1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- February 15, 2000 LETTING Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its office in Building Five, Room A-148, 1900 Kanawha Boulevard East, Charleston, West Virginia 25305-0430 until 10 A.M. February 15, 2000 and said proposals will be publicly opened and read immediately thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 9913325 S309-0050/00-012.88 00 00NH 0050 164 E00 REHABILITATION-RESTORATION-RESURFACING MORGAN'S RUN - WALDO'S RUN CO 20 - CO 50/13 COUNTY: DODDRIDGE DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 002 9914106 S314-0050/00-010.06 00 0STP 0050 168 E00 RESURFACING ROMNEY-CAPON BRIDGE ROAD CO 10 - CO 50/32 COUNTY: HAMPSHIRE ------------------------------------------------------------------------------------------------------------------------------------ 003 9912507 S318-0056/00-002.24 00 0STP 0056 090 E00 REHABILITATION-RESTORATION-RESURFACING SILVERTON SANDYVILLE ROAD JCT CR 33/7 TO JCT CR 21 COUNTY: JACKSON DBE GOAL: 10 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 004 9914105 S338-0219/00-000.00 00 00NH 0219 112 E00 REHABILITATION-RESTORATION-RESURFACING GREENBRIER COUNTY LINE TO HILLSBORO BEGIN: GREENBRIER COUNTY LINE - END: JUNCTION CR 20 COUNTY: POCAHONTAS DBE GOAL: 7 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 005 9913319 S339-0024/00-000.00 00 0STP 0024 021 E00 REHABILITATION-RESTORATION-RESURFACING EGLON - SILVER LAKE ROAD US 219 - US 50 COUNTY: PRESTON DBE GOAL: 2 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 006 9914104 S342-0219/00-049.59 00 00NH 0219 113 E00 REHABILITATION-RESTORATION-RESURFACING MONTROSE - TUCKER COUNTY LINE BEGIN: 0.50 MI SOUTH OF CO 219/3 - END: TUCKER COUNTY LINE COUNTY: RANDOLPH DBE GOAL: 15 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 007 9912656 S354-0050/00-013.52 00 00NH 0050 163 E00 REHABILITATION-RESTORATION-RESURFACING PARKERSBURG-ELLENBORO ROAD (EASTBOUND ONLY) 0.2 MI. W. OF JCT 50/35 - 0.2 MI. W. OF RITCHIE CO. LINE COUNTY: WOOD DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- February 15, 2000 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 008 *9805903 U315-0011/00-002.56 00 INTERSECTION IMPROVEMENT KINGS CREEK ROAD BEGIN: MP 2.56 END: MP 2.66 COUNTY: HANCOCK ------------------------------------------------------------------------------------------------------------------------------------ 009 *9805908 U348-0018/00-010.26 00 INTERSECTION IMPROVEMENT WV 18 & WV 23 INTERSECTION JCT WV 18 & WV 23 COUNTY: TYLER ------------------------------------------------------------------------------------------------------------------------------------ 010 9835101 U340-0046/02-001.07 00 UPGRADE & WIDEN PAVEMENT SCOTT LANE ROAD CSX RR CROSSING TO CR 33 COUNTY: PUTNAM ------------------------------------------------------------------------------------------------------------------------------------ 011 9834101 U319-0024/00-000.00 00 CONST TURN LANE(S) COUNTRY CLUB ROAD US 340 - 0.06 MI W US 340 COUNTY: JEFFERSON ------------------------------------------------------------------------------------------------------------------------------------ 012 9933471 X354-00D0/00-007.00 08 0APD 0282 122 C00 CONST NEW/RELOC ROAD GODBEY FIELD RELOCATION 1.2 MI W CO 32 & WV 14 COUNTY: WOOD DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : 214,218 CY - UNCLASSIFIED EXCAVATION ------------------------------------------------------------------------------------------------------------------------------------ 013 9816892 U320-0015/00-013.80 00 CONST NEW/RELOC ROAD WO/PAVING MIDDLE FORK OF DAVIS CREEK 0.3 MI S CO 15/3 - 0.31 MI N CO 15/1 COUNTY: KANAWHA ------------------------------------------------------------------------------------------------------------------------------------ 014 *9921800 U320-0043/00-001.28 00 STPG 0043 119 E00 TRAFFIC SIGNAL FRAME ROAD AT I-79 NB RAMPS ELKVIEW COUNTY: KANAWHA ------------------------------------------------------------------------------------------------------------------------------------ 015 *9930802 U328-0052/25-000.43 00 TRAFFIC SIGNAL CHERRY STREET AT THE BLUEFIELD REGIONAL MEDICAL CENTER BLUEFIELD COUNTY: MERCER ------------------------------------------------------------------------------------------------------------------------------------ 016 9535354R1 S340-0064/00-043.79 00 00IM 0641 229 E00 STRUCTURE RENOVATION DONALD LEGG BRIDGE RENOVATION OVER KANAWHA RIVER, 0.29 MI. NE COUNTY: PUTNAM BRIDGE : 2134.3 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 4 ; CONTRACT: 9535354 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- February 15, 2000 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of total bid, whichever is greater. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained at the Charleston office. The right is reserved to reject any or all proposals. *These are projects on which any contractor with a Category "W" Prequalification Rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals on all projects will be furnished at twenty-five dollars ($25.00) per set. Extra plans will be furnished at fifteen dollars ($15.00) per set and extra proposals will be furnished at ten dollars ($10.00) per proposal. Cross sections will be furnished at fifty dollars ($50.00) per set. All will be furnished without refund and transmitted at your risk. The above noted project information will be available in the Contract Unit, Construction Section, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305 and may also be ordered by calling (304)558-2874. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national orign in consideration for an award. No proposals for these projects will be issued after 3:00 P.M. on the day prior to the letting. It is necessary to advise your approximate uncompleted workload when ordering plans and proposals. Announcement, opening and reading of bids received will be in the order as designated in the "Notice to Contractors". Sealed proposals may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9 A.M. and 10 A.M., the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division Of Highways John J. Welch, Jr., Director Project Control Division 1 1 FEDERAL PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 9913325 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S309-0050/00-012.88 00 00NH 0050 164 E00 COUNTIES : DODDRIDGE DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: DONALD WILLIAMS DESCRIPTION: MORGAN'S RUN - WALDO'S RUN ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DRAINAGE, RESURFACING, GUARDRAIL 0005 204-01 MOBILIZATION LUMP LUMP 0010 207-01 UNCLASSIFIED EXCAVATION 975.000 CY 0015 211-01 UNCLASSIFIED BORROW EXCAVATION 945.000 CY 0020 408-02 BITUMINOUS MATERIAL 5,353.000 GA 0025 409-02 BITUMINOUS MATERIAL 6,900.000 GA 0030 415-05 REMOVE EXISTING PAVEMENT SURFACE 625.000 SY 0035 506-01 CONCRETE PAVEMENT REPAIR 402.000 SY 0040 507-02 CRACK AND POTHOLE REPAIR 100.000 TN 0045 604-01(8)A1 METALLIC COATED CORRUGATED STEEL PIPE 1,550.000 LF 0050 605-24 ADJUSTING TYPE G INLET 5.000 EA 0055 607-01(I) TYPE 1 GUARDRAIL 14,100.000 LF 0060 607-10-1(A) GUARDRAIL REMOVAL 14,225.000 LF 0065 607-25(A) CUT SLOPE TERMINAL, TYPE A 2.000 EA 0070 607-30 SPECIAL TRAILING END TERMINAL 5.000 EA 0075 607-65 FLARED END TERMINAL 4.000 EA 0080 636-01 TRAFFIC CONTROL LUMP LUMP 0085 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 50,000.000 LF 0090 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN SOLID LINE 3,200.000 LF 0095 636-11 TRAFFIC CONTROL DEVICES 62,310.000 UN 0100 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 4.000 EA 1 FEDERAL PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 9913325 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S309-0050/00-012.88 00 00NH 0050 164 E00 COUNTIES : DODDRIDGE DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DRAINAGE, RESURFACING, GUARDRAIL 0105 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 1,000.000 EA 0110 636-14 FLAGGER 600.000 HR 0115 636-22 CHANGABLE MESSAGE SIGN 240.000 DA 0120 636-25(B) WARNING LIGHTS 1,800.000 DA 0125 640A-1 MINIMAL FIELD OFFICE LUMP LUMP 0130 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0135 657-08 (2.00LB) CHANNEL POSTS 735.000 LF 0140 661-04(1) DELINEATORS, REFLEX REFLECTOR ,WHITE SINGLE 85.000 EA 0145 661-05(1) DELINEATORS, REFLEX REFLECTOR ,AMBER SINGLE 20.000 EA 0150 663-01-1(II)W EDGE LINE, WHITE 25,400.000 LF 0155 663-01-1(II)Y EDGE LINE, YELLOW 25,400.000 LF 0160 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 6,400.000 LF 0165 663-04(II) TYPE II CHANNELIZING LINES 500.000 LF 0170 663-05(V) TYPE V, STOP LINES 140.000 LF 0175 663-10(V) TYPE V, LANE ARROWS 5.000 EA 0180 663-12(P-2) RAISED PAVEMENT MARKER, TYPE P-2 335.000 EA 0185 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 3,110.000 TN AA1 0190 308-01S CLASS 1 AGGREGATE, SLAG 2,799.000 TN AA2 0195 308-07SG CLASS 7 AGGREGATE, STONE OR GRAVEL 255.000 TN BB1 0200 308-07S CLASS 7 AGGREGATE, SLAG 230.000 TN BB2 0205 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 21,860.000 TN CC1 1 FEDERAL PROJECT PAGE 3 Call Order : 001 CONTRACT ID : 9913325 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S309-0050/00-012.88 00 00NH 0050 164 E00 COUNTIES : DODDRIDGE DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DRAINAGE, RESURFACING, GUARDRAIL 0210 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 19,674.000 TN CC2 0215 401-7SG SCRATCH COURSE, STONE OR GRAVEL 2,000.000 TN DD1 0220 401-7S SCRATCH COURSE, SLAG 1,800.000 TN DD2 0225 401-14SG HOT-MIX ASPHALT FOR SHOULDER REPAIR,STONE/GRAVEL 1,925.000 TN EE1 0230 401-14S HOT-MIX ASPHALT FOR SHOULDER REPAIR, SLAG 1,732.000 TN EE2 0235 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 4,239.000 TN FF1 0240 402-01(1)S HMA SKID PVT, (W-1) SLAG 3,815.000 TN FF2 1 FEDERAL PROJECT PAGE 4 Call Order : 002 CONTRACT ID : 9914106 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S314-0050/00-010.06 00 0STP 0050 168 E00 COUNTIES : HAMPSHIRE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 211-08 ROCK BORROW EXCAVATION 35.000 TN 0010 218-03 GABIONS 28.000 CY 0015 229-01 SHOULDERS AND DITCHES 0.040 LM 0020 240-02 CLEANING INLETS 8.000 EA 0025 408-02 BITUMINOUS MATERIAL 1,070.000 GA 0030 409-02 BITUMINOUS MATERIAL 110.000 GA 0035 604-50(18) CORRUGATED POLYETHYLENE PIPE 40.000 LF 0040 605-09 TYPE G INLET 1.000 EA 0045 607-01(I) TYPE 1 GUARDRAIL 187.500 LF 0050 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 425.000 LF 0055 607-10-1(A) GUARDRAIL REMOVAL 1,025.000 LF 0060 607-35 GUARDRAIL ELEMENT 22.000 EA 0065 607-37 BUFFER END SECTION 3.000 EA 0070 607-65 FLARED END TERMINAL 13.000 EA 0075 607-66 TANGENT END TERMINAL 2.000 EA 0080 636-06 PILOT TRUCK AND DRIVER 20.000 DA 0085 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 21,130.000 LF 0090 636-11 TRAFFIC CONTROL DEVICES 2,650.000 UN 0095 636-14 FLAGGER 400.000 HR 0100 308-01S CLASS 1 AGGREGATE, SLAG 709.800 TN AA1 0105 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 780.000 TN AA2 1 FEDERAL PROJECT PAGE 5 Call Order : 002 CONTRACT ID : 9914106 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S314-0050/00-010.06 