------------------------------------------------------------------------------------------------------------------ 015 *9923702 U349-0016/00-005.39 00 UPGRADE & WIDEN PAVEMENT LITTLE SAND RUN RD CR 16/4 TO CR 9/1 COUNTY: UPSHUR ------------------------------------------------------------------------------------------------------------------------------------ 016 *9923701 U349-0016/03-000.00 00 UPGRADE & WIDEN PAVEMENT BAILEY RIDGE - STEEL RD CR 16 TO CR 16 (2RTS) COUNTY: UPSHUR ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- September 28, 1999 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 017 9916281AR1G020-0MCS/0T-001.00 00 2 BUILDING CONSTRUCTION G020-0MCS/0T-001.00 00 3 MCS&T HEADQUARTERS BUILDING G020-0MCS/0T-001.00 00 4 BUILDING #1 COUNTY: KANAWHA CONTRACT: 9916281A DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. REMARKS : PRE-QUAL.NOT REQUIRED.MANDATORY PRE-BID 8/31/99 10:00AM SITE ------------------------------------------------------------------------------------------------------------------------------------ 018 9915581R2 G049-0UCM/0H-001.00 04 BUILDING CONSTRUCTION CORRIDOR H MAINTENANCE BUILDING DISTRICT SEVEN COUNTY: UPSHUR REMARKS : PRE-QUALIFICATION NOT REQUIRED ------------------------------------------------------------------------------------------------------------------------------------ 019 9821821 S320-0079/00-001.00 00 SIGNING I-79 LOGO SIGNING RENOVATION MINK SHOALS TO PA COUNTY: KANAWHA ------------------------------------------------------------------------------------------------------------------------------------ 020 *9923508 S325-0032/00-000.31 00 RESURFACING OUAKER RUN ROAD +3 0.47 MI W CO 32/1 - CO 9 COUNTY: MARION HARRISON ------------------------------------------------------------------------------------------------------------------------------------ 021 *9923021 S340-0019/00-000.44 00 RESURFACING SLEEPY CREEK HOLLOW CO 19/8 - 0.03 MI N CO 30 COUNTY: PUTNAM ------------------------------------------------------------------------------------------------------------------------------------ 022 9903782 U326-0002/00-010.25 00 UPGRADE TO 4 LANE ROAD CRESAP - MCKEFREY ROAD 1.8 MI N CR 74 -3.8 MI N CR74 COUNTY: MARSHALL ------------------------------------------------------------------------------------------------------------------------------------ 023 *9909912R1 S323-0010/00-032.93 00 MISCELLANEOUS CONSTRUCTION CHAPMANVILLE SIDEWALKS 0.07 MI. S. CO 10/84 TO CO 3 COUNTY: LOGAN CONTRACT: 9909912 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of total bid, whichever is greater. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained at the Charleston office. The right is reserved to reject any or all proposals. *These are projects on which any contractor with a Category "W" Prequalification Rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals on all projects will be furnished at twenty-five dollars ($25.00) per set. Extra plans will be furnished at fifteen dollars ($15.00) per set and extra proposals will be furnished at ten dollars ($10.00) per proposal. Cross sections will be furnished at fifty dollars ($50.00) per set. All will be furnished without refund and transmitted at your risk. The above noted project information will be available in the Contract Unit, Construction Section, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305 and may also be ordered by calling (304)558-2874. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national orign in consideration for an award. No proposals for these projects will be issued after 3:00 P.M. on the day prior to the letting. It is necessary to advise your approximate uncompleted workload when ordering plans and proposals. Announcement, opening and reading of bids received will be in the order as designated in the "Notice to Contractors". Sealed proposals may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9 A.M. and 10 A.M., the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division Of Highways John J. Welch, Jr., Director Project Control Division 1 1 STATE PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 9816882 Letting Date : 09/28/99 10:00 A.M. PROJECTS : S301-0046/01-001.61 00 COUNTIES : BARBOUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: GARY K CLAYTON DESCRIPTION: HALL TRUSS BRIDGE ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 3,374.000 CY 0020 207-02 SUBGRADE 1,418.000 CY 0025 207-34 FABRIC FOR SEPARATION 3,662.000 SY 0030 211-01 UNCLASSIFIED BORROW EXCAVATION 771.000 CY 0035 211-02 ROCK BORROW EXCAVATION 892.000 CY 0040 307-01 CLASS 1 AGGREGATE BASE COURSE 988.000 CY 0045 409-02 BITUMINOUS MATERIAL 1,099.000 GA 0050 502-01(14I) PORTLAND CEMENT CONCRETE APPROACH SLAB 127.000 SY 0055 601-02 CLASS B CONCRETE 3.560 CY 0060 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 84.000 LF 0065 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 41.000 LF 0070 605-09 TYPE G INLET 1.000 EA 0075 607-01(III) TYPE 1 GUARDRAIL 442.000 LF 0077 607-06 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 4.000 EA 0080 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 2,700.000 LF 0085 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN SOLID LINE 2,100.000 LF 0090 636-11 TRAFFIC CONTROL DEVICES 7,464.000 UN 0095 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 3.000 EA 1 STATE PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 9816882 Letting Date : 09/28/99 10:00 A.M. PROJECTS : S301-0046/01-001.61 00 COUNTIES : BARBOUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0100 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 50.000 EA 0105 636-14 FLAGGER 1,200.000 HR 0110 636-17 TEMPORARY CONCRETE BARRIERS 200.000 LF 0115 636-18 REMOVING AND RESETTING TEMPORARY CONCRETE BARRIERS 100.000 LF 0120 636-25(B) WARNING LIGHTS 900.000 DA 0125 637-01 WATER FOR DUST PALLIATIVE 62.000 MG 0130 638-02 RIGHT OF WAY MARKERS 24.000 EA 0135 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0140 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0145 640-03 BUILDING EQUIPMENT LUMP LUMP 0150 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0155 655-02(B) PERMANENT EROSION MATTING-TYPE B 61.000 SY 0160 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 432.000 TN AA1 0165 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 413.000 TN AA2 0170 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 95.000 TN BB1 0175 402-01(1)S HMA SKID PVT, (W-1) SLAG 91.000 TN BB2 SECTION NO. 0002 BRIDGE #3346 0185 211-02 ROCK BORROW EXCAVATION 402.000 CY 0190 212-01 STRUCTURE EXCAVATION 56.000 CY 0195 212-02 WET EXCAVATION 48.000 CY 0200 212-05 SELECT MATERIAL FOR BACKFILLING 47.000 CY 1 STATE PROJECT PAGE 3 Call Order : 001 CONTRACT ID : 9816882 Letting Date : 09/28/99 10:00 A.M. PROJECTS : S301-0046/01-001.61 00 COUNTIES : BARBOUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 BRIDGE #3346 0205 601-02 CLASS B CONCRETE 148.000 CY 0210 601-03 CLASS K CONCRETE 212.000 CY 0215 602-01 REINFORCING STEEL BARS 9,752.000 LB 0220 602-02 EPOXY COATED REINFORCING STEELBARS 43,398.000 LB 0225 603-18(45) PRESTRESSED CONCRETE I BEAMS, 45IN 768.000 LF 0230 616-05HP10X42 STEEL BEARING PILES, PRE-DRILLED AND DRIVEN 155.000 LF 0235 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP SECTION NO. 0003 COMPUTER SYSTEM 0240 640-04 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP 1 FEDERAL PROJECT PAGE 4 Call Order : 002 CONTRACT ID : 9514505 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U336-0033/04-000.00 00 0PFH 0088 020 E00 COUNTIES : PENDLETON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/14/00 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0015 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0020 204-01 MOBILIZATION LUMP LUMP 0025 207-01 UNCLASSIFIED EXCAVATION 144,161.000 M3 0030 207-02 SUBGRADE 3,314.000 M3 0035 207-34 FABRIC FOR SEPARATION 25,776.000 M2 0040 308-01 CLASS 1 AGGREGATE BASE COURSE 582.000 MGR 0045 408-02 BITUMINOUS MATERIAL 19,290.000 L 0050 409-02 BITUMINOUS MATERIAL PRIME 29,890.000 L 0055 601-02 CLASS B CONCRETE 17.200 M3 0060 604-011800A5 METALLIC COATED CORRUGATED STEEL PIPE, 1800MM, A5 57.300 M 0065 604-020300A2 FULL BITUMINOUS COATED CORRUGATED PIPE, 300MM, A2 40.400 M 0070 604-020450A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, 450MM, A2 225.300 M 0075 604-020600A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, 600MM, A2 135.400 M 0080 604-720300 SAFETY SLOPE END SECTION 11.000 EA 0085 604-981800X12 REINFORCED CONCRETE CATTLE UNDERPASS 1800 MM X 1200 MM 2.400 M 0090 605-04 TYPE B INLET 1.000 EA 0095 605-09 TYPE G INLET 5.000 EA 0100 607-013 TYPE 1 GUARDRAIL CLASS III 3,334.000 M 0105 610-031 COMBINATION CONCRETE CURBING AND GUTTER TYPE I 93.400 M 1 FEDERAL PROJECT PAGE 5 Call Order : 002 CONTRACT ID : 9514505 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U336-0033/04-000.00 00 0PFH 0088 020 E00 COUNTIES : PENDLETON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/14/00 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 636-11 TRAFFIC CONTROL DEVICE 6,926.000 UN 0115 636-14 FLAGGER 100.000 HR 0120 636-25B WARNING LIGHTS TYPE B 1,600.000 DA 0125 637-01 WATER FOR DUST PALLIATIVE 4,948.000 M3 0130 638-02 RIGHT OF WAY MARKERS 122.000 EA 0135 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0140 640-02 SMALL FIELD OFFICE/STORAGE BUILDING LUMP LUMP 0145 640-03 BUILDING EQUIPMENT LUMP LUMP 0150 642-01 TEMPORARY BERMS 3,961.000 M 0155 642-031 DITCH CHECKS 81.000 EA 0160 642-041 TEMPORARY SEED 587.180 KG 0165 642-051 STRAW OR HAY MULCH 39.290 MGR 0170 642-052 WOOD CELLULOSE FIBER MULCH 6.736 MGR 0175 642-06 FERTILIZER 17.006 MGR 0180 642-11 HAY OR STRAW BALES 3,345.000 EA 0185 642-12 SILT FENCE 5,935.000 M 0190 652-01 AGRICULTURAL LIMESTONE 19.558 MGR 0195 652-021 FERTILIZER 10-20-10 17.115 MGR 0200 652-022 UREA FORMALDEHYDE FERTILIZER 2.968 MGR 0205 652-035 SEED MIXTURE L 616.429 KG 0210 652-041 STRAW OR HAY MULCH 39.290 MGR 1 FEDERAL PROJECT PAGE 6 Call Order : 002 CONTRACT ID : 9514505 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U336-0033/04-000.00 00 0PFH 0088 020 E00 COUNTIES : PENDLETON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/14/00 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0215 652-042 WOOD CELLULOSE FIBER MULCH 5.763 MGR 0220 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 5,026.000 MGR AA1 0225 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 4,523.000 MGR AA2 0230 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,463.000 MGR BB1 0235 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,317.000 MGR BB2 SECTION NO. 0002 PILING WALL 0240 308-07SG CLASS 7 AGGREGATE STONE OR GRAVEL 280.000 MGR 0245 614-1H310079 STEEL PILES, HP 310X79 728.000 M 0250 614-3 CONCRETE LAGGING 496.000 M2 0255 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 7 Call Order : 003 CONTRACT ID : 9912714 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U304-0004/00-026.08 00 COUNTIES : BRAXTON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/30/99 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WIDENING AND TRAFFIC SIGNAL 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 60.000 CY 0020 207-02 SUBGRADE 40.000 CY 0025 211-01 UNCLASSIFIED BORROW EXCAVATION 70.000 CY 0030 218-01 RIPRAP 12.000 CY 0035 229-01 SHOULDERS AND DITCHES 0.038 LM 0040 408-02 BITUMINOUS MATERIAL 12.000 GA 0045 409-02 BITUMINOUS MATERIAL 86.000 GA 0050 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 84.000 LF 0055 605-09 TYPE G INLET 1.000 EA 0060 605-24 ADJUSTING TYPE G INLET 1.000 EA 0065 607-01(I) TYPE 1 GUARDRAIL 116.000 LF 0070 633-03 DUMPED ROCK GUTTER 88.000 CY 0075 636-11 TRAFFIC CONTROL DEVICES 6,500.000 UN 0080 636-14 FLAGGER 200.000 HR 0085 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0090 660-01 SIGNAL CONTROLLERS LUMP LUMP 0095 660-02(LPS-C) TRAFFIC DETECTORS 6.000 EA 0100 660-03(V-12) SIGNAL SECTIONS 20.000 EA 0105 660-04(C1)A SIGNAL SUPPORTS, INSTALLATION ONLY 3.000 EA 1 STATE PROJECT PAGE 8 Call Order : 003 CONTRACT ID : 9912714 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U304-0004/00-026.08 00 COUNTIES : BRAXTON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/30/99 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WIDENING AND TRAFFIC SIGNAL 0110 660-05(H) JUNCTION BOXES, TYPE H 4.000 EA 0115 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0120 662-07(250)W LUMINAIRES 2.000 EA 0125 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0130 663-01-1(II)W EDGE LINE, WHITE 850.000 LF 0135 663-03-1(II) BARRIER LINES 450.000 LF 0140 663-05(V) TYPE V, STOP LINES 80.000 LF 0145 663-10(V) TYPE V, LANE ARROWS 6.000 EA 0150 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 86.000 TN AA1 0155 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 78.000 TN AA2 0160 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 40.000 TN BB1 0165 308-01S CLASS 1 AGGREGATE, SLAG 37.000 TN BB2 0170 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 60.000 TN CC1 0175 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 55.000 TN CC2 0180 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 116.000 TN DD1 0185 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 106.000 TN DD2 1 FEDERAL PROJECT PAGE 9 Call Order : 004 CONTRACT ID : 9834404 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U342-0219/00-030.09 02 STPG 0Q39 001 E00 COUNTIES : RANDOLPH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/99 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 REPLACE EXISTING RAILROAD CROSSINGS WITH HIGH TYPE CROSSING 0005 RR-01 RAILROAD WORK LUMP LUMP 0010 RR-02 RAILROAD WORK LUMP LUMP 0015 204-01 MOBILIZATION LUMP LUMP 0020 408-02 BITUMINOUS MATERIAL 40.000 GA 0025 408-02 BITUMINOUS MATERIAL 30.000 GA 0030 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 620.000 SY 0035 636-11 TRAFFIC CONTROL DEVICES 6,245.000 UN 0040 636-14 FLAGGER 150.000 HR 0045 636-14 FLAGGER 100.000 HR 0050 663-01-1(II)W EDGE LINE, WHITE 600.000 LF 0055 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 300.000 LF 0060 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 160.000 LF 0065 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 170.000 TN AA1 0070 308-08S CLASS 8 AGGREGATE, SLAG 155.000 TN AA2 0075 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 35.000 TN BB1 0080 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 32.000 TN BB2 0085 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 40.000 TN DD1 0090 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 42.000 TN DD1 0095 308-08S CLASS 8 AGGREGATE, SLAG 36.000 TN DD2 0100 402-01(1)S HMA SKID PVT, (W-1) SLAG 38.000 TN DD2 0105 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 52.000 TN EE1 1 FEDERAL PROJECT PAGE 10 Call Order : 004 CONTRACT ID : 9834404 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U342-0219/00-030.09 02 STPG 0Q39 001 E00 COUNTIES : RANDOLPH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/99 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 REPLACE EXISTING RAILROAD CROSSINGS WITH HIGH TYPE CROSSING 0110 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 47.000 TN EE2 0115 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 16.000 TN FF1 0120 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 15.000 TN FF2 1 FEDERAL PROJECT PAGE 11 Call Order : 005 CONTRACT ID : 9816601 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U311-0030/00-000.00 00 COUNTIES : GILMER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/15/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 203-01 DISMANTLING STRUCTURES LUMP LUMP 0015 204-01 MOBILIZATION LUMP LUMP 0020 207-01 UNCLASSIFIED EXCAVATION 240,828.000 CY 0025 207-02 SUBGRADE 3,142.000 CY 0030 207-34 FABRIC FOR SEPARATION 18,945.000 SY 0035 211-02 ROCK BORROW EXCAVATION 6,484.000 CY 0040 212-01 STRUCTURE EXCAVATION 1,250.000 CY 0045 212-05 SELECT MATERIAL FOR BACKFILLING 544.000 CY 0050 218-01 RIPRAP 432.000 CY 0055 307-01 CLASS 1 AGGREGATE BASE COURSE 1,972.000 CY 0060 311-06 OPEN GRADED FREE DRAINING BASE COURSE 693.000 CY 0065 601-02 CLASS B CONCRETE 236.000 CY 0070 604-70(12X10) PRECAST CONCRETE BOX CULVERT 120.000 LF 0075 604-70(10X10) PRECAST CONCRETE BOX CULVERT 88.000 LF 0080 605-09 TYPE G INLET 11.000 EA 0085 606-29 FREE DRAINING BASE (FDB) TRENCH 2,239.000 LF 0090 606-30 OUTLET PIPE 145.000 LF 0095 607-01(I) TYPE 1 GUARDRAIL 4,267.500 LF 0100 607-01(III) TYPE 1 GUARDRAIL 825.000 LF 0105 607-65 FLARED END TERMINAL 7.000 EA 1 FEDERAL PROJECT PAGE 12 Call Order : 005 CONTRACT ID : 9816601 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U311-0030/00-000.00 00 COUNTIES : GILMER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/15/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0110 633-01 CONCRETE GUTTER 263.000 SY 0115 633-03 DUMPED ROCK GUTTER 796.000 CY 0120 636-06 PILOT TRUCK AND DRIVER 60.000 DA 0125 636-07 ERADICATION OF PAVEMENT MARKINGS 2,400.000 LF 0130 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 4,800.000 LF 0135 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN SOLID LINE 4,800.000 LF 0140 636-11 TRAFFIC CONTROL DEVICES 16,640.000 UN 0145 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 8.000 EA 0150 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 400.000 EA 0155 636-14 FLAGGER 480.000 HR 0160 636-25(B) WARNING LIGHTS 240.000 DA 0165 637-01 WATER FOR DUST PALLIATIVE 446.000 MG 0170 638-02 RIGHT OF WAY MARKERS 58.000 EA 0175 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0180 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0185 640-03 BUILDING EQUIPMENT LUMP LUMP 0190 642-01 TEMPORARY BERMS 6,825.000 LF 0195 642-02 SLOPE DRAINS 132.000 LF 0200 642-03-1 DITCH CHECKS 21.000 EA 0205 642-03-2 CHECK DAMS 8.000 EA 0210 642-04-1 TEMPORARY SEED 739.000 LB 1 FEDERAL PROJECT PAGE 13 Call Order : 005 CONTRACT ID : 9816601 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U311-0030/00-000.00 00 COUNTIES : GILMER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/15/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0215 642-04-2 SEED MIXTURE B 136.000 LB 0220 642-04-3 SEED MIXTURE D 720.000 LB 0225 642-05-1 STRAW OR HAY MULCH 24.600 TN 0230 642-05-2 WOOD CELLULOSE FIBER MULCH 9.200 TN 0235 642-06 FERTILIZER 5.300 TN 0240 642-07 FIBER MATTING 1,588.000 SY 0245 642-09 CONTOUR DITCH 14,300.000 LF 0250 642-10 AGRICULTURAL LIMESTONE 185.000 TN 0255 642-11 HAY OR STRAW BALES 2,383.000 EA 0260 642-12 SILT FENCE 7,150.000 LF 0265 652-01 AGRICULTURAL LIMESTONE 18.500 TN 0270 652-02-1 FERTILIZER, 10-20-10 5.300 TN 0275 652-02-2 UREA FORMALDEHYDE FERTILIZER 1.900 TN 0280 652-03-1 SEED MIXTURES B, C-1 OR C-2 136.000 LB 0285 652-03-2 SEED MIXTURES D 720.000 LB 0290 652-04-1 STRAW OR HAY MULCH 24.600 TN 0295 652-04-2 WOOD CELLULOSE FIBER MULCH 9.200 TN 0300 655-01 MATTING 801.000 SY 0305 657-08 (2.00LB) CHANNEL POSTS 768.000 LF 0310 657-10 (3.00LB) CHANNEL POSTS 191.000 LF 0315 661-01(1) (0.080),FLAT SHEET SIGNS 69.450 SF 1 FEDERAL PROJECT PAGE 14 Call Order : 005 CONTRACT ID : 9816601 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U311-0030/00-000.00 00 COUNTIES : GILMER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/15/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0320 661-04(1) DELINEATORS, REFLEX REFLECTOR ,WHITE SINGLE 128.000 EA 0325 663-01-1(II)W EDGE LINE, WHITE 4,800.000 LF 0330 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 120.000 LF 0335 663-04(II) TYPE II CHANNELIZING LINES 820.000 LF 0340 663-03-1(II) BARRIER LINES 936.000 LF 0345 663-10(V) TYPE V, LANE ARROWS 6.000 EA 0350 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 5,501.000 TN AA1 0355 308-01S CLASS 1 AGGREGATE, SLAG 5,147.000 TN AA2 0360 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 6,335.000 TN BB1 0365 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 5,867.000 TN BB2 0370 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 1,555.000 TN CC1 0375 402-01(1)S HMA SKID PVT, (W-1) SLAG 1,416.000 TN CC2 0380 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 80.000 LF DD1 0385 604-72(15) SAFETY SLOPE END SECTION FOR CSP 2.000 EA DD1 0390 604-37(15)III REINFORCED