00 0STP 0050 168 E00 COUNTIES : HAMPSHIRE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 114.550 TN BB1 0115 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 120.000 TN BB2 0120 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 630.000 TN CC1 0125 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 660.000 TN CC2 0130 401-7S SCRATCH COURSE, SLAG 916.360 TN DD1 0135 401-7SG SCRATCH COURSE, STONE OR GRAVEL 960.000 TN DD2 0140 402-01(1)S HMA SKID PVT, (W-1) SLAG 2,166.820 TN EE1 0145 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 2,240.000 TN EE2 1 FEDERAL PROJECT PAGE 6 Call Order : 003 CONTRACT ID : 9912507 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S318-0056/00-002.24 00 0STP 0056 090 E00 COUNTIES : JACKSON DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DRAINAGE IMPROVEMENTS 0005 207-09 UNCLASSIFIED EXCAVATION LUMP LUMP 0010 211-08 ROCK BORROW EXCAVATION 636.000 TN 0015 229-01 SHOULDERS AND DITCHES 1.550 LM 0020 408-02 BITUMINOUS MATERIAL 610.000 GA 0025 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 160.000 LF 0030 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 115.000 LF 0035 604-10(17X13) METALLIC COATED CORRUGATED STEEL PIPE ARCH 400.000 LF 0040 604-37(18)III REINFORCED CONCRETE PIPE 10.000 LF 0045 604-72(18) SAFETY SLOPE END SECTION FOR CSP 2.000 EA 0050 605-04 TYPE B INLET 2.000 EA 0055 605-04-10 CONCRETE BOX DITCH 10.000 LF 0060 605-09 TYPE G INLET 2.000 EA 0065 605-09-1 TYPE G INLET, MODIFIED 7.000 EA 0070 607-01(I) TYPE 1 GUARDRAIL 3,562.500 LF 0075 607-10-1(A) GUARDRAIL REMOVAL 400.000 LF 0080 607-65 FLARED END TERMINAL 3.000 EA 0085 622-03 CANTILEVER MAILBOX SUPPORT 18.000 EA 0090 636-06 PILOT TRUCK AND DRIVER 10.000 DA 0095 636-11 TRAFFIC CONTROL DEVICES 5,394.000 UN 0100 636-14 FLAGGER 1,000.000 HR 0105 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 196.000 TN AA1 1 FEDERAL PROJECT PAGE 7 Call Order : 003 CONTRACT ID : 9912507 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S318-0056/00-002.24 00 0STP 0056 090 E00 COUNTIES : JACKSON DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DRAINAGE IMPROVEMENTS 0110 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 179.000 TN AA2 0115 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 1,750.000 TN BB1 0120 308-01S CLASS 1 AGGREGATE, SLAG 1,593.000 TN BB2 0125 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 90.000 TN CC1 0130 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 82.000 TN CC2 0135 401-17SG HOT-MIX ASPHALT POTHOLE REPAIR, STONE OR GRAVEL 12.000 TN DD1 0140 401-17S HOT-MIX ASPHALT POTHOLE REPAIR, SLAG 11.000 TN DD2 0145 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 51.000 TN EE1 0150 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 47.000 TN EE2 0155 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,210.000 TN FF1 0160 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,102.000 TN FF2 0165 401-7SG SCRATCH COURSE, STONE OR GRAVEL 770.000 TN GG1 0170 401-7S SCRATCH COURSE, SLAG 701.000 TN GG2 1 FEDERAL PROJECT PAGE 8 Call Order : 004 CONTRACT ID : 9914105 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S338-0219/00-000.00 00 00NH 0219 112 E00 COUNTIES : POCAHONTAS DBE GOALS : 7.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/00 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACE WITH 110#/SY OF WEARING COURSE, SCRATCH COURSE, 0005 218-08 SHOT ROCK 20.000 TN 0010 408-02 BITUMINOUS MATERIAL 2,000.000 GA 0015 604-10(21X15) METALLIC COATED CORRUGATED STEEL PIPE ARCH 85.000 LF 0020 604-50(18) CORRUGATED POLYETHYLENE PIPE 780.000 LF 0025 604-50(24) CORRUGATED POLYETHYLENE PIPE 230.000 LF 0030 604-50(30) CORRUGATED POLYETHYLENE PIPE 115.000 LF 0035 605-09 TYPE G INLET 10.000 EA 0040 607-01(I) TYPE 1 GUARDRAIL 762.500 LF 0045 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 6,862.500 LF 0050 607-10-1 TYPE 1 GUARDRAIL REMOVED AND STORED 150.000 LF 0055 607-65 FLARED END TERMINAL 2.000 EA 0060 636-06 PILOT TRUCK AND DRIVER 32.000 DA 0065 636-11 TRAFFIC CONTROL DEVICES 5,360.000 UN 0070 636-14 FLAGGER 640.000 HR 0075 663-01(II)W EDGE LINE WHITE 10.600 MI 0080 663-02(II)Y LANE LINE OR CENTER LINE YELLOW 5.300 MI 0085 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 2,525.000 TN AA1 0090 308-08S CLASS 8 AGGREGATE, SLAG 2,298.000 TN AA2 0095 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,875.000 TN BB1 0100 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,706.000 TN BB2 0105 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 4,025.000 TN CC1 1 FEDERAL PROJECT PAGE 9 Call Order : 004 CONTRACT ID : 9914105 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S338-0219/00-000.00 00 00NH 0219 112 E00 COUNTIES : POCAHONTAS DBE GOALS : 7.