CONCRETE PIPE 80.000 LF DD2 0395 604-71(15) SAFETY SLOPE END SECTION FOR RCP 2.000 EA DD2 0400 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 304.000 LF EE1 0405 604-09(18) END SECION FOR CORRUGATED STEEL PIPE 2.000 EA EE1 0410 604-71(18) SAFETY SLOPE END SECTION FOR RCP 1.000 EA EE1 0415 604-37(18)III REINFORCED CONCRETE PIPE 304.000 LF EE2 0420 604-38(18) REINFORCED CONCRETE END SECTION FOR ROUND CONCRETE PIPE 2.000 EA EE2 1 FEDERAL PROJECT PAGE 15 Call Order : 005 CONTRACT ID : 9816601 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U311-0030/00-000.00 00 COUNTIES : GILMER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/15/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0425 604-72(18) SAFETY SLOPE END SECTION FOR CSP 1.000 EA EE2 0430 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 728.000 LF FF1 0435 604-09(24) END SECION FOR CORRUGATED STEEL PIPE 5.000 EA FF1 0440 604-37(24)III REINFORCED CONCRETE PIPE 728.000 LF FF2 0445 604-38(24) REINFORCED CONCRETE END SECTION FOR ROUND CONCRETE PIPE 5.000 EA FF2 0450 604-01(36)A2 METALLIC COATED CORRUGATED STEEL PIPE 60.000 LF GG1 0455 604-09(36) END SECION FOR CORRUGATED STEEL PIPE 2.000 EA GG1 0460 604-37(36)III REINFORCED CONCRETE PIPE 60.000 LF GG2 0465 604-38(36) REINFORCED CONCRETE END SECTION FOR ROUND CONCRETE PIPE 2.000 EA GG2 0470 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 22.000 TN HH1 0475 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 20.000 TN HH2 1 STATE PROJECT PAGE 16 Call Order : 006 CONTRACT ID : 9922102 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U334-0020/21-002.00 00 COUNTIES : NICHOLAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 1,285.000 GA 0010 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 130.000 SY 0015 636-06 PILOT TRUCK AND DRIVER 21.000 DA 0020 636-11 TRAFFIC CONTROL DEVICES 8,878.000 UN 0025 636-14 FLAGGER 420.000 HR 0030 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 3,350.000 TN AA1 0035 308-08S CLASS 8 AGGREGATE, SLAG 3,048.000 TN AA2 0040 407-02(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 2,400.000 TN BB1 0045 407-02(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 2,184.000 TN BB2 0050 407-3SG HOT-MIX ASPHAPLT PATCH AND LEVEL COURSE, STONE OR GRAVEL 1,230.000 TN CC1 0055 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 1,120.000 TN CC2 0060 407-1(II)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 4,730.000 TN DD1 0065 407-1(II)S HOT-MIX ASPHALT BASE COURSE, SLAG 4,305.000 TN DD2 1 STATE PROJECT PAGE 17 Call Order : 007 CONTRACT ID : 9732504R1 Letting Date : 09/28/99 10:00 A.M. PROJECTS : S303-0003/25-000.01 00 COUNTIES : BOONE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/29/00 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0001 202-01(1) BUILDING DEMOLITION ( 1.00 ) LUMP 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0015 203-01 DISMANTLING STRUCTURES LUMP LUMP 0020 204-01 MOBILIZATION LUMP LUMP 0025 207-34 FABRIC FOR SEPARATION 405.000 SY 0030 211-01 UNCLASSIFIED BORROW EXCAVATION 568.000 CY 0035 211-02 ROCK BORROW EXCAVATION 640.000 CY 0040 212-01 STRUCTURE EXCAVATION 188.000 CY 0045 212-02 WET EXCAVATION 240.000 CY 0050 212-05 SELECT MATERIAL FOR BACKFILLING 52.000 CY 0055 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 210.000 TN CC1 0060 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 233.000 TN CC2 0065 408-02 BITUMINOUS MATERIAL 69.000 GA 0070 409-02 BITUMINOUS MATERIAL 182.000 GA 0075 502-01(12I) PORTLAND CEMENT CONCRETE APPROACH SLAB 138.000 SY 0080 601-02 CLASS B CONCRETE 291.000 CY 0085 601-03 CLASS K CONCRETE 325.000 CY 0090 602-01 REINFORCING STEEL BARS 56,856.000 LB 0095 602-02 EPOXY COATED REINFORCING STEELBARS 80,893.000 LB 0100 603-01(72) PRESTRESSED CONC BEAMS 72 IN DEEP 1,043.000 LF 0105 607-01(I) TYPE 1 GUARDRAIL 116.000 LF 1 STATE PROJECT PAGE 18 Call Order : 007 CONTRACT ID : 9732504R1 Letting Date : 09/28/99 10:00 A.M. PROJECTS : S303-0003/25-000.01 00 COUNTIES : BOONE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/29/00 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0110 607-65 FLARED END TERMINAL 4.000 EA 0115 616-05HP14X73 STEEL BEARING PILES, PRE-DRILLED AND DRIVEN 779.000 LF 0120 625-01(36) DRILLED CASSIONS 36 IN DIAMETER 78.000 LF 0125 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 1,000.000 LF 0130 636-11 TRAFFIC CONTROL DEVICES 9,361.000 UN 0135 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 12.000 EA 0140 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 100.000 EA 0145 636-14 FLAGGER 500.000 HR 0150 636-17 TEMPORARY CONCRETE BARRIERS 80.000 LF 0155 636-23(01) TEMPORARY TRAFFIC SIGNAL ( 1.00 ) LUMP 0160 636-25(B) WARNING LIGHTS 400.000 DA 0165 636-25(C) WARNING LIGHTS 8,000.000 DA 0170 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0175 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0180 640-03 BUILDING EQUIPMENT LUMP LUMP 0185 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0190 657-08 (2.00LB) CHANNEL POSTS 108.000 LF 0195 657-10 (3.00LB) CHANNEL POSTS 32.000 LF 0200 657-18 POST REMOVAL 9.000 EA 0205 661-01(1) (0.080),FLAT SHEET SIGNS 58.000 SF 0210 663-01-1(II)W EDGE LINE, WHITE 2,142.000 LF 1 STATE PROJECT PAGE 19 Call Order : 007 CONTRACT ID : 9732504R1 Letting Date : 09/28/99 10:00 A.M. PROJECTS : S303-0003/25-000.01 00 COUNTIES : BOONE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/29/00 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0215 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 800.000 LF 0220 663-05(II) TYPE II, STOP LINES 29.000 LF 0225 663-15(V) RAILROAD CROSSING MARKING 1.000 EA 0230 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 214.000 TN AA1 0235 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 192.000 TN AA2 0240 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 46.000 TN AB1 0245 402-01(1)S HMA SKID PVT, (W-1) SLAG 41.000 TN AB2 1 STATE PROJECT PAGE 20 Call Order : 008 CONTRACT ID : 9729307 Letting Date : 09/28/99 10:00 A.M. PROJECTS : S310-0025/00-000.71 00 COUNTIES : FAYETTE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/29/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 1,346.000 CY 0020 207-02 SUBGRADE 101.000 CY 0025 207-34 FABRIC FOR SEPARATION 862.000 SY 0030 307-01 CLASS 1 AGGREGATE BASE COURSE 131.000 CY 0033 308-01 CLASS 1 AGGREGATE BASE COURSE 15.000 TN 0035 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 26.000 TN AA1 0040 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 23.400 TN AA2 0045 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 119.000 TN BB1 0050 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 107.000 TN BB2 0055 408-02 BITUMINOUS MATERIAL 194.000 GA 0060 409-02 BITUMINOUS