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/00 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACE WITH 110#/SY OF WEARING COURSE, SCRATCH COURSE, 0110 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 3,663.000 TN CC2 0115 407-7SG SCRATCH COURSE, STONE OR GRAVEL 3,946.000 TN DD1 0120 407-7S SCRACTH COURSE, SLAG 3,591.000 TN DD2 1 FEDERAL PROJECT PAGE 10 Call Order : 005 CONTRACT ID : 9913319 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S339-0024/00-000.00 00 0STP 0024 021 E00 COUNTIES : PRESTON DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/30/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DRAINAGE, RESURFACING, GUARDRAIL 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 218-03 GABIONS 56.000 CY 0015 229-01 SHOULDERS AND DITCHES 5.630 LM 0020 240-01(15) CLEANING CULVERTS 50.000 LF 0025 408-02 BITUMINOUS MATERIAL 3,300.000 GA 0030 605-09 TYPE G INLET 3.000 EA 0035 605-24 ADJUSTING TYPE G INLET 1.000 EA 0040 605-51 TYPE U INLET 2.000 EA 0045 607-01(I) TYPE 1 GUARDRAIL 1,725.000 LF 0050 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 3,300.000 LF 0055 607-10-1(A) GUARDRAIL REMOVAL 762.500 LF 0060 636-06 PILOT TRUCK AND DRIVER 24.000 DA 0065 636-11 TRAFFIC CONTROL DEVICES 3,580.000 UN 0070 636-14 FLAGGER 480.000 HR 0075 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 3,250.000 TN AA1 0080 308-01S CLASS 1 AGGREGATE, SLAG 2,926.000 TN AA2 0085 308-07SG CLASS 7 AGGREGATE, STONE OR GRAVEL 93.000 TN BB1 0090 308-07S CLASS 7 AGGREGATE, SLAG 84.000 TN BB2 0095 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 5,440.000 TN CC1 0100 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 4,950.000 TN CC2 0105 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 3,840.000 TN DD1 1 FEDERAL PROJECT PAGE 11 Call Order : 005 CONTRACT ID : 9913319 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S339-0024/00-000.00 00 0STP 0024 021 E00 COUNTIES : PRESTON DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/30/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DRAINAGE, RESURFACING, GUARDRAIL 0110 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 3,500.000 TN DD2 1 FEDERAL PROJECT PAGE 12 Call Order : 006 CONTRACT ID : 9914104 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S342-0219/00-049.59 00 00NH 0219 113 E00 COUNTIES : RANDOLPH DBE GOALS : 15.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/00 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 HMA RESURFACING, SCRATCH COURSE, 1"HMA PAVEMENT, PAVEMENT 0005 211-01 UNCLASSIFIED BORROW EXCAVATION 8.000 CY 0010 211-08 ROCK BORROW EXCAVATION 22.000 TN 0015 218-03 GABIONS 55.000 CY 0020 218-08 SHOT ROCK 73.000 TN 0025 408-02 BITUMINOUS MATERIAL 1,950.000 GA 0030 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 500.000 SY 0035 604-50(18) CORRUGATED POLYETHYLENE PIPE 440.000 LF 0040 604-50(36) CORRUGATED POLYETHYLENE PIPE 45.000 LF 0045 604-53(18) RELAID CONDUIT 12.000 LF 0050 605-09 TYPE G INLET 3.000 EA 0055 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 5,687.500 LF 0060 607-10-1 TYPE 1 GUARDRAIL REMOVED AND STORED 287.500 LF 0065 607-35 GUARDRAIL ELEMENT 10.000 EA 0070 607-42 STEEL POSTS (6') 15.000 EA 0075 607-65 FLARED END TERMINAL 5.000 EA 0080 607-66 TANGENT END TERMINAL 2.000 EA 0085 636-06 PILOT TRUCK AND DRIVER 28.000 DA 0090 636-11 TRAFFIC CONTROL DEVICES 3,496.000 UN 0095 636-14 FLAGGER 560.000 HR 0100 663-01(II)W EDGE LINE WHITE 9.560 MI 0105 663-02(II)Y LANE LINE OR CENTER LINE YELLOW 4.780 MI 1 FEDERAL PROJECT PAGE 13 Call Order : 006 CONTRACT ID : 9914104 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S342-0219/00-049.59 00 00NH 0219 113 E00 COUNTIES : RANDOLPH DBE GOALS : 15.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/00 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 HMA RESURFACING, SCRATCH COURSE, 1"HMA PAVEMENT, PAVEMENT 0110 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 2,900.000 TN AA1 0115 308-08S CLASS 8 AGGREGATE, SLAG 2,639.000 TN AA2 0120 308-09SG CLASS 9 AGGREGATE STONE OR GRAVEL 254.000 TN BB1 0125 308-09S CLASS 9 AGGREGATE SLAG 231.000 TN BB2 0130 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 421.000 TN CC1 0135 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 383.000 TN CC2 0140 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 3,650.000 TN DD1 0145 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 3,325.000 TN DD2 0150 407-7SG SCRATCH COURSE, STONE OR GRAVEL 3,700.000 TN EE1 0155 407-7S SCRACTH COURSE, SLAG 3,367.000 TN EE2 1 FEDERAL PROJECT PAGE 14 Call Order : 007 CONTRACT ID : 9912656 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S354-0050/00-013.52 00 00NH 0050 163 E00 COUNTIES : WOOD DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, GUARDRAIL, PAVEMENT MARKINGS, PAVED SHOULDERS 0005 229-01 SHOULDERS AND DITCHES 4.790 LM 0010 408-02 BITUMINOUS MATERIAL 3,258.000 GA 0015 607-01(I) TYPE 1 GUARDRAIL 16,430.000 LF 0020 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 500.000 LF 0025 607-10-1(A) GUARDRAIL REMOVAL 16,337.500 LF 0030 607-25(A)1 MODIFIED CUT SLOPE TERMINAL, TYPE A 1.000 EA 0035 607-25(B) CUT SLOPE TERMINAL, TYPE B 1.000 EA 0040 607-30 SPECIAL TRAILING END TERMINAL 7.000 EA 0045 607-65 FLARED END TERMINAL 5.000 EA 0050 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 151,410.000 LF 0055 636-11 TRAFFIC CONTROL DEVICES 34,926.000 UN 0060 636-14 FLAGGER 50.000 HR 0065 636-21 ELECTRIC ARROW 45.000 DA 0070 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0075 661-13 PLASTIC DELINEATOR POSTS 43.000 EA 0080 661-21 DELINEATORS, TYPE B-1, CRYSTAL 87.000 EA 0085 663-12(P-2) RAISED PAVEMENT MARKER, TYPE P-2 327.000 EA 0090 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 4,935.000 TN AA1 0095 308-01S CLASS 1 AGGREGATE, SLAG 8,772.000 TN AA2 0100 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 9,639.000 TN BB1 0105 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 8,772.000 TN BB2 1 FEDERAL PROJECT PAGE 15 Call Order : 007 CONTRACT ID : 9912656 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S354-0050/00-013.52 00 00NH 0050 163 E00 COUNTIES : WOOD DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, GUARDRAIL, PAVEMENT MARKINGS, PAVED SHOULDERS 0110 401-17SG HOT-MIX ASPHALT POTHOLE REPAIR, STONE OR GRAVEL 25.000 TN CC1 0115 401-17S HOT-MIX ASPHALT POTHOLE REPAIR, SLAG 23.000 TN CC2 0120 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 