MATERIAL 415.000 GA 0065 604-01(12)A2 METALLIC COATED CORRUGATED STEEL PIPE 36.000 LF 0070 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 53.000 LF 0075 604-09(12) END SECION FOR CORRUGATED STEEL PIPE 1.000 EA 0080 605-04 TYPE B INLET 1.000 EA 0085 607-01(II) TYPE 1 GUARDRAIL 240.000 LF 0090 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN SOLID LINE 400.000 LF 0095 636-11 TRAFFIC CONTROL DEVICES 3,960.000 UN 0100 636-14 FLAGGER 50.000 HR 1 STATE PROJECT PAGE 21 Call Order : 008 CONTRACT ID : 9729307 Letting Date : 09/28/99 10:00 A.M. PROJECTS : S310-0025/00-000.71 00 COUNTIES : FAYETTE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/29/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0105 636-25(B) WARNING LIGHTS 360.000 DA 0110 638-02 RIGHT OF WAY MARKERS 10.000 EA 0115 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0120 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP SECTION NO. 0002 BRIDGE 0125 203-01 DISMANTLING STRUCTURES LUMP LUMP 0130 211-02 ROCK BORROW EXCAVATION 104.000 CY 0135 212-01 STRUCTURE EXCAVATION 115.000 CY 0140 212-02 WET EXCAVATION 151.000 CY 0145 212-05 SELECT MATERIAL FOR BACKFILLING 35.000 CY 0150 601-02 CLASS B CONCRETE 156.000 CY 0155 601-03 CLASS K CONCRETE 71.000 CY 0160 602-01 REINFORCING STEEL BARS 8,735.000 LB 0165 602-02 EPOXY COATED REINFORCING STEELBARS 14,150.000 LB 0170 603-01 PRESTRESSED CONCRETE BEAMS 226.000 LF 0175 636-05 TEMPORARY STRUCTURES FOR MAINTAINING TRAFFIC ( 1.00 ) LUMP 0180 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 22 Call Order : 009 CONTRACT ID : 9720609 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U310-0002/00-001.50 00 COUNTIES : FAYETTE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 6,197.000 CY 0020 207-02 SUBGRADE 120.000 CY 0025 211-08 ROCK BORROW EXCAVATION 1,897.000 TN 0030 217-01 SPECIAL ROCK FILL 1,666.000 CY 0035 218-03 GABIONS 78.000 CY 0040 229-01 SHOULDERS AND DITCHES 5.440 LM 0045 408-02 BITUMINOUS MATERIAL 2,068.000 GA 0050 409-02 BITUMINOUS MATERIAL 865.000 GA 0055 415-05 REMOVE EXISTING PAVEMENT SURFACE 358.000 SY 0060 601-02 CLASS B CONCRETE 30.000 CY 0065 604-01(12)A2 METALLIC COATED CORRUGATED STEEL PIPE 14.000 LF 0070 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 37.000 LF 0075 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 857.000 LF 0080 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 174.000 LF 0085 604-01(48)A2 METALLIC COATED CORRUGATED STEEL PIPE 131.000 LF 0090 604-02(24)A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 40.000 LF 0095 604-09(48) END SECION FOR CORRUGATED STEEL PIPE 4.000 EA 0100 604-10(17X13) METALLIC COATED CORRUGATED STEEL PIPE ARCH 60.000 LF 0105 604-10(21X15) METALLIC COATED CORRUGATED STEEL PIPE ARCH 90.000 LF 1 STATE PROJECT PAGE 23 Call Order : 009 CONTRACT ID : 9720609 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U310-0002/00-001.50 00 COUNTIES : FAYETTE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 604-53(12) RELAID CONDUIT 80.000 LF 0115 605-09 TYPE G INLET 21.000 EA 0120 605-50 ADJUSTING CONCRETE HEADWALL 2.000 EA 0125 607-01(I) TYPE 1 GUARDRAIL 5,075.000 LF 0130 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 1,187.500 LF 0135 607-10-1(A) GUARDRAIL REMOVAL 1,087.500 LF 0140 607-25(A) CUT SLOPE TERMINAL, TYPE A 1.000 EA 0145 607-65 FLARED END TERMINAL 9.000 EA 0150 636-06 PILOT TRUCK AND DRIVER 45.000 DA 0155 636-11 TRAFFIC CONTROL DEVICES 13,076.000 UN 0160 636-14 FLAGGER 1,200.000 HR 0165 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0170 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0175 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 4,501.000 TN AA1 0180 308-01S CLASS 1 AGGREGATE, SLAG 4,096.000 TN AA2 0185 308-07SG CLASS 7 AGGREGATE, STONE OR GRAVEL 70.000 TN BB1 0190 308-07S CLASS 7 AGGREGATE, SLAG 64.000 TN BB2 0195 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,361.000 TN CC1 0200 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,239.000 TN CC2 0205 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 269.000 TN DD1 0210 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 245.000 TN DD2 1 STATE PROJECT PAGE 24 Call Order : 009 CONTRACT ID : 9720609 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U310-0002/00-001.50 00 COUNTIES : FAYETTE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0215 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 4,046.000 TN EE1 0220 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 3,682.000 TN EE2 0225 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 700.000 TN FF1 0230 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 637.000 TN FF2 0235 401-7SG SCRATCH COURSE, STONE OR GRAVEL 1,900.000 TN GG1 0240 401-7S SCRATCH COURSE, SLAG 1,729.000 TN GG2 1 STATE PROJECT PAGE 25 Call Order : 010 CONTRACT ID : 9720610 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U310-0038/00-003.63 00 COUNTIES : FAYETTE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204-01 MOBILIZATION LUMP LUMP 0010 207-01 UNCLASSIFIED EXCAVATION 220.000 CY 0015 229-01 SHOULDERS AND DITCHES 0.560 LM 0020 408-02 BITUMINOUS MATERIAL 200.000 GA 0025 409-02 BITUMINOUS MATERIAL 142.000 GA 0030 601-02 CLASS B CONCRETE 11.500 CY 0035 602-01 REINFORCING STEEL BARS 425.000 LB 0040 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 65.000 LF 0045 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 538.000 LF 0050 604-10(17X13) METALLIC COATED CORRUGATED STEEL PIPE ARCH 60.000 LF 0055 605-04 TYPE B INLET 1.000 EA 0060 605-09 TYPE G INLET 8.000 EA 0065 605-15 ADJUST EXISTING MANHOLE 1.000 EA 0070 605-41(18)(6) SLOT INLET 65.000 LF 0075 607-10-1(A) GUARDRAIL REMOVAL 87.500 LF 0080 622-03 CANTILEVER MAILBOX SUPPORT 10.000 EA 0085 636-11 TRAFFIC CONTROL DEVICES 5,451.000 UN 0090 636-14 FLAGGER 1,200.000 HR 0095 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 340.000 TN AA1 0100 308-01S CLASS 1 AGGREGATE, SLAG 308.000 TN AA2 0105 308-07SG CLASS 7 AGGREGATE, STONE OR GRAVEL 50.000 TN BB1 1 STATE PROJECT PAGE 26 Call Order : 010 CONTRACT ID : 9720610 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U310-0038/00-003.63 00 COUNTIES : FAYETTE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 308-07S CLASS 7 AGGREGATE, SLAG 46.000 TN BB2 0115 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 345.000 TN CC1 0120 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 314.000 TN CC2 0125 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 100.000 TN DD1 0130 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 91.000 TN DD2 0135 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 465.000 TN EE1 0140 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 423.000 TN EE2 0145 401-7SG SCRATCH COURSE, STONE