6,263.000 TN DD1 0125 402-01(1)S HMA SKID PVT, (W-1) SLAG 5,700.000 TN DD2 1 STATE PROJECT PAGE 16 Call Order : 008 CONTRACT ID : 9805903 Letting Date : 02/15/00 10:00 A.M. PROJECTS : U315-0011/00-002.56 00 COUNTIES : HANCOCK GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202-01 BUILDING DEMOLITION LUMP LUMP 0015 204-01 MOBILIZATION LUMP LUMP 0020 207-01 UNCLASSIFIED EXCAVATION 1,925.000 CY 0025 207-34 FABRIC FOR SEPARATION 1,333.000 SY 0030 211-08 ROCK BORROW EXCAVATION 962.000 TN 0035 409-02 BITUMINOUS MATERIAL 582.000 GA 0040 601-06 CLASS D CONCRETE 2.200 CY 0045 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 75.000 LF 0050 605-04 TYPE B INLET 2.000 EA 0055 605-09 TYPE G INLET 1.000 EA 0060 607-01(II) TYPE 1 GUARDRAIL 362.500 LF 0065 607-37 BUFFER END SECTION 2.000 EA 0070 636-11 TRAFFIC CONTROL DEVICES 3,933.000 UN 0075 636-14 FLAGGER 480.000 HR 0080 638-02 RIGHT OF WAY MARKERS 8.000 EA 0085 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0090 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0095 663-01-1(II)W EDGE LINE, WHITE 1,048.000 LF 0100 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 1,048.000 LF 0105 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 540.000 TN AA1 1 STATE PROJECT PAGE 17 Call Order : 008 CONTRACT ID : 9805903 Letting Date : 02/15/00 10:00 A.M. PROJECTS : U315-0011/00-002.56 00 COUNTIES : HANCOCK GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 529.000 TN AA2 0115 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 32.000 TN BB1 0120 308-01S CLASS 1 AGGREGATE, SLAG 31.000 TN BB2 0125 308-01STS CLASS 1 AGGREGATE, STEEL SLAG 36.000 TN BB3 0130 407-1(II)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 396.000 TN CC1 0135 407-1(II)S HOT-MIX ASPHALT BASE COURSE, SLAG 360.000 TN CC2 0140 407-2(III)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 67.000 TN DD1 0145 407-2(III)S HOT-MIX ASPHALT WEARING COURSE, SLAG 61.000 TN DD2 1 STATE PROJECT PAGE 18 Call Order : 009 CONTRACT ID : 9805908 Letting Date : 02/15/00 10:00 A.M. PROJECTS : U348-0018/00-010.26 00 COUNTIES : TYLER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/01/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 I/S IMPROVEMENT 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 146.000 CY 0020 207-02 SUBGRADE 226.000 CY 0025 207-34 FABRIC FOR SEPARATION 1,205.000 SY 0030 211-01 UNCLASSIFIED BORROW EXCAVATION 1,398.000 CY 0035 211-02 ROCK BORROW EXCAVATION 323.000 CY 0040 218-06 FOUNDATION PROTECTION 170.000 CY 0045 409-02 BITUMINOUS MATERIAL 479.000 GA 0050 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 137.000 LF 0055 605-09 TYPE G INLET 1.000 EA 0060 607-01(I) TYPE 1 GUARDRAIL 300.000 LF 0065 607-06 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 2.000 EA 0070 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN SOLID LINE 3,300.000 LF 0075 636-11 TRAFFIC CONTROL DEVICES 9,304.000 UN 0080 636-14 FLAGGER 500.000 HR 0085 636-23 TEMPORARY TRAFFIC SIGNAL ( 1.00 ) LUMP 0090 638-02 RIGHT OF WAY MARKERS 3.000 EA 0095 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0100 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0105 663-01-1(II)W EDGE LINE, WHITE 1,100.000 LF 1 STATE PROJECT PAGE 19 Call Order : 009 CONTRACT ID : 9805908 Letting Date : 02/15/00 10:00 A.M. PROJECTS : U348-0018/00-010.26 00 COUNTIES : TYLER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/01/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 I/S IMPROVEMENT 0110 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 1,100.000 LF 0115 663-05(V) TYPE V, STOP LINES 40.000 LF 0120 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 293.000 TN AA1 0125 308-01S CLASS 1 AGGREGATE, SLAG 264.000 TN AA2 0130 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 357.000 TN BB1 0135 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 321.000 TN BB2 0140 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 60.000 TN CC1 0145 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 54.000 TN CC2 0150 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 44.000 TN DD1 0155 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 40.000 TN DD2 1 STATE PROJECT PAGE 20 Call Order : 010 CONTRACT ID : 9835101 Letting Date : 02/15/00 10:00 A.M. PROJECTS : U340-0046/02-001.07 00 COUNTIES : PUTNAM GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 04/01/00 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DRAINAGE, WIDENING AND PAVING 0005 204-01 MOBILIZATION LUMP LUMP 0010 207-01 UNCLASSIFIED EXCAVATION 943.000 CY 0015 207-34 FABRIC FOR SEPARATION 2,643.000 SY 0020 211-03 SELECT BORROW EXCAVATION 19.000 CY 0025 408-02 BITUMINOUS MATERIAL 79.000 GA 0030 409-02 BITUMINOUS MATERIAL 264.000 GA 0035 604-01(54)A2 METALLIC COATED CORRUGATED STEEL PIPE 5.000 LF 0040 604-50(18) CORRUGATED POLYETHYLENE PIPE 332.500 LF 0045 604-50(24) CORRUGATED POLYETHYLENE PIPE 1,426.000 LF 0050 604-50(30) CORRUGATED POLYETHYLENE PIPE 50.000 LF 0055 605-04 TYPE B INLET 18.000 EA 0060 605-08 TYPE F INLET 1.000 EA 0065 605-09 TYPE G INLET 11.000 EA 0070 607-01(II) TYPE 1 GUARDRAIL 62.500 LF 0075 610-01(I) PLAIN CONCRETE CURBING 2,767.500 LF 0080 636-11 TRAFFIC CONTROL DEVICES 3,520.000 UN 0085 636-14 FLAGGER 672.000 HR 0086 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0088 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 6,080.000 LF 0090 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 1,105.000 TN AA1 0095 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 1,005.000 TN AA2 1 STATE PROJECT PAGE 21 Call Order : 010 CONTRACT ID : 9835101 Letting Date : 02/15/00 10:00 A.M. PROJECTS : U340-0046/02-001.07 00 COUNTIES : PUTNAM GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 04/01/00 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DRAINAGE, WIDENING AND PAVING 0100 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 680.000 TN BB1 0105 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 619.000 TN BB2 0110 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 330.000 TN CC1 0115 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 300.000 TN CC2 0120 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 160.000 TN DD1 0125 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 145.000 TN DD2 1 STATE PROJECT PAGE 22 Call Order : 011 CONTRACT ID : 9834101 Letting Date : 02/15/00 10:00 A.M. PROJECTS : U319-0024/00-000.00 00 COUNTIES : JEFFERSON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WIDENING 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 1,270.000 CY 0020 207-34 FABRIC FOR SEPARATION 2,078.000 SY 0025 307-01 CLASS 1 AGGREGATE BASE COURSE 774.000 CY 0030 408-02 BITUMINOUS MATERIAL 794.000 GA 0035 409-02 BITUMINOUS MATERIAL 423.000 GA 0040 604-50(18) CORRUGATED POLYETHYLENE PIPE 85.000 LF 0045 607-07 W BEAM GUARDRAIL BRIDGE TRANSITION 37.500 EA 0050 607-65 FLARED END TERMINAL 2.000 EA 0055 636-07 ERADICATION OF PAVEMENT MARKINGS 1,200.000 LF 0060 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 1,200.000 LF 0065 636-11 TRAFFIC CONTROL DEVICES 8,110.000 UN 0070 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 28.000 EA 0075 636-14 FLAGGER 480.000 HR 0080 636-17 TEMPORARY CONCRETE BARRIERS 1,170.000 LF 0085 636-21 ELECTRIC ARROW 45.000 DA 0090 636-25(B) WARNING LIGHTS 600.000 DA 0095 638-02 RIGHT OF WAY MARKERS 4.000 EA 0100 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0105 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 1 STATE PROJECT PAGE 23 Call Order : 011 CONTRACT ID : 9834101 Letting Date : 02/15/00 10:00 A.M. PROJECTS : U319-0024/00-000.00 00 COUNTIES : JEFFERSON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WIDENING 0110 663-01-1(II)W EDGE LINE, WHITE 1,288.000 LF 0115 663-01-1(II)Y EDGE LINE, YELLOW 563.000 LF 0120 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 650.000 LF 0125 663-03-1(II) BARRIER LINES 615.000 LF 0130 663-04(V) TYPE V CHANNELIZING LINES 360.000 LF 0135 663-05(V) TYPE V, STOP LINES 49.000 LF 0140 663-10(V) TYPE V, LANE ARROWS 6.000 EA 0145 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 379.000 TN AA1 0150 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 399.000 TN AA2 0155 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 265.000 TN BB1 0160 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 279.000 TN BB2 0165 401-03S HOT-LAID ASPHALT PATCH & LEVEL COURSE, SLAG 14.000 TN CC1 2 IN THICKNESS MAXIMUM 0170 401-03SG HOT-LAID ASPHALT PATCH & LEVEL COURSE, STONE OR GRAVEL 15.000 TN CC2 2 IN THICKNESS MAXIMUM 0175 402-01(1)S HMA SKID PVT, (W-1) SLAG 222.000 TN DD1 0180 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 234.000 TN DD2 1 FEDERAL PROJECT PAGE 24 Call Order : 012 CONTRACT ID : 9933471 Letting Date : 02/15/00 10:00 A.M. PROJECTS : X354-00D0/00-007.00 08 0APD 0282 122 C00 COUNTIES : WOOD DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 03/01/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202-01 BUILDING DEMOLITION LUMP LUMP 0015 202-01 BUILDING DEMOLITION LUMP LUMP 0020 204-01 MOBILIZATION LUMP LUMP 0025 207-01 UNCLASSIFIED EXCAVATION 214,218.000 CY 0030 207-02 SUBGRADE 955.000 CY 0035 207-34 FABRIC FOR SEPARATION 9,877.000 SY 0040 211-02 ROCK BORROW EXCAVATION 55,354.000 CY 0045 307-01 CLASS 1 AGGREGATE BASE COURSE 3,710.000 CY 0050 308-01 CLASS 1 AGGREGATE BASE COURSE 1,645.000 TN 0055 409-02 BITUMINOUS MATERIAL 3,150.000 GA 0060 501-01(6I) REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT 460.000 SY 0070 605-09 TYPE G INLET 4.000 EA 0075 606-25(4) UNDERDRAIN PIPE 27,295.000 LF 0076 606-30 OUTLET PIPE 4,070.000 LF 0080 607-01(I) TYPE 1 GUARDRAIL 1,140.000 LF 0085 607-66 TANGENT END TERMINAL 12.000 EA 0090 610-03(I) COMBINATION CONCRETE CURB AND GUTTER 600.000 LF 0095 617-02 FERROUS METAL RAILING 70.000 LF 0100 633-03 DUMPED ROCK GUTTER 906.000 CY 0101 636-11 TRAFFIC CONTROL DEVICES 2,622.000 UN 1 FEDERAL PROJECT PAGE 25 Call Order : 012 CONTRACT ID : 9933471 Letting Date : 02/15/00 10:00 A.M. PROJECTS : X354-00D0/00-007.00 08 0APD 0282 122 C00 COUNTIES : WOOD DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 03/01/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0102 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 1.000 EA 0103 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 12.000 EA 0104 637-01 WATER FOR DUST PALLIATIVE 436.000 MG 0105 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0110 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0115 640-03 BUILDING EQUIPMENT LUMP LUMP 0120 642-01 TEMPORARY BERMS 3,000.000 LF 0125 642-02 SLOPE DRAINS 500.000 LF 0130 642-03-1 DITCH CHECKS 52.000 EA 0135 642-03-2 CHECK DAMS 1.000 EA 0140 642-03-7 SEDIMENT POND 6,416.000 CY 0145 642-04-1 TEMPORARY SEED 3,892.000 LB 0150 642-05-1 STRAW OR HAY MULCH 80.000 TN 0155 642-06 FERTILIZER 16.000 TN 0160 642-08 TEMPORARY PIPE 800.000 LF 0165 642-10 AGRICULTURAL LIMESTONE 60.000 TN 0170 642-11 HAY OR STRAW BALES 200.000 EA 0175 642-12 SILT FENCE 9,300.000 LF 0180 651-02 PLACING STOCKPILED TOPSOIL 31,000.000 CY 0185 652-01 AGRICULTURAL LIMESTONE 30.000 TN 0190 652-02-1 FERTILIZER, 10-20-10 15.000 TN 1 FEDERAL PROJECT PAGE 26 Call Order : 012 CONTRACT ID : 9933471 