OR GRAVEL 213.000 TN FF1 0150 401-7S SCRATCH COURSE, SLAG 194.000 TN FF2 1 STATE PROJECT PAGE 27 Call Order : 011 CONTRACT ID : 9720611 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U310-0060/05-000.00 00 COUNTIES : FAYETTE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204-01 MOBILIZATION LUMP LUMP 0010 207-01 UNCLASSIFIED EXCAVATION 3,650.000 CY 0015 229-01 SHOULDERS AND DITCHES 3.050 LM 0020 408-02 BITUMINOUS MATERIAL 986.000 GA 0025 409-02 BITUMINOUS MATERIAL 22.000 GA 0030 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 70.000 LF 0035 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 444.000 LF 0040 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 5.000 LF 0045 604-01(30)A2 METALLIC COATED CORRUGATED STEEL PIPE 13.000 LF 0050 604-01(36)A2 METALLIC COATED CORRUGATED STEEL PIPE 19.000 LF 0055 605-09 TYPE G INLET 5.000 EA 0060 607-01(I) TYPE 1 GUARDRAIL 287.500 LF 0065 607-25(A) CUT SLOPE TERMINAL, TYPE A 1.000 EA 0070 607-65 FLARED END TERMINAL 1.000 EA 0075 622-03 CANTILEVER MAILBOX SUPPORT 2.000 EA 0080 636-11 TRAFFIC CONTROL DEVICES 5,141.000 UN 0085 636-14 FLAGGER 400.000 HR 0090 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 2,000.000 TN AA1 0095 308-01S CLASS 1 AGGREGATE, SLAG 1,821.000 TN AA2 0100 308-07SG CLASS 7 AGGREGATE, STONE OR GRAVEL 200.000 TN BB1 0105 308-07S CLASS 7 AGGREGATE, SLAG 182.000 TN BB2 1 STATE PROJECT PAGE 28 Call Order : 011 CONTRACT ID : 9720611 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U310-0060/05-000.00 00 COUNTIES : FAYETTE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 4,150.000 TN CC1 0115 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 3,776.000 TN CC2 0120 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,915.000 TN DD1 0125 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,743.000 TN DD2 0130 401-7SG SCRATCH COURSE, STONE OR GRAVEL 915.000 TN EE1 0135 401-7S SCRATCH COURSE, SLAG 833.000 TN EE2 1 STATE PROJECT PAGE 29 Call Order : 012 CONTRACT ID : 9905501 Letting Date : 09/28/99 10:00 A.M. PROJECTS : S329-0015/00-000.97 00 COUNTIES : MINERAL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204-01 MOBILIZATION LUMP LUMP 0010 211-08 ROCK BORROW EXCAVATION 174.000 TN 0015 409-02 BITUMINOUS MATERIAL 156.000 GA 0020 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 126.000 SY 0025 636-11 TRAFFIC CONTROL DEVICES 3,381.000 UN 0030 636-25(B) WARNING LIGHTS 126.000 DA 0035 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0040 308-09SG CLASS 9 AGGREGATE STONE OR GRAVEL 75.000 TN AA1 0045 308-09S CLASS 9 AGGREGATE SLAG 71.000 TN AA2 0050 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 29.000 TN BB1 0055 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 28.000 TN BB2 0060 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 23.000 TN CC1 0065 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 22.000 TN CC2 0070 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 20.000 TN DD1 0075 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 19.000 TN DD2 1 STATE PROJECT PAGE 30 Call Order : 013 CONTRACT ID : 9836201AR1 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U330-0049/00-018.08 00 COUNTIES : MINGO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/28/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 13,710.000 CY 0020 207-02 SUBGRADE 1,162.000 CY 0025 211-01 UNCLASSIFIED BORROW EXCAVATION 105,692.000 CY 0030 211-02 ROCK BORROW EXCAVATION 28,120.000 CY 0035 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 1,879.000 TN 0040 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 1,673.000 TN 0045 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 2,192.000 TN 0050 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 2,412.000 TN 0055 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 182.000 TN 0060 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 201.000 TN 0065 409-02 BITUMINOUS MATERIAL 3,512.000 GA 0070 601-02 CLASS B CONCRETE 64.000 CY 0075 604-01(120)E5 METALLIC COATED CORRUGATED STEEL PIPE 295.000 LF 0080 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 113.000 LF 0085 604-09(18) END SECION FOR CORRUGATED STEEL PIPE 1.000 EA 0090 604-72(18) SAFETY SLOPE END SECTION FOR CSP 3.000 EA 0095 607-01(I) TYPE 1 GUARDRAIL 1,775.000 LF 0100 633-03 DUMPED ROCK GUTTER 56.000 CY 0105 636-07 ERADICATION OF PAVEMENT MARKINGS 1,600.000 LF 1 STATE PROJECT PAGE 31 Call Order : 013 CONTRACT ID : 9836201AR1 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U330-0049/00-018.08 00 COUNTIES : MINGO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/28/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 800.000 LF 0115 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN SOLID LINE 3,600.000 LF 0120 636-10(R-4) TEMPORARY RAISED PAVEMENT MARKERS, TYPE R-4 200.000 EA 0125 636-11 TRAFFIC CONTROL DEVICES 6,072.000 UN 0130 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 2.000 EA 0135 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 20.000 EA 0140 636-14 FLAGGER 500.000 HR 0145 636-25(B) WARNING LIGHTS 960.000 DA 0150 637-01 WATER FOR DUST PALLIATIVE 274.000 MG 0155 638-02 RIGHT OF WAY MARKERS 18.000 EA 0160 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0165 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0170 640-03 BUILDING EQUIPMENT LUMP LUMP 0175 642-03-1 DITCH CHECKS 8.000 EA 0180 642-04-1 TEMPORARY SEED 273.000 LB 0185 642-05-1 STRAW OR HAY MULCH 2.000 TN 0190 642-06 FERTILIZER 1.000 TN 0195 642-12 SILT FENCE 1,800.000 LF 0200 652-01 AGRICULTURAL LIMESTONE 2.000 TN 0205 652-02-1 FERTILIZER, 10-20-10 2.000 TN 0210 652-02-2 UREA FORMALDEHYDE FERTILIZER 0.500 TN 1 STATE PROJECT PAGE 32 Call Order : 013 CONTRACT ID : 9836201AR1 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U330-0049/00-018.08 00 COUNTIES : MINGO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/28/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0215 652-03-05 SEED MIXTURE L 300.000 LB 0220 652-04-1 STRAW OR HAY MULCH 5.000 TN 1 STATE PROJECT PAGE 33 Call Order : 014 CONTRACT ID : 9720626 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U345-0012/02-000.00 00 COUNTIES : SUMMERS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 2,502.000 CY 0020 211-08 ROCK BORROW EXCAVATION 2,490.000 TN 0025 218-03 GABIONS 475.000 CY 0030 229-01 SHOULDERS AND DITCHES 4.680 LM 0035 408-02 BITUMINOUS MATERIAL 1,340.000 GA 0040 409-02 BITUMINOUS MATERIAL 8,373.000 GA 0045 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 423.000 LF 0050 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 690.000 LF 0055 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 141.000 LF 0060 604-01(30)A2 METALLIC COATED CORRUGATED STEEL PIPE 36.000 LF 0065 604-01(36)A2 METALLIC COATED CORRUGATED STEEL PIPE 40.000 LF 0070 604-10(17X13) METALLIC COATED CORRUGATED STEEL PIPE ARCH 59.000 LF 0075 604-70(10X10) PRECAST CONCRETE BOX CULVERT 32.000 LF 0080 605-09 TYPE G INLET 13.000 EA 0085 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 75.000 LF 0090 607-12 TYPE I GUARDRAIL W/O BLOCKS AND 8 FT. POSTS 19,037.500 LF 0095 607-25(A) CUT SLOPE TERMINAL, TYPE A 1.000 EA 0100 607-35 GUARDRAIL ELEMENT 6.000 EA 0105 607-48 STRUCTURE MOUNTED POST, ANCHORED 4.000 EA 1 STATE PROJECT PAGE 34 Call Order : 014 CONTRACT ID : 9720626 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U345-0012/02-000.00 00 COUNTIES : SUMMERS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 636-11 TRAFFIC CONTROL DEVICES 18,190.000 UN 0115 636-14 FLAGGER 1,200.000 HR 0120 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0125 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0130 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 123.000 TN AA1 0135 308-01S CLASS 1 AGGREGATE, SLAG 112.000 TN AA2 0140 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 4,217.000 TN BB1 0145 308-08S CLASS 8 AGGREGATE, SLAG 3,838.000 TN BB2 0150 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 4,053.000 TN CC1 0155 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 3,689.000 TN CC2 0160 407-1(II)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 3,841.000 TN DD1 0165 407-1(II)S HOT-MIX ASPHALT BASE COURSE, SLAG 3,495.000 TN DD2 0170 407-02(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 2,611.000 TN EE1 0175 407-02(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 2,377.000 TN EE2 1 STATE PROJECT PAGE 35 Call Order : 015 CONTRACT ID : 9923702 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U349-0016/00-005.39 00 COUNTIES : UPSHUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 MINOR WIDENING 0005 207-01 UNCLASSIFIED EXCAVATION 300.000 CY 0010 408-02 BITUMINOUS MATERIAL 898.000 GA 0015 409-02 BITUMINOUS MATERIAL 1,633.000 GA 0020 636-06 PILOT TRUCK AND DRIVER 3.000 DA 0025 636-11 TRAFFIC CONTROL DEVICES 4,725.000 UN 0030 636-14 FLAGGER 160.000 HR 0035 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 350.000 TN AA1 0040 308-08S CLASS 8 AGGREGATE, SLAG 319.000 TN AA2 0045 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 600.000 TN BB1 0050 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 546.000 TN BB2 0055 407-02(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,644.000 TN CC1 0060 407-02(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,496.000 TN CC2 0065 407-3SG HOT-MIX ASPHAPLT PATCH AND LEVEL COURSE, STONE OR GRAVEL 2,466.000 TN DD1 0070 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 2,244.000 TN DD2 1 STATE PROJECT PAGE 36 Call Order : 016 CONTRACT ID : 9923701 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U349-0016/03-000.00 00 COUNTIES : UPSHUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 MINOR WIDENING 0005 207-01 UNCLASSIFIED EXCAVATION 334.000 CY 0010 408-02 BITUMINOUS MATERIAL 885.000 GA 0015 409-02 BITUMINOUS MATERIAL 1,820.000 GA 0020 636-06 PILOT TRUCK AND DRIVER 3.000 DA 0025 636-11 TRAFFIC CONTROL DEVICES 3,900.000 UN 0030 636-14 FLAGGER 160.000 HR 0035 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 300.000 TN AA1 0040 308-08S CLASS 8 AGGREGATE, SLAG 273.000 TN AA2 0045 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 667.000 TN BB1 0050 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 607.000 TN BB2 0055 407-02(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,622.000 TN CC1 0060 407-02(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,476.000 TN CC2 0065 407-3SG HOT-MIX ASPHAPLT PATCH AND LEVEL COURSE, STONE OR GRAVEL 2,433.000 TN DD1 0070 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 2,214.000 TN DD2 1 STATE PROJECT PAGE 37 Call Order : 017 CONTRACT ID : 9916281AR1 Letting Date : 09/28/99 10:00 A.M. PROJECTS : G020-0MCS/0T-001.00 00 2 G020-0MCS/0T-001.00 00 3 G020-0MCS/0T-001.00 00 4 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/02 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 LAB BUILDING - PHASE 1 0005 207-01 UNCLASSIFIED EXCAVATION 1,696.000 CY 0010 672-16 LAB BUILDING LUMP LUMP SECTION NO. 0002 LAB BUILDING - PHASE 2 0015 672-16 LAB BUILDING LUMP LUMP SECTION NO. 0003 LAB BUILDING - PHASE 3 0020 672-16 LAB BUILDING LUMP LUMP 1 STATE PROJECT PAGE 38 Call Order : 018 CONTRACT ID : 9915581R2 Letting Date : 09/28/99 10:00 A.M. PROJECTS : G049-0UCM/0H-001.00 04 COUNTIES : UPSHUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CONST BLDG & FAC 0005 204-01 MOBILIZATION LUMP LUMP 0010 672-08 OFFICE AND SHOP BUILDING LUMP LUMP 0015 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 100.000 TN AA1 0020 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 91.000 TN AA2 1 STATE PROJECT PAGE 39 Call Order : 019 CONTRACT ID : 9821821 Letting Date : 09/28/99 10:00 A.M. PROJECTS : S320-0079/00-001.00 00 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIGNING 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICES 33,000.000 UN 0015 636-14 FLAGGER 1,000.000 HR 0020 636-21 ELECTRIC ARROW 60.000 DA 0025 657-06(S4X7.7 A-441SUPPORTS, GALVANIZED 484.000 LF 0030 657-06(W 8X18 A-441SUPPORTS, GALVANIZED 32.000 LF 0035 657-17 CLASS B CONCRETE FOOTING, REINFORCED, ROADSIDE 11.600 CY 0040 657-18 POST REMOVAL 34.000 EA 0045 661-01(3) (0.08) FLAT SHEET SIGN OVERLAY 22,696.000 SF 0050 661-11 INSTALLATION OF REUSABLE SIGNS 18.000 EA 1 STATE PROJECT PAGE 40 Call Order : 020 CONTRACT ID : 9923508 Letting Date : 09/28/99 10:00 A.M. PROJECTS : S325-0032/00-000.31 00 COUNTIES : MARION HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 2,380.000 GA 0010 636-11 TRAFFIC CONTROL DEVICES 880.000 UN 0015 636-14 FLAGGER 180.000 HR 0020 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 715.000 TN AA1 0025 308-01S CLASS 1 AGGREGATE, SLAG 644.000 TN AA2 0030 407-2(I)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 3,925.000 TN BB1 0035 407-2(I)S HOT-MIX ASPHALT WEARING COURSE, SLAG 3,533.000 TN BB2 1 STATE PROJECT PAGE 41 Call Order : 021 CONTRACT ID : 9923021 Letting Date : 09/28/99 10:00 A.M. PROJECTS : S340-0019/00-000.44 00 COUNTIES : PUTNAM GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 1,430.000 GA 0010 636-11 TRAFFIC CONTROL DEVICES 11,477.000 UN 0015 636-14 FLAGGER 60.000 HR 0020 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 690.000 TN AA1 0025 308-01S CLASS 1 AGGREGATE, SLAG 625.000 TN AA2 0030 407-2(I)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,970.000 TN BB1 0035 407-2(I)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,780.000 TN BB2 0040 407-3SG HOT-MIX ASPHAPLT PATCH AND LEVEL COURSE, STONE OR GRAVEL 300.000 TN CC1 0045 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 270.000 TN CC2 1 FEDERAL PROJECT PAGE 42 Call Order : 022 CONTRACT ID : 9903782 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U326-0002/00-010.25 00 COUNTIES : MARSHALL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/27/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY ITEMS 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 105,458.000 CY 0020 207-02 SUBGRADE 5,119.000 CY 0025 207-34 FABRIC FOR SEPARATION 37,390.000 SY 0030 218-03 GABIONS 40.000 CY 0035 307-01 CLASS 1 AGGREGATE BASE COURSE 2,085.000 CY 0040 308-01 CLASS 1 AGGREGATE BASE COURSE 777.000 TN 0045 311-06 OPEN GRADED FREE DRAINING BASE COURSE 3,489.000 CY 0050 408-02 BITUMINOUS MATERIAL 6,187.000 GA 0055 409-02 BITUMINOUS MATERIAL 5,324.000 GA 0060 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 1,789.500 LF 0065 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 365.000 LF 0070 604-09(24) END SECION FOR CORRUGATED STEEL PIPE 1.000 EA 0075 604-72(18) SAFETY SLOPE END SECTION FOR CSP 2.000 EA 0080 605-04 TYPE B INLET 11.000 EA 0085 605-05 TYPE C INLET 2.000 EA 0090 605-09 TYPE G INLET 22.000 EA 0095 606-29 FREE DRAINING BASE (FDB) TRENCH 8,967.000 LF 0100 606-30 OUTLET PIPE 351.000 LF 0105 607-01(I) TYPE 1 GUARDRAIL 1,412.500 LF 1 FEDERAL PROJECT PAGE 43 Call Order : 022 CONTRACT ID : 9903782 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U326-0002/00-010.25 00 COUNTIES : MARSHALL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/27/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY ITEMS 0110 607-06 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 6.000 EA 0115 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 5,903.000 LF 0120 607-25(A) CUT SLOPE TERMINAL, TYPE A 2.000 EA 0125 607-65 FLARED END TERMINAL 1.000 EA 0130 610-06(VII) MEDIAN 5,640.000 LF 0135 633-01 CONCRETE GUTTER 94.000 SY 0140 636-07 ERADICATION OF PAVEMENT MARKINGS 25,000.000 LF 0145 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 33,000.000 LF 0150 636-11 TRAFFIC CONTROL DEVICES 16,280.000 UN 0155 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 4.000 EA 0160 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 100.000 EA 0165 636-14 FLAGGER 1,400.000 HR 0170 636-17 TEMPORARY CONCRETE BARRIERS 6,100.000 LF 0175 636-18 REMOVING AND RESETTING TEMPORARY CONCRETE BARRIERS 500.000 LF 0180 636-25(B) WARNING LIGHTS 1,500.000 DA 0185 636-25(C) WARNING LIGHTS 13,000.000 DA 0190 637-01 WATER FOR DUST PALLIATIVE 210.000 MG 0195 638-02 RIGHT OF WAY MARKERS 7.000 EA 0200 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0205 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0210 640-03 BUILDING EQUIPMENT LUMP LUMP 1 FEDERAL PROJECT PAGE 44 Call Order : 022 CONTRACT ID : 9903782 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U326-0002/00-010.25 00 COUNTIES : MARSHALL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/27/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY ITEMS 0215 642-04-1 TEMPORARY SEED 756.000 LB 0220 642-05-1 STRAW OR HAY MULCH 12.400 TN 0225 642-06 FERTILIZER 2.700 TN 0230 642-10 AGRICULTURAL LIMESTONE 9.200 TN 0235 642-11 HAY OR STRAW BALES 239.000 EA 0240 642-12 SILT FENCE 18,780.000 LF 0245 652-01 AGRICULTURAL LIMESTONE 7.000 TN 0250 652-02-1 FERTILIZER, 10-20-10 5.300 TN 0255 652-02-2 UREA FORMALDEHYDE FERTILIZER 0.990 TN 0260 652-03-05 SEED MIXTURE L 756.000 LB 0265 652-04-1 STRAW OR HAY MULCH 12.400 TN 0270 664-01(IV) IMPACT ATTENUATING DEVICE, TYPE IV 6.000 EA 0275 664-01(IV)A REMOVE AND RESET G.R.E.A.T. ATTENUATOR DEVICE 2.000 EA 0280 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 27,068.000 TN AA1 0285 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 24,605.000 TN AA2 0290 401-7SG SCRATCH COURSE, STONE OR GRAVEL 516.000 TN BB1 0295 401-7S SCRATCH COURSE, SLAG 469.000 TN BB2 0300 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 3,525.000 TN CC1 0305 402-01(1)S HMA SKID PVT, (W-1) SLAG 3,204.000 TN CC2 0310 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 50.000 TN DD1 0315 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 45.000 TN DD2 SECTION NO. 0002 PAVEMENT MARKINGS AND SIGNS 1 FEDERAL PROJECT PAGE 45 Call Order : 022 CONTRACT ID : 9903782 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U326-0002/00-010.25 00 COUNTIES : MARSHALL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/27/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 PAVEMENT MARKINGS AND SIGNS 0320 657-10 (3.00LB) CHANNEL POSTS 750.000 LF 0325 661-01(1) (0.080),FLAT SHEET SIGNS 336.010 SF 0330 661-06 DELINEATORS, AMBER NINE PER UNIT 2.000 UN 0335 663-01-1(II)W EDGE LINE, WHITE 5,450.000 LF 0340 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 4,800.000 LF 0345 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 1,650.000 LF 0350 663-03-1(II) BARRIER LINES 8,000.000 LF 0355 663-07(II)Y TYPE II, STRIPE YELLOW (12 IN) 10,875.000 LF 0360 663-10(V) TYPE V, LANE ARROWS 14.000 EA SECTION NO. 0003 PILE WALLS 1 AND 2 0365 211-02 ROCK BORROW EXCAVATION 3,340.000 CY 0370 614-1(W10X49) STEEL PILES 775.000 LF 0375 614-1(W14X132 STEEL PILES 7,290.000 LF 0380 614-1(W14X61) STEEL PILES 2,240.000 LF 0385 614-3(8) CONCRETE LAGGING 14,330.000 SF 0390 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP SECTION NO. 0004 PILE WALL 3 0395 308-07 CLASS 7 AGGREGATE BASE COURSE 75.000 CY 0400 614-1(W12X120 STEEL PILES 4,026.000 LF 0405 614-4 TIMBER LAGGING 1,070.000 SF 1 FEDERAL PROJECT PAGE 46 Call Order : 022 CONTRACT ID : 9903782 Letting Date : 09/28/99 10:00 A.M. PROJECTS : U326-0002/00-010.25 00 COUNTIES : MARSHALL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/27/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0004 PILE WALL 3 0410 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 47 Call Order : 023 CONTRACT ID : 9909912R1 Letting Date : 09/28/99 10:00 A.M. PROJECTS : S323-0010/00-032.93 00 COUNTIES : LOGAN GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CHAPMANVILLE SIDEWALKS 0005 204-01 MOBILIZATION LUMP LUMP 0010 604-50(15) CORRUGATED POLYETHYLENE PIPE 112.000 LF 0015 604-50(18) CORRUGATED POLYETHYLENE PIPE 334.000 LF 0020 605-04 TYPE B INLET 2.000 EA 0025 605-04-1 TYPE B INLET, MODIFIED 1.000 EA 0030 605-19 ADJUSTING TYPE B INLET 1.000 EA 0035 608-01(4F) RIGHT-OF-WAY FENCE, CHAIN LINK TYPE 565.000 LF 0040 609-01 CONCRETE SIDEWALK 1,225.000 SY 0045 610-01(I) PLAIN CONCRETE CURBING 815.000 LF 0050 636-11 TRAFFIC CONTROL DEVICES 1,455.000 UN 0055 636-14 FLAGGER 290.000 HR 0060 401-03SG HOT-LAID ASPHALT PATCH & LEVEL COURSE, STONE OR GRAVEL 100.000 TN AA1 2 IN THICKNESS MAXIMUM 0065 401-03S HOT-LAID ASPHALT PATCH & LEVEL COURSE, SLAG 91.000 TN AA2 2 IN THICKNESS MAXIMUM