Letting Date : 02/15/00 10:00 A.M. PROJECTS : X354-00D0/00-007.00 08 0APD 0282 122 C00 COUNTIES : WOOD DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 03/01/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0195 652-03-1 SEED MIXTURES B, C-1 OR C-2 2,740.000 LB 0200 652-03-2 SEED MIXTURES D 168.000 LB 0205 652-04-1 STRAW OR HAY MULCH 60.000 TN 0210 654-01 DECIDUOUS TREES 32.000 EA 0215 654-01 DECIDUOUS TREES 33.000 EA 0220 654-01 DECIDUOUS TREES 33.000 EA 0222 654-01 DECIDUOUS TREES 8.000 EA 0225 654-01 DECIDUOUS TREES 27.000 EA 0230 654-01 DECIDUOUS TREES 8.000 EA 0240 654-05 EVERGREEN TREES 4.000 EA 0245 654-05 EVERGREEN TREES 2.000 EA 0250 654-05 EVERGREEN TREES 9.000 EA 0255 654-05 EVERGREEN TREES 7.000 EA 0260 657-10 (3.00LB) CHANNEL POSTS 136.000 LF 0265 661-01(1) (0.080),FLAT SHEET SIGNS 35.000 SF 0267 662-03(01) POLYVINYLCHLORIDE CONDUIT ( 1.00 ) LUMP 0268 662-03(02) POLYVINYLCHLORIDE CONDUIT ( 1.00 ) LUMP 0269 662-03(03) POLYVINYLCHLORIDE CONDUIT ( 1.00 ) LUMP 0270 681-01 ASBESTOS ABATEMENT LUMP LUMP 0280 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,003.000 TN AA1 0285 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 957.000 TN AA2 1 FEDERAL PROJECT PAGE 27 Call Order : 012 CONTRACT ID : 9933471 Letting Date : 02/15/00 10:00 A.M. PROJECTS : X354-00D0/00-007.00 08 0APD 0282 122 C00 COUNTIES : WOOD DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 03/01/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0286 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 287.000 TN AB1 0287 402-01(1)S HMA SKID PVT, (W-1) SLAG 275.000 TN AB2 0290 604-01(60)A2 METALLIC COATED CORRUGATED STEEL PIPE 45.000 LF BB1 0291 604-09(60) END SECION FOR CORRUGATED STEEL PIPE 2.000 EA BB1 0295 604-37(60)IV REINFORCED CONCRETE PIPE 45.000 LF BB2 0296 604-38(60) REINFORCED CONCRETE END SECTION FOR ROUND CONCRETE PIPE 2.000 EA BB2 0300 604-76(60)A2 ALUMINUM COATED CORRUGATED STEEL PIPE 45.000 LF BB3 0301 604-09(60) END SECION FOR CORRUGATED STEEL PIPE 2.000 EA BB3 0305 604-01(36)A2 METALLIC COATED CORRUGATED STEEL PIPE 680.000 LF CC1 0310 604-09(36) END SECION FOR CORRUGATED STEEL PIPE 1.000 EA CC1 0315 604-37(36)IV REINFORCED CONCRETE PIPE 680.000 LF CC2 0320 604-38(36) REINFORCED CONCRETE END SECTION FOR ROUND CONCRETE PIPE 1.000 EA CC2 0325 604-76(36)A2 ALUMINUM COATED CORRUGATED STEEL PIPE 680.000 LF CC3 0330 604-09(36) END SECION FOR CORRUGATED STEEL PIPE 1.000 EA CC3 0335 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 735.000 LF DD1 0340 604-37(24)IV REINFORCED CONCRETE PIPE 735.000 LF DD2 0345 604-76(24)A2 ALUMINUM COATED CORRUGATED STEEL PIPE 735.000 LF DD3 0350 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 430.000 LF EE1 0355 604-09(18) END SECION FOR CORRUGATED STEEL PIPE 6.000 EA EE1 0360 604-72(18) SAFETY SLOPE END SECTION FOR CSP 2.000 EA EE1 0365 604-37(18)IV REINFORCED CONCRETE PIPE 430.000 LF EE2 1 FEDERAL PROJECT PAGE 28 Call Order : 012 CONTRACT ID : 9933471 Letting Date : 02/15/00 10:00 A.M. PROJECTS : X354-00D0/00-007.00 08 0APD 0282 122 C00 COUNTIES : WOOD DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 03/01/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0370 604-38(18) REINFORCED CONCRETE END SECTION FOR ROUND CONCRETE PIPE 6.000 EA EE2 0375 604-71(18) SAFETY SLOPE END SECTION FOR RCP 2.000 EA EE2 0380 604-76(18)A2 ALUMINUM COATED CORRUGATED STEEL PIPE 430.000 LF EE3 0385 604-09(18) END SECION FOR CORRUGATED STEEL PIPE 6.000 EA EE3 0390 604-72(18) SAFETY SLOPE END SECTION FOR CSP 2.000 EA EE3 SECTION NO. 0002 BUILDING & RECREATIONAL FACILITIES 0394 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0395 672-19 CONCESSION STAND ( 1.00 ) LUMP 0400 672-20 MAINTENANCE BUILDING ( 1.00 ) LUMP 0405 672-21 PRESS BOX 2.000 EA 0415 672-22 REST ROOM FACILITIES 2.000 EA 0425 672-23(4) 4 FT HEIGHT CHAINLINK FENCE 1,815.000 LF 0430 672-23(6) 6 FT HEIGHT CHAINLINK FENCE 7,672.000 LF 0435 672-23(8) 8 FT HEIGHT CHAINLINK FENCE 1,832.000 LF 0440 672-23(10) 10 FT HEIGHT CHAINLINK FENCE 2,595.000 LF 0450 672-23(16) 16 FT HEIGHT CHAINLINK FENCE 1,076.000 LF 0455 672-23(20) 20 FT HEIGHT CHAINLINK FENCE 163.000 LF 0460 672-24(16) 16 FT HEIGHT SAFETY FENCE/NETTING 1,285.000 LF 0465 672-25(4) 4 FT HEIGHT DOUBLE GATE 2.000 EA 0470 672-25(6) 6 FT HEIGHT DOUBLE GATE 13.000 EA 0475 672-26(4) 4 FT HEIGHT MAN GATE 4.000 EA 1 FEDERAL PROJECT PAGE 29 Call Order : 012 CONTRACT ID : 9933471 Letting Date : 02/15/00 10:00 A.M. PROJECTS : X354-00D0/00-007.00 08 0APD 0282 122 C00 COUNTIES : WOOD DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 03/01/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 BUILDING & RECREATIONAL FACILITIES 0480 672-26(7) 7 FT HEIGHT MAN GATE 26.000 EA 0485 672-27 SCOREBOARD - SOFTBALL FIELD ( 1.00 ) LUMP 0490 672-28 SCOREBOARD - FOOTBALL FIELD ( 1.00 ) LUMP 0495 672-29(12) PORTABLE ALUMINUM BLEACHERS (12X5 ROW) 26.000 EA 0500 672-29(24) PORTABLE ALUMINUM BLEACHERS (24X5 ROW) 8.000 EA 0505 672-30 FOOTBALL GOAL POST 2.000 EA 0510 672-31 FLAGPOLE 1.000 EA 0515 672-32 PRECAST CONCRETE WHEELSTOPS 148.000 EA 0520 672-33 BOLLARD 16.000 EA 0525 672-34 ROPE FENCE 378.000 LF 0526 672-35 YARD HYDRANT 13.000 EA 0527 672-36 SOFTBALL FIELD LIGHTING ( 1.00 ) LUMP 0528 672-37 FOOTBALL FIELD LIGHTING ( 1.00 ) LUMP 0529 672-38 DUGOUTS 26.000 EA 0530 672-39 BASEBALL AND SOFTBALL SKINNED AREA 3,180.000 CY 0531 672-40 GAS SERVICE PIPING 960.000 LF 0532 672-41 HOME PLATE BASE 13.000 EA 0533 672-42 PITCHERS RUBBER 13.000 EA 0534 672-43 BASEBALL AND SOFTBALL IMPACT BASES (SET OF 3) 13.000 EA SECTION NO. 0003 WATERLINE 0535 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 FEDERAL PROJECT PAGE 30 Call Order : 012 CONTRACT ID : 9933471 Letting Date : 02/15/00 10:00 A.M. PROJECTS : X354-00D0/00-007.00 08 0APD 0282 122 C00 COUNTIES : WOOD DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 03/01/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0003 WATERLINE 0540 670-07(1)200 PLASTIC PIPE CLASS 200 2,725.000 LF 0545 670-07(2)200 PLASTIC PIPE, CLASS 200 2,866.000 LF 0550 670-09(2) GATE VALVE AND VALVE BOX 5.000 EA 0555 670-15(1) METERS 1.000 EA 0560 670-17 METER BOX 1.000 EA 0561 670-19 SPECIAL VALVE 1.000 EA SECTION NO. 0004 SEWER LINE RELOCATION 0565 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0570 675-07(4) PLASTIC SEWER PIPE 745.000 LF 0575 675-07(8) PLASTIC SEWER PIPE 287.000 LF 0580 675-14 MANHOLE COMPLETE, INCLUDING CASTINGS 2.000 EA 0585 675-16 SPECIAL MANHOLE COMPLETE, INCLUDING CASTINGS 2.000 EA 0590 675-18 ADJUSTING MANHOLE 5.000 EA SECTION NO. 0005 BOX CULVERT 0595 212-01 STRUCTURE EXCAVATION 640.000 CY 0600 212-05 SELECT MATERIAL FOR BACKFILLING 96.000 CY 0605 601-02 CLASS B CONCRETE 51.000 CY 0610 604-70(16X4) PRECAST CONCRETE BOX CULVERT 54.000 LF 0615 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP SECTION NO. 0006 COMPUTER SYSTEM 1 FEDERAL PROJECT PAGE 31 Call Order : 012 CONTRACT ID : 9933471 Letting Date : 02/15/00 10:00 A.M. PROJECTS : X354-00D0/00-007.00 08 0APD 0282 122 C00 COUNTIES : WOOD DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 03/01/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0006 COMPUTER SYSTEM 0620 640-04 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP SECTION NO. 0007 ON JOB TRAINING 0625 699 ON JOB TRAINING 1,000.000 HR 1 STATE PROJECT PAGE 32 Call Order : 013 CONTRACT ID : 9816892 Letting Date : 02/15/00 10:00 A.M. PROJECTS : U320-0015/00-013.80 00 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/00 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RELOCATION & RESURFACE 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 13,861.000 CY 0020 207-34 FABRIC FOR SEPARATION 3,629.000 SY 0025 218-03 GABIONS 37.000 CY 0030 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 113.000 LF 0035 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 124.000 LF 0040 636-11 TRAFFIC CONTROL DEVICES 7,935.000 UN 0045 636-14 FLAGGER 450.000 HR 0050 637-01 WATER FOR DUST PALLIATIVE 10.000 MG 0055 638-02 RIGHT OF WAY MARKERS 15.000 EA 0060 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0065 640A-1 MINIMAL FIELD OFFICE LUMP LUMP 0070 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0075 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 1,070.000 TN AA1 0080 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 985.000 TN AA2 1 FEDERAL PROJECT PAGE 33 Call Order : 014 CONTRACT ID : 9921800 Letting Date : 02/15/00 10:00 A.M. PROJECTS : U320-0043/00-001.28 00 STPG 0043 119 E00 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/01/00 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TRAFFIC SIGNAL 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-07 ERADICATION OF PAVEMENT MARKINGS 15.000 LF 0015 636-11 TRAFFIC CONTROL DEVICES 4,200.000 UN 0020 636-14 FLAGGER 80.000 HR 0025 660-01 SIGNAL CONTROLLERS LUMP LUMP 0030 660-02(LPS-C) TRAFFIC DETECTORS 6.000 EA 0035 660-03(V-12) SIGNAL SECTIONS 26.000 EA 0040 660-04(C1) SIGNAL SUPPORTS 2.000 EA 0045 660-04(C1L) SIGNAL SUPPORTS 2.000 EA 0050 660-05(H) JUNCTION BOXES, TYPE H 4.000 EA 0055 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0060 662-07(250)W LUMINAIRES 2.000 EA 0065 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0070 663-05(V) TYPE V, STOP LINES 75.000 LF 0075 663-07(V)W TYPE V, STRIPES, WHITE 120.000 LF 1 STATE PROJECT PAGE 34 Call Order : 015 CONTRACT ID : 9930802 Letting Date : 02/15/00 10:00 A.M. PROJECTS : U328-0052/25-000.43 00 COUNTIES : MERCER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/15/00 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TRAFFIC SIGNAL 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICES 4,800.000 UN 0015 636-14 FLAGGER 100.000 HR 0020 660-01 SIGNAL CONTROLLERS LUMP LUMP 0025 660-02(LPS-C) TRAFFIC DETECTORS 6.000 EA 0030 660-03(V-12) SIGNAL SECTIONS 23.000 EA 0035 660-04(C1)A SIGNAL SUPPORTS, INSTALLATION ONLY 4.000 EA 0040 660-05(H) JUNCTION BOXES, TYPE H 5.000 EA 0045 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0050 660-10(D2) PRIORITY CONTROL SYSTEM DETECTOR 1.000 EA 0055 662-07(250)W LUMINAIRES 2.000 EA 0060 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0065 663-05(V) TYPE V, STOP LINES 85.000 LF 1 FEDERAL PROJECT PAGE 35 Call Order : 016 CONTRACT ID : 9535354R1 Letting Date : 02/15/00 10:00 A.M. PROJECTS : S340-0064/00-043.79 00 00IM 0641 229 E00 COUNTIES : PUTNAM GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/00 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE NO. 2134.3 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 615-03 FABRICATED STRUCTURAL STEEL ( 1.00 ) LUMP 0020 615-11 REMOVE AND REPLACE RIVET OR BOLT 194.000 EA 0025 615-14(A) SEAL BUILT-UP TRUSS MEMBER SEAMS 25,000.000 LF 0030 636-11 TRAFFIC CONTROL DEVICES 9,212.000 UN 0035 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 2.000 EA 0040 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 20.000 EA 0045 636-14 FLAGGER 40.000 HR 0050 636-14B TRAFFIC DIRECTOR 160.000 HR 0055 636-21 ELECTRIC ARROW 20.000 DA 0060 636-22 CHANGABLE MESSAGE SIGN 30.000 DA 0065 636-25(B) WARNING LIGHTS 120.000 DA 0070 636-28 SHADOW VEHICLE 30.000 DA 0075 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP