1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- April 06, 2004 LETTING Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its office in Building Five, Room A-148, 1900 Kanawha Boulevard East, Charleston, West Virginia 25305-0430 until 10 A.M. April 06, 2004 and said proposals will be publicly opened and read immediately thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 0403701 G040-0HDQ/00-007.00 00 BUILDING CONSTRUCTION HURRICANE MAINTENANCE HEADQUARTERS 0.4 MI N CO 19 COUNTY: PUTNAM REMARKS : MANDATORY PRE-BID 3/19/04 10:00 AM D1 HDQ - PRE-QUAL WAIVED ------------------------------------------------------------------------------------------------------------------------------------ 002 0227641 X316-000H/00-100.40 06 0APD 0484 251 C00 CONST NEW/RELOC 4 LANE ROAD W/BRIDGE(S) CORRIDOR H: US220 - FORT RUN 0.16 MI W US 220 - 1.48 MI E US 220 COUNTY: HARDY BRIDGE : 10443 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 1 ; STRUCTURE STEEL: 359774 LBS BRIDGE : 10444 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 1 ; STRUCTURE STEEL: 238780 LBS BRIDGE : 10445 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 4 ; STRUCTURE STEEL: 1418000 LBS DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : MANDATORY PRE-BID TUESDAY 3/23/04 1:00 P.M. BLDG 5 RM A-122 ------------------------------------------------------------------------------------------------------------------------------------ 003 0310744 S306-0010/00-015.22 00 0STP 0010 120 E00 REHABILITATION-RESTORATION-RESURFACING HAL GREER BOULEVARD CO 46 TO 0.2 MI S WASHINGTON BLVD COUNTY: CABELL DBE GOAL: 1 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 004 0310741 S306-0060/00-011.00 00 0STP 0060 187 E00 REHABILITATION-RESTORATION-RESURFACING ALTERNATE 10 TO BARBOURSVILLE 0.06 MI E ALT WV 10 TO 0.2 MI E CO 60/5 COUNTY: CABELL DBE GOAL: 1 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 005 0326144 S317-0079/00-106.42 00 00IM 0793 138 E00 REHABILITATION-RESTORATION-RESURFACING JANE LEW TO LOST CREEK ROAD BEGIN: CO 3 OVERPASS END: CITY STREET & LOST CREEK OVERPASS COUNTY: HARRISON DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- April 06, 2004 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 006 0310146 S328-0011/00-008.64 00 0STP 0011 112 E00 REHABILITATION-RESTORATION-RESURFACING MONTCALM - MCCOMAS ROAD 0.01 MI N JCT WV 71 - 0.03 MI N JCT CR 13 COUNTY: MERCER DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 007 0309347 S331-0019/00-003.75 00 0STP 0019 253 E00 REHABILITATION-RESTORATION-RESURFACING LAUREL POINT ROAD BEGIN: JCT CO 41 END: JCT CO 43 COUNTY: MONONGALIA DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 008 *0310148 S341-0004/00-003.00 00 0STP 0004 034 E00 REHABILITATION-RESTORATION-RESURFACING PROSPERITY ROAD JCT CR 6 - JCT US 19 COUNTY: RALEIGH ------------------------------------------------------------------------------------------------------------------------------------ 009 0310048 S343-0047/00-013.92 00 0STP 0047 034 E00 REHABILITATION-RESTORATION-RESURFACING PARKERSBURG - SMITHVILLE ROAD 0.35 MI W CO 47/8 - 0.44 MI E WV 16 S COUNTY: RITCHIE DBE GOAL: 2 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 010 0309045 S352-0002/00-000.00 00 00NH 0002 393 E00 REHABILITATION-RESTORATION-RESURFACING PADEN CITY BEGIN: TYLER CO LINE END: 0.11 MI S CR 2/1 COUNTY: WETZEL DBE GOAL: 5 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 011 0309343 S352-0002/00-007.09 00 00NH 0002 397 E00 REHABILITATION-RESTORATION-RESURFACING NEW MARTINSVILLE BEGIN: 0.37 MI N JCT WV 7 END: 0.86 MI N JCT CR 2/9 COUNTY: WETZEL DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 012 0310142 S355-0054/00-000.05 00 0STP 0054 025 E00 REHABILITATION-RESTORATION-RESURFACING MULLENS - OTSEGO ROAD 0.06 MI N JCT WV 16 - 0.07 MI N JCT CR 54/7 COUNTY: WYOMING DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- April 06, 2004 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 013 0210854 S355-0097/00-005.47 00 0STP 0097 082 E00 REHABILITATION-RESTORATION-RESURFACING ROCKHOUSE BRANCH - BAILEYSVILLE ROAD 0.5 MI E JCT CR 97/22 - JCT CR 9/8 COUNTY: WYOMING DBE GOAL: 1 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 014 0332140 S309-0050/00-001.34 00 00NH 0050 217 E00 REHABILITATION-RESTORATION-RESURFACING MORGANS RUN TO ARNOLDS CREEK BEGIN: JCT CO 50/30 END: JCT CO 11 COUNTY: DODDRIDGE DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 015 0310141 S324-0083/00-013.08 00 00NH 0083 047 E00 REHABILITATION-RESTORATION-RESURFACING BARTLEY-YUKON ROAD JCT CR 83/1-0.53 MI W JCT WV 16 COUNTY: MCDOWELL DBE GOAL: 2 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 016 0309843 S340-0034/00-014.69 00 0STP 0034 054 E00 REHABILITATION-RESTORATION-RESURFACING TEAYS VALLEY TO WINFIELD CO 34/40 TO CO 13 COUNTY: PUTNAM DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 017 0210847 S302-0009/00-011.15 00 00NH 0009 156 E00 REHABILITATION-RESTORATION-RESURFACING EDWIN MILLER BLVD 0.24 MI W CO 11/24-WV 45 COUNTY: BERKELEY DBE GOAL: 2 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 018 *0400801 E320-0027/00-S11.03 00 00ER 1103 002 000 SLIDE REPAIR W/PILING EDENS FORK LANDSLIDE CORRECTION 0.01 MI E I-77 NB OFF RAMP COUNTY: KANAWHA ------------------------------------------------------------------------------------------------------------------------------------ 019 0326143 S321-0079/00-102.32 00 00IM 0792 127 E00 REHABILITATION-RESTORATION-RESURFACING WESTON TO JANE LEW ROAD BEGIN: JCT CO 14/1 OVERPASS END: CO 3 OVERPASS COUNTY: LEWIS DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- April 06, 2004 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 020 *0334441 E323-0119/90-Q06.03 00 00ER 0603 009 E00 SLIDE REPAIR W/PILING OLD LOGAN ROAD 0.36 MI W WV 10 TO 1.7 MI E US 119 COUNTY: LOGAN ------------------------------------------------------------------------------------------------------------------------------------ 021 0333945 E324-0003/00-S11.03 00 00ER 1103 006 E00 SLIDE REPAIR W/PILING GREENBRIER SLIPS 0.15 MI N JCT CR 1/2-0.10 MI N JCT CR 1/2 COUNTY: MCDOWELL ------------------------------------------------------------------------------------------------------------------------------------ 022 *0333946 E324-0003/06-S11.03 00 FEMA 1500 000 000 SLIDE REPAIR W/PILING GREENBRIER FORK SLIP 0.30 MI S JCT CR 3 - 0.34 MI S JCT CR 3 COUNTY: MCDOWELL ------------------------------------------------------------------------------------------------------------------------------------ 023 *0333944 E324-0052/01-S11.03 00 FEMA 1500 000 000 SLIDE REPAIR W/PILING RODERFIELD SLIP 1.30 MI W JCT CR 7 - 1.28 MI W JCT CR 7 COUNTY: MCDOWELL ------------------------------------------------------------------------------------------------------------------------------------ 024 *0404102 E325-0250/00-003.40 02 DRAINAGE IMPROVEMENTS SOUTH FAIRMONT ROAD 0.02 MILES NORTH OF I-79 COUNTY: MARION ------------------------------------------------------------------------------------------------------------------------------------ 025 0311843 S328-0077/00-005.48 00 00IM 0771 049 E00 REHABILITATION-RESTORATION-RESURFACING INGLESIDE - PRINCETON ROAD 0.37 MI N JCT WV 112-0.09 MI S JCT US 460 COUNTY: MERCER DBE GOAL: 2 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 026 *0402742 E345-0007/06-P02.03 00 FEMA 1455 000 000 SLIDE REPAIR W/PILING KEENEY'S MOUNTAIN ROAD BEGIN: MP0.625 END: MP 0.645 COUNTY: SUMMERS ------------------------------------------------------------------------------------------------------------------------------------ 027 *0402840 E345-0010/00-S11.03 00 FEMA 1500 000 0 SLIDE REPAIR W/PILING BIG CREEK ROAD BEGIN: 0.84 MI N CO 13 END: 0.86 MI N CO 13 COUNTY: SUMMERS ------------------------------------------------------------------------------------------------------------------------------------ 028 *0403340 E345-0020/00-S11.03 03 00ER 1103 004 RESURFACING SANDSTONE - GREEN SULPHUR ROAD BEGIN: 0.31 MI N CR 7 END: 0.66 MI N CR 7 COUNTY: SUMMERS ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- April 06, 2004 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 029 *0323040 U350-0152/00-030.81 02 0NFA 0152 035 000 DRAINAGE IMPROVEMENTS HUNTINGTON - WAYNE ROAD I/S WV 152 & CR 52/61 COUNTY: WAYNE ------------------------------------------------------------------------------------------------------------------------------------ 030 0314141 S354-0077/00-165.18 00 00IM 0773 359 E00 REHABILITATION-RESTORATION-RESURFACING SAULSBURY - MINERALWELLS ROAD OVERPASS CR 21/24 - MINERALWELLS NB OFFRAMP COUNTY: WOOD DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 031 0333947 E355-0010/00-S11.03 00 00ER 1103 005 E00 SLIDE REPAIR W/PILING CAMPUS SLIP 0.63 MI W JCT CR 10/2 - 0.71 MI W JCT CR 10/2 COUNTY: WYOMING ------------------------------------------------------------------------------------------------------------------------------------ 032 *0333942 E355-0014/00-S11.03 00 00ER 1103 005 E00 SLIDE REPAIR W/PILING BRIAR CREEK 0.60 MI S JCT CR 12/4 - 0.70 MI S JCT CR 12/4 COUNTY: WYOMING ------------------------------------------------------------------------------------------------------------------------------------ 033 *0333948 E355-0085/00-S11.03 00 00ER 1103 005 E00 SLIDE REPAIR W/PILING TONEY FORK SLIP 0.70 MI W JCT CR 2 - 0.51 MI W JCT CR 2 COUNTY: WYOMING ------------------------------------------------------------------------------------------------------------------------------------ 034 0326145 S317-0079/00-114.00 00 00IM 0793 194 E00 REHABILITATION-RESTORATION-RESURFACING QUIET DELL TO ANMOORE ROAD BEGIN: 0.18 MI S CO 20/17 OVERPASS END: ANMOORE CORP. LINE COUNTY: HARRISON DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 035 0311351 S320-0060/00-025.71 00 0STP 0060 189 E00 REHABILITATION-RESTORATION-RESURFACING BURNING SPRINGS - BELLE ROAD CO 60/13 - 0.32 MI W CO 60/17 0P COUNTY: KANAWHA DBE GOAL: 2 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 036 0310145 S324-0016/00-014.29 00 0STP 0016 158 E00 REHABILITATION-RESTORATION-RESURFACING WAR - CARETTA ROAD 0.02 MI N JCT CR 12/4 - JCT CR 16/1 COUNTY: MCDOWELL DBE GOAL: 4 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- April 06, 2004 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 037 0403645 S335-0070/00-005.79 00 00IM 0701 142 E00 REHABILITATION-RESTORATION-RESURFACING TRIADELPHIA - PA STATE LINE BEGIN: 0.47 MI E JCT US 40 END: PA STATE LINE COUNTY: OHIO DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 038 0332940 S335-0088/00-001.06 00 0STP 0088 028 E00 REHABILITATION-RESTORATION-RESURFACING BETHLEHEM - TRIADELPHIA ROAD BEGIN: CR 91/1, JCT I-470 E.B. OFF-RAMP END: WV88, JCT US 40 COUNTY: OHIO DBE GOAL: 5 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 039 0310044 S344-0119/00-010.52 00 0STP 0119 164 E00 REHABILITATION-RESTORATION-RESURFACING WALTON - SPEED ROAD JCT CR 21 - 0.14 MI N CR 119/3 COUNTY: ROANE DBE GOAL: 7 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 040 *0300712 S316-0005/00-000.00 00 RESURFACING NORTH MOUNTAIN ROAD WV 55-0.80 MI E CO 5/1 COUNTY: HARDY ------------------------------------------------------------------------------------------------------------------------------------ 041 *0300711 S319-0034/00-000.00 00 RESURFACING JEFFERSON AVENUE WV 115-WV 51 COUNTY: JEFFERSON ------------------------------------------------------------------------------------------------------------------------------------ 042 *0336302 S323-0010/00-008.60 00 RESURFACING MAN TO LOGAN ROAD MAN TO LOGAN ROAD COUNTY: LOGAN ------------------------------------------------------------------------------------------------------------------------------------ 043 0400614 S325-0048/00-000.00 00 RESURFACING BINGAMON ROAD BEGIN: JCT CO 11 END JCT US 19 COUNTY: MARION ------------------------------------------------------------------------------------------------------------------------------------ 044 *0336318 S330-0001/00-008.22 00 RESURFACING EAST FORK TWELVEPOLE ROAD 2.0 MI. S. CO 3/1 TO CO 3/1 COUNTY: MINGO ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- April 06, 2004 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 045 *0400811 S332-0007/04-001.89 00 RESURFACING WAYSIDE - SARTON ROAD BEGIN:1.89 MI E CR 7 END:0.02 MI E CR 23/4 COUNTY: MONROE ------------------------------------------------------------------------------------------------------------------------------------ 046 0336502 S340-0062/00-017.54 00 RESURFACING BUFFALO TO MASON COUNTY LINE 0.14 MI S WV 869 TO MASON COUNTY LINE COUNTY: PUTNAM ------------------------------------------------------------------------------------------------------------------------------------ 047 *0301536 S341-0003/28-000.00 00 RESURFACING DINGESS BRANCH ROAD JCT. WV 3 - JCT. CR 16/1 COUNTY: RALEIGH ------------------------------------------------------------------------------------------------------------------------------------ 048 0400803 S342-0039/00-003.14 00 RESURFACING BACK ROAD 0.34 MI S CR 39/1 - CR 38 COUNTY: RANDOLPH ------------------------------------------------------------------------------------------------------------------------------------ 049 0400828 S345-0N20/00-014.59 00 RESURFACING HINTON ROAD BEGIN:0.06 MI S WV 107 END: WV 20 SOUTHBOUND COUNTY: SUMMERS ------------------------------------------------------------------------------------------------------------------------------------ 050 0400521 S354-0031/00-004.99 00 RESURFACING WILLIAMSTOWN - DEERWALK ROAD BEGIN: JCT CR 3/12 END: JCT CR 2/23 COUNTY: WOOD ------------------------------------------------------------------------------------------------------------------------------------ 051 *0019241R1 U320-0622/00-000.00 02 0CMA 0622 015 E00 UPGRADE & WIDEN PAVEMENT GOFF MTN RD RT LANE +1 / ADD RT LN ADD LEFT LN I/S WV 622 & WV 35 COUNTY: KANAWHA CONTRACT: 0010241 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of total bid, whichever is greater. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained at the Charleston office. The right is reserved to reject any or all proposals. *These are projects on which any contractor with a Category "W" Prequalification Rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals on all projects will be furnished at twenty-five dollars ($25.00) per set. Extra plans will be furnished at fifteen dollars ($15.00) per set and extra proposals will be furnished at ten dollars ($10.00) per proposal. Cross sections will be furnished at fifty dollars ($50.00) per set. All will be furnished without refund and transmitted at your risk. The above noted project information will be available in the Contract Unit, Construction Section, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305 and may also be ordered by calling (304)558-2874. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national orign in consideration for an award. No proposals for these projects will be issued after 3:00 P.M. on the day prior to the letting. It is necessary to advise your approximate uncompleted workload when ordering plans and proposals. Announcement, opening and reading of bids received will be in the order as designated in the "Notice to Contractors". Sealed proposals may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9 A.M. and 10 A.M., the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division Of Highways John E. Lewis, Jr., Assistant Secretary for Program Administration 1 1 STATE PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 0403701 Letting Date : 04/06/04 10:00 A.M. PROJECTS : G040-0HDQ/00-007.00 00 COUNTIES : PUTNAM GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/04 RES. ENG.: RICHARD GENTHNER DESCRIPTION: HURRICANE MAINTENANCE HEADQUARTERS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 HURRICANE MAINTENANCE HDQS. 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 628.000 CY 0015 207034-000 FABRIC FOR SEPARATION 3,400.000 SY 0020 211001-000 UNCLASSIFIED BORROW EXCAVATION 207.000 CY 0025 601002-001 CLASS B CONCRETE 12.000 CY 0030 604050-012 15 INCH CORRUGATED POLYETHYLENE PIPE 148.000 LF 0035 604050-016 18 INCH CORRUGATED POLYETHYLENE PIPE 381.000 LF 0040 605009-001 TYPE G INLET 7.000 EA 0045 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0050 640006-001 SMALL FIELD OFFICE 6.000 MO 0055 642004-001 SEED MIXTURE, TEMPORARY 50.000 LB 0060 642005-001 MULCH, STRAW OR HAY 0.200 TN 0065 642006-001 FERTILIZER 0.200 TN 0070 642012-001 SILT FENCE 600.000 LF 0075 652001-001 AGRICULTURAL LIMESTONE 0.200 TN 0080 652003-001 SEED MIXTURES, B, C-1, OR C-2 50.000 LB 0085 652004-001 STRAW OR HAY MULCH 0.200 TN 0090 670008-120 2 INCH COPPER SERVICE PIPE 80.000 LF 0095 671001-120 2 INCH GAS LINE, 110.000 LF 0100 672001-001 CONSTRUCT OFFICE BUILDING 120' X 52' LUMP LUMP 1 STATE PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 0403701 Letting Date : 04/06/04 10:00 A.M. PROJECTS : G040-0HDQ/00-007.00 00 COUNTIES : PUTNAM GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/31/04 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 HURRICANE MAINTENANCE HDQS. 0105 675007-018 4 INCH PLASTIC SEWER PIPE 390.000 LF 0110 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS I 1,095.000 TN AA1 0115 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS I 1,007.000 TN AA2 0120 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 1 642.000 TN BB1 0125 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 1 591.000 TN BB2 0130 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 215.000 TN CC1 TYPE 1 0135 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 1 198.000 TN CC2 1 FEDERAL PROJECT PAGE 3 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202001-000 BUILDING DEMOLITION NUMBER, 35-1/1 ( 1.00 ) LUMP 0015 202001-000 BUILDING DEMOLITION NUMBER, 35-1/2 ( 1.00 ) LUMP 0020 202001-000 BUILDING DEMOLITION NUMBER, 35-2/1 ( 1.00 ) LUMP 0025 202001-000 BUILDING DEMOLITION NUMBER, 36-1/1 ( 1.00 ) LUMP 0030 202001-000 BUILDING DEMOLITION NUMBER, 41-1/1 ( 1.00 ) LUMP 0035 202001-000 BUILDING DEMOLITION NUMBER, 41-1/2 ( 1.00 ) LUMP 0040 202001-000 BUILDING DEMOLITION NUMBER, 41-1/3 ( 1.00 ) LUMP 0045 202001-000 BUILDING DEMOLITION NUMBER, 41-A/1 ( 1.00 ) LUMP 0050 202002-000 WATER WELL ABANDONMENT NUMBER, 35-1/4 LUMP LUMP 0055 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 35-1/3 LUMP LUMP 0060 204001-000 MOBILIZATION LUMP LUMP 0065 207001-001 UNCLASSIFIED EXCAVATION 1,716,784.000 CY 0070 207002-000 SUBGRADE 20,263.000 CY 0075 207034-000 FABRIC FOR SEPARATION 164,514.000 SY 0080 208001-000 STORAGE TANK REMOVAL 3.000 EA 0085 208002-000 BACKFILLING UNDERGROUND STORAGE TANK 3.000 EA 0090 211002-000 ROCK BORROW EXCAVATION 20,920.000 CY 0092 212001-000 STRUCTURE EXCAVATION 300.000 CY 0093 212002-000 WET EXCAVATION 610.000 CY 0100 307001-000 AGGREGATE BASE COURSE, CLASS 1 8,262.000 CY 1 FEDERAL PROJECT PAGE 4 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0103 307001-000 AGGREGATE BASE COURSE, CLASS 8 13.000 CY 0105 307001-000 AGGREGATE BASE COURSE, CLASS 10 1,162.000 CY 0110 311006-001 OPEN GRADED FREE DRAINING BASE COURSE 13,630.000 CY 0115 408002-001 BITUMINOUS MATERIAL 321.000 GA 0116 415005-001 REMOVE EXISTING PAVEMENT SURFACE 75.000 SY 0118 501010-001 BRIDGE APPROACH EXPANSION JOINT (MODIFIED) 2.000 EA 0119 501010-001 BRIDGE APPROACH EXPANSION JOINT 4.000 EA 0120 502001-012 12 INCH PORTLAND CEMENT CONCRETE APPROACH SLAB 1,203.000 SY 0125 601002-001 CLASS B CONCRETE 149.000 CY 0127 602001-001 REINFORCING STEEL BAR 2,300.000 LB 0130 604012-057 66X51 INCH HALF BITUMINOUS COATED AND PAVED INVERT 160.000 LF CORRUGATED STEEL PIPE ARCH, C5 0135 604016-057 66X51 INCH CORRUGATED METAL PIPE ARCH END SECTION 2.000 EA 0140 604020-099 152X97 INCH STRUCTURAL PLATE PIPE ARCH, D6 88.000 LF 0145 605001-001 TYPE A MANHOLE 1.000 EA 0150 605004-001 TYPE B INLET 16.000 EA 0155 605009-001 TYPE G INLET 32.000 EA 0165 606029-001 FREE DRAINING BASE TRENCH 27,212.000 LF 0170 606030-001 OUTLET PIPE, 4,865.000 LF 0175 607001-001 TYPE 1 GUARDRAIL, CLASS I 4,975.000 LF 0180 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 12.000 EA 0185 607030-001 SPECIAL TRAILING END TERMINAL 5.000 EA 1 FEDERAL PROJECT PAGE 5 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0190 607065-001 FLARED END TERMINAL 7.000 EA 0194 608001-004 5 FT RIGHT-OF-WAY FENCE, CHAIN LINK 4,149.000 LF 0195 608002-001 3 FT X 11 IN RIGHT-OF-WAY FENCE, FARM FIELD 16,025.000 LF 0200 609001-001 CONCRETE SIDEWALK 843.000 SY 0205 609002-001 BED COURSE MATERIAL 94.000 CY 0210 610001-002 PLAIN CONCRETE CURBING, TYPE II 6,668.000 LF 0213 610005-001 BITUMINOUS CURB, TYPE I 239.000 LF 0215 610006-005 MEDIAN, TYPE V 5,150.000 LF 0220 633003-001 DUMPED ROCK GUTTER 39.000 CY 0222 636005-001 TEMPORARY STRUCTURE FOR MAINTAINING TRAFFIC ( 1.00 ) LUMP 0225 636007-001 ERADICATION OF PAVEMENT MARKING 1,500.000 LF 0230 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 36,000.000 LF 0235 636011-001 TRAFFIC CONTROL DEVICE 9,340.000 UN 0240 636012-010 PROJECT TRAFFIC CONTROL DEVICE CLEANING 2.000 EA 0245 636013-001 INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING 60.000 EA 0250 636014-001 FLAGGER 3,000.000 HR 0255 636017-001 TEMPORARY CONCRETE BARRIER 1,250.000 LF 0260 636022-001 CHANGAEBLE MESSAGE SIGN 360.000 DA 0265 636025-001 WARNING LIGHTS, TYPE B 1,080.000 DA 0270 636025-001 WARNING LIGHTS, TYPE C 2,700.000 DA 0275 637001-001 WATER FOR DUST PALLIATIVE 3,453.000 MG 1 FEDERAL PROJECT PAGE 6 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0280 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0285 640002-001 LARGE FIELD OFFICE AND STORAGE BUILDING 30.000 MO 0290 640003-001 BUILDING EQUIPMENT LUMP LUMP 0300 642001-001 TEMPORARY BERM 9,300.000 LF 0305 642002-001 SLOPE DRAIN 350.000 LF 0310 642004-001 SEED MIXTURE, TEMPORARY 7,166.000 LB 0315 642004-002 SEED MIXTURE, B 2,962.000 LB 0320 642004-003 SEED MIXTURE, D 4,204.000 LB 0325 642005-001 MULCH, STRAW OR HAY 256.000 TN 0330 642006-001 FERTILIZER 51.000 TN 0335 642009-001 CONTOUR DITCH 17,200.000 LF 0340 642010-001 AGRICULTURAL LIMESTONE 192.000 TN 0345 642011-001 HAY OR STRAW BALE 1,433.000 EA 0350 642012-001 SILT FENCE 2,400.000 LF 0355 642015-001 SUPER SILT FENCE 3,064.000 LF 0360 642031-001 DITCH CHECK 197.000 EA 0365 642033-001 SEDIMENT TRAP 1,600.000 CY 0370 642042-001 FLOCCULANT BLOCK, 9.000 EA 0375 642043-001 PREMANUFACTURED DITCH CHECK, 12.000 EA 0380 652001-001 AGRICULTURAL LIMESTONE 35.000 TN 0385 652002-001 FERTILIZER, 10-20-10 35.000 TN 1 FEDERAL PROJECT PAGE 7 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0390 652003-001 SEED MIXTURES, B, C-1, OR C-2 3,747.000 LB 0395 652003-002 SEED MIXTURE, D 3,449.000 LB 0400 652004-001 STRAW OR HAY MULCH 462.000 TN 0405 655001-001 MATTING 23,524.000 SY 0410 655002-001 PERMANENT EROSION MATTING, TYPE A 3,184.000 SY 0415 664001-008 IMPACT ATTENUATING DEVICE, TYPE IV 2.000 EA 0420 665004-001 WATER WELL SURVEY 1.000 EA 0425 401001-011 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, 16,696.000 TN AA1 TYPE 19 0430 401001-012 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 19 15,193.000 TN AA2 0435 401001-011 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, 61,249.000 TN BB1 TYPE 37.5 0440 401001-012 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 37.5 55,737.000 TN BB2 0445 402001-011 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 10,668.000 TN CC1 GRAVEL, TYPE 9.5 0450 402001-012 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, 9,708.000 TN CC2 SLAG, TYPE 9.5 0455 604076-016 18 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 422.000 LF DD1 0460 604009-016 18 INCH CORRUGATED STEEL PIPE END SECTION 3.000 EA DD1 0465 604025-016 18 INCH CORRUGATED ALUMINUM ALLOY PIPE, A7 422.000 LF DD2 0470 604028-016 18 INCH CORRUGATED ALUMINUM ALLOY PIPE END SECTION, 3.000 EA DD2 0475 604076-016 18 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 1,461.000 LF EE1 0480 604009-016 18 INCH CORRUGATED STEEL PIPE END SECTION 2.000 EA EE1 0485 604025-016 18 INCH CORRUGATED ALUMINUM ALLOY PIPE, A7 1,461.000 LF EE2 0490 604028-016 18 INCH CORRUGATED ALUMINUM ALLOY PIPE END SECTION, 2.000 EA EE2 1 FEDERAL PROJECT PAGE 8 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0495 604037-016 18 INCH REINFORCED CONCRETE PIPE, CLASS II 1,461.000 LF EE3 0500 604038-016 18 INCH REINFORCED CONCRETE PIPE END SECTION 2.000 EA EE3 0505 604076-016 18 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 28.000 LF FF1 0510 604072-116 18 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 2.000 EA FF1 0515 604037-016 18 INCH REINFORCED CONCRETE PIPE, CLASS II 28.000 LF FF2 0520 604071-016 18 INCH REINFORCED CONCRETE PIPE SAFETY SLOPE END SECTION 2.000 EA FF2 0525 604076-020 24 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 1,436.000 LF GG1 0530 604009-020 24 INCH CORRUGATED STEEL PIPE END SECTION 4.000 EA GG1 0535 604025-020 24 INCH CORRUGATED ALUMINUM ALLOY PIPE, A7 1,436.000 LF GG2 0540 604028-020 24 INCH CORRUGATED ALUMINUM ALLOY PIPE END SECTION, 4.000 EA GG2 0545 604076-020 24 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 1,318.000 LF HH1 0550 604009-020 24 INCH CORRUGATED STEEL PIPE END SECTION 5.000 EA HH1 0555 604025-020 24 INCH CORRUGATED ALUMINUM ALLOY PIPE, A7 1,318.000 LF HH2 0560 604028-020 24 INCH CORRUGATED ALUMINUM ALLOY PIPE END SECTION, 5.000 EA HH2 0565 604037-020 24 INCH REINFORCED CONCRETE PIPE, CLASS II 1,318.000 LF HH3 0566 604038-020 24 INCH REINFORCED CONCRETE PIPE END SECTION 5.000 EA HH3 0570 604076-020 24 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 181.000 LF JJ1 0575 604072-120 24 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 3.000 EA JJ1 0580 604037-020 24 INCH REINFORCED CONCRETE PIPE, CLASS II 181.000 LF JJ2 0585 604071-020 24 INCH REINFORCED CONCRETE PIPE SAFETY SLOPE END SECTION 3.000 EA JJ2 0590 604025-022 30 INCH CORRUGATED ALUMINUM ALLOY PIPE, B2 180.000 LF KK1 1 FEDERAL PROJECT PAGE 9 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0595 604037-022 30 INCH REINFORCED CONCRETE PIPE, CLASS II 180.000 LF KK2 0600 604002-022 30 INCH FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, A2 175.000 LF LL1 0605 604025-022 30 INCH CORRUGATED ALUMINUM ALLOY PIPE, B2 175.000 LF LL2 0610 604037-022 30 INCH REINFORCED CONCRETE PIPE, CLASS II 175.000 LF LL3 0615 604025-024 36 INCH CORRUGATED ALUMINUM ALLOY PIPE, B2 246.000 LF MM1 0620 604037-024 36 INCH REINFORCED CONCRETE PIPE, CLASS II 246.000 LF MM2 0625 604076-024 36 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 940.000 LF NN1 0630 604009-024 36 INCH CORRUGATED STEEL PIPE END SECTION 4.000 EA NN1 0635 604025-024 36 INCH CORRUGATED ALUMINUM ALLOY PIPE, B2 940.000 LF NN2 0640 604028-024 36 INCH CORRUGATED ALUMINUM ALLOY PIPE END SECTION, 4.000 EA NN2 0645 604025-026 42 INCH CORRUGATED ALUMINUM ALLOY PIPE, B7 769.000 LF PP1 0650 604037-026 42 INCH REINFORCED CONCRETE PIPE, CLASS II 769.000 LF PP2 0655 604025-028 48 INCH CORRUGATED ALUMINUM ALLOY PIPE, C7 625.000 LF QQ1 0660 604037-028 48 INCH REINFORCED CONCRETE PIPE, CLASS II 625.000 LF QQ2 0665 604076-036 72 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, B3 1,755.000 LF RR1 0670 604025-036 72 INCH CORRUGATED ALUMINUM ALLOY PIPE, D3 1,755.000 LF RR2 0675 636002-001 AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 1,488.000 TN SS1 0680 636002-002 AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 1,354.000 TN SS2 SECTION NO. 0002 SEDIMENT BASINS 0685 207001-001 UNCLASSIFIED EXCAVATION 2,702.000 CY 0690 207034-000 FABRIC FOR SEPARATION 2,410.000 SY 1 FEDERAL PROJECT PAGE 10 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 SEDIMENT BASINS 0695 211001-000 UNCLASSIFIED BORROW EXCAVATION 8,181.000 CY 0700 211008-000 ROCK BORROW EXCAVATION 5,177.000 TN 0705 211017-001 IMPERVIOUS CORE 6,400.000 SF 0710 604001-020 24 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 110.000 LF 0715 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0720 642035-001 RISER 3.000 EA 0725 642036-001 SEDIMENT REMOVAL 4,451.000 CY SECTION NO. 0003 SANITARY SEWER RELOCATION 0730 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0735 675007-022 8 INCH PLASTIC SEWER PIPE 985.000 LF 0740 675014-001 MANHOLE COMPLETE, INCLUDING CASTING 7.000 EA 0745 675015-001 DROP MANHOLE COMPLETE, INCLUDING CASTING 3.000 EA 0750 675021-320 18 INCH STEEL CASING PIPE, THICKNESS 0.375 INCH 129.000 LF SECTION NO. 0004 FORCE MAIN 0755 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0760 675007-018 4 INCH PLASTIC SEWER PIPE ,SDR21, 200PSI RATING, PUSH-ON JOINT 1,885.000 LF 0765 675025-001 SPECIAL STRUCTURE ,AIR RELEASE VALVE 1.000 EA SECTION NO. 0005 SIGNALS 0770 660001-001 SIGNAL CONTROLLER (01) LUMP LUMP 0775 660002-005 TRAFFIC DETECTOR, LPS-C 6.000 EA 1 FEDERAL PROJECT PAGE 11 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0005 SIGNALS 0780 660003-006 SIGNAL SECTION, V-12 22.000 EA 0785 660003-008 SIGNAL SECTION, V-8 6.000 EA 0790 660004-040 SIGNAL SUPPORT, C1 2.000 EA 0795 660004-042 SIGNAL SUPPORT, C1L 2.000 EA 0800 660005-010 JUNCTION BOX, TYPE H 4.000 EA 0805 660007-001 MISCELLANEOUS SIGNAL 01 LUMP LUMP SECTION NO. 0006 SIGNING & PAVEMENT MARKINGS 0810 657006-001 S4X7.7, A-441 SUPPORT, GALVANIZED 308.000 LF 0815 657006-005 W6X12, A-441 SUPPORT, GALVANIZED 149.000 LF 0820 657006-010 W8X18, A-441 SUPPORT, GALVANIZED 81.000 LF 0824 657008-001 2.00 LB CHANNEL POST 137.000 LF 0825 657010-001 3.00 LB CHANNEL POST 1,916.000 LF 0826 657012-001 4.00 LB BACK TO BACK CHANNEL POST 76.000 LF 0830 657017-001 CLASS B CONCRETE FOOTING, REINFORCED, ROADSIDE 16.500 CY 0835 661001-001 0.080 IN FLAT SHEET SIGN 1,331.000 SF 0840 661002-001 EXTRUDED PANEL SIGN 770.000 SF 0841 661004-001 DELINEATOR, REFLEX REFLECTOR, SINGLE, WHITE 7.000 EA 0842 661006-001 DELINEATOR, NINE PER UNIT, AMBER 16.000 UN 0843 661007-001 DELINEATOR, THREE PER UNIT, AMBER 8.000 UN 0844 661008-001 DELINEATOR BRACKET, TYPE A 2.000 EA 0845 661013-001 PLASTIC DELINEATOR POST, WHITE 133.000 EA 1 FEDERAL PROJECT PAGE 12 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0006 SIGNING & PAVEMENT MARKINGS 0846 663001-004 EDGE LINE, TYPE II WHITE 33,230.000 LF 0850 663001-004 EDGE LINE, TYPE II YELLOW 23,150.000 LF 0855 663002-005 LANE LINE OR CENTERLINE, TYPE II WHITE 4,785.000 LF 0860 663003-005 BARRIER LINE, TYPE II 6,710.000 LF 0865 663004-004 CHANNELIZING LINE, TYPE II 2,100.000 LF 0870 663005-010 STOP LINE, TYPE V (24") 293.000 LF 0875 663006-010 CROSSWALK LINE, TYPE V (6") 336.000 LF 0880 663007-010 STRIPE, TYPE V WHITE (24") 735.000 LF 0885 663007-010 STRIPE, TYPE V WHITE (12") 220.000 LF 0890 663007-010 STRIPE, TYPE V YELLOW (12") 3,137.000 LF 0895 663010-010 LANE ARROW, TYPE V 27.000 EA 0900 663011-010 LANE LETTER, TYPE V 36.000 EA 0901 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 226.000 EA SECTION NO. 0007 HIGHWAY LIGHTING 0905 662002-001 GALVANIZED STEEL CONDUIT 01 LUMP LUMP 0910 662006-001 JUNCTION BOX, TYPE A MODIFIED 5.000 EA 0915 662006-001 JUNCTION BOX, TYPE H, 18 INCH X 18 INCH 16.000 EA 0920 662007-001 LUMINAIRE, 250W 26.000 EA 0925 662008-001 CABLE, 01 ( 1.00 ) LUMP 0930 662010-001 LIGHTING SUPPORT, TYPE I, (40-10) 2.000 EA 0935 662010-001 LIGHTING SUPPORT, TYPE I, (40-15) 9.000 EA 1 FEDERAL PROJECT PAGE 13 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0007 HIGHWAY LIGHTING 0940 662010-001 LIGHTING SUPPORT, TYPE I, (40-20) 13.000 EA 0945 662013-001 SERVICE AND CONTROL STATION, 01 LUMP LUMP 0950 662014-001 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0955 662015-001 ELECTRICAL TEST, ( 1.00 ) LUMP SECTION NO. 0008 BRIDGE #10443 0960 212005-000 SELECT MATERIAL FOR BACKFILLING 90.000 CY 0965 601002-001 CLASS B CONCRETE 127.000 CY 0970 601009-001 CLASS H CONCRETE 442.000 CY 0975 601009-003 CLASS H CONCRETE, ARCHITECTURAL 36.000 CY 0977 601014-001 TEST SLAB LUMP LUMP 0980 602002-001 EPOXY COATED REINFORCING STEEL BAR 87,888.000 LB 0985 615001-001 STEEL SUPERSTRUCTURE ( 1.00 ) LUMP 0990 616005-018 HP14X73 STEEL BEARING PILE, PRE-DRILLED AND DRIVEN 641.000 LF 0995 617003-001 ALUMINUM RAILING , ANODIZED 435.000 LF 1000 627017-001 INSTALL SILICONE EXPANSION JOINT SYSTEM 14.000 LF 1005 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 1010 662002-001 GALVANIZED STEEL CONDUIT LUMP LUMP 1015 662006-001 JUNCTION BOX, TYPE A (MODIFIED) 1.000 EA 1025 626002-001 MSE RETAINING WALL, RETAINED EARTH 7,048.000 SF TT1 1030 626002-002 MSE RETAINING WALL, REINFORCED EARTH 7,048.000 SF TT2 1035 626002-003 MSE RETAINING WALL, ISOGRID 7,048.000 SF TT3 1 FEDERAL PROJECT PAGE 14 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0008 BRIDGE #10443 1040 626002-004 MSE RETAINING WALL, MSE PLUS 7,048.000 SF TT4 1045 626002-005 MSE RETAINING WALL, ARES 7,048.000 SF TT5 SECTION NO. 0009 BRIDGE #10444 1050 212001-000 STRUCTURE EXCAVATION 186.000 CY 1055 212005-000 SELECT MATERIAL FOR BACKFILLING 91.000 CY 1060 601002-001 CLASS B CONCRETE 145.000 CY 1065 601009-001 CLASS H CONCRETE 329.000 CY 1070 601009-003 CLASS H CONCRETE, ARCHITECTURAL 25.000 CY 1075 601014-001 TEST SLAB LUMP LUMP 1080 602001-001 REINFORCING STEEL BAR 27,056.000 LB 1085 602002-001 EPOXY COATED REINFORCING STEEL BAR 58,919.000 LB 1090 615001-001 STEEL SUPERSTRUCTURE ( 1.00 ) LUMP 1095 615029-001 NON-GUIDED BEARING 20.000 EA 1100 617003-001 ALUMINUM RAILING ,ANODIZED 276.000 LF 1105 625001-012 36 INCH DIAMETER DRILLED CAISSONS 147.000 LF 1110 625003-010 30 INCH ROCK SOCKET FOUNDATION 164.000 LF 1115 625004-012 36 INCH DRILLED CAISSON TEST HOLE LUMP LUMP 1120 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 1125 662002-001 GALVANIZED STEEL CONDUIT LUMP LUMP SECTION NO. 0010 BRIDGE #10445 1 FEDERAL PROJECT PAGE 15 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0010 BRIDGE #10445 1130 212001-000 STRUCTURE EXCAVATION 400.000 CY 1135 212005-000 SELECT MATERIAL FOR BACKFILLING 140.000 CY 1137 218004-001 8 INCH CRUSHED ROCK SLOPE PROTECTION 1,250.000 SY 1140 601002-001 CLASS B CONCRETE 633.000 CY 1145 601009-001 CLASS H CONCRETE 1,969.000 CY 1150 601009-003 CLASS H CONCRETE, ARCHITECTURAL 101.000 CY 1155 601014-001 TEST SLAB LUMP LUMP 1160 602001-001 REINFORCING STEEL BAR 112,539.000 LB 1165 602002-001 EPOXY COATED REINFORCING STEEL BAR 347,949.000 LB 1170 615001-001 STEEL SUPERSTRUCTURE ( 1.00 ) LUMP 1171 615028-001 GUIDED BEARING 16.000 EA 1172 615029-001 NON-GUIDED BEARING 16.000 EA 1173 615030-001 FIXED BEARING 8.000 EA 1175 617003-001 ALUMINUM RAILING , ANODIZED 1,305.000 LF 1180 625001-016 48 INCH DIAMETER DRILLED CAISSONS 409.000 LF 1185 625001-020 60 INCH DIAMETER DRILLED CAISSONS 192.000 LF 1190 625003-014 42 INCH ROCK SOCKET FOUNDATION 89.000 LF 1195 625003-018 54 INCH ROCK SOCKET FOUNDATION 161.000 LF 1200 625004-020 60 INCH DRILLED CAISSON TEST HOLE LUMP LUMP 1205 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 1210 662002-001 GALVANIZED STEEL CONDUIT LUMP LUMP 1 FEDERAL PROJECT PAGE 16 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0010 BRIDGE #10445 1215 662006-001 JUNCTION BOX, TYPE A (MODIFIED) 4.000 EA SECTION NO. 0011 STREAM STABILIZATION 1220 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 1224 207001-001 UNCLASSIFIED EXCAVATION , SCOUR POOL 31.000 CY 1225 207001-001 UNCLASSIFIED EXCAVATION 865.000 CY 1235 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 1240 641010-001 LIVE PLANT CUTTINGS, 2FT. LIVE STAKE 432.000 EA 1241 641021-001 ROCK J-HOOK, 168.000 CY 1242 652003-003 SEED MIXTURE, WETLAND, 23.000 LB 1243 655002-001 PERMANENT EROSION MATTING, TYPE B 720.000 SY SECTION NO. 0012 WATERLINE RELOCATION 1244 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 1245 670004-222 8 INCH DUCTILE IRON PIPE, TYPE II, CLASS 52 100.000 LF 1250 670007-004 3/4 INCH PLASTIC PIPE, CLASS 200 70.000 LF 1255 670007-022 8 INCH PLASTIC PIPE, CLASS 200 1,820.000 LF 1260 670010-300 16 INCH STEEL CASING PIPE, THICKNESS 0.1875 INCH 234.000 LF 1265 670015-040 3/4 INCH METER ,HIGH PRESSURE SETTING 1.000 EA 1270 670019-221 8 INCH SPECIAL VALVE, TAP AND SLEEVE WITH BOX 2.000 EA SECTION NO. 0013 LANDSCAPING 1275 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 1 FEDERAL PROJECT PAGE 17 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0013 LANDSCAPING 1280 642005-003 MULCH, WOOD CHIPS 2,242.000 TN 1285 642011-001 HAY OR STRAW BALE 3,740.000 EA 1290 651001-001 FURNISHING AND PLACING TOPSOIL 22,207.000 CY 1295 653001-001 VINES, FAST GROWING, PARTHENOCISSUS QUINQUEFOLIA 350.000 EA 1300 653001-001 VINES, FAST GROWING, VITIS AESTIVALIS 350.000 EA 1305 654001-001 TREE, DECIDUOUS, ACER RUBRUM 29.000 EA 1310 654001-001 TREE, DECIDUOUS, BETULA LENTA 13.000 EA 1315 654001-001 TREE, DECIDUOUS, NYSSA SYLVATICA 38.000 EA 1320 654001-001 TREE, DECIDUOUS, OXYDENDRUM ARBOREUM 30.000 EA 1325 654001-001 TREE, DECIDUOUS, PLATANUS OCCIDENTALIS 24.000 EA 1330 654001-001 TREE, DECIDUOUS, PRUNUS SEROTINA 41.000 EA 1335 654001-001 TREE, DECIDUOUS, QUERCUS PRIMUS 27.000 EA 1340 654001-001 TREE, DECIDUOUS, QUERCUS RUBRA 43.000 EA 1345 654003-001 SHRUB, DECIDUOUS, AMELANCHIER ABOREA 101.000 EA 1350 654003-001 SHRUB, DECIDUOUS, CERCIS CANADENSIS 142.000 EA 1355 654003-001 SHRUB, DECIDUOUS, RHUS GLABRA 101.000 EA 1360 654003-001 SHRUB, DECIDUOUS, RHUS TYPHIRA 76.000 EA 1365 654003-001 SHRUB, DECIDUOUS, VIBURNUM PRUNIFOLIUM 66.000 EA 1375 654004-001 SHRUB, EVERGREEN, KALMIA LATIFOLIA 167.000 EA 1385 654004-001 SHRUB, EVERGREEN, THUJA OCCIDENTALIS 220.000 EA 1395 654005-001 TREE, EVERGREEN, JUNIPERUS VIRGINIANA 20.000 EA 1 FEDERAL PROJECT PAGE 18 Call Order : 002 CONTRACT ID : 0227641 Letting Date : 04/06/04 10:00 A.M. PROJECTS : X316-000H/00-100.40 06 0APD 0484 251 C00 COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/05 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0013 LANDSCAPING 1400 654005-001 TREE, EVERGREEN, PINUS STROBUS 27.000 EA 1405 654005-001 TREE, EVERGREEN, PINUS VIRGINIANA 35.000 EA 1410 654005-001 TREE, EVERGREEN, IIEX OPACA 35.000 EA 1415 654006-001 WATER FOR PLANTS 54.000 MG SECTION NO. 0014 ON JOB TRAINING 1420 699000-001 ON JOB TRAINING 2,000.000 HR SECTION NO. 0015 COMPUTER SYSTEM 1425 640004-001 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP 1 FEDERAL PROJECT PAGE 19 Call Order : 003 CONTRACT ID : 0310744 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S306-0010/00-015.22 00 0STP 0010 120 E00 COUNTIES : CABELL DBE GOALS : 1.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204001-000 MOBILIZATION PERMENANT PAVEMENT MARKINGS LUMP LUMP 0015 204001-000 MOBILIZATION 3-DAY, TEMPRARY PAVEMENT MARKINGS LUMP LUMP 0020 207001-001 UNCLASSIFIED EXCAVATION 143.000 CY 0025 229001-000 SHOULDER AND DITCH 2.250 MI 0030 240001-000 CLEAN CULVERT 785.000 LF 0035 240002-000 CLEAN INLET 12.000 EA 0040 408002-001 BITUMINOUS MATERIAL 2,125.000 GA 0045 415005-001 REMOVE EXISTING PAVEMENT SURFACE 4,246.000 SY 0050 605015-001 ADJUST MANHOLE TYPE A 1.000 EA 0055 605020-001 INSTALL INLET GRATE, G 6.000 EA 0060 607001-001 TYPE 1 GUARDRAIL, CLASS 1 50.000 LF 0065 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 13,250.000 LF 0070 607010-001 TYPE 1 GUARDRAIL REMOVED AND STORED 450.000 LF 0075 607025-001 CUT SLOPE TERMINAL, TYPE A 4.000 EA 0080 607030-001 SPECIAL TRAILING END TERMINAL 8.000 EA 0085 607035-001 GUARDRAIL ELEMENT 20.000 EA 0090 607039-001 6X6X14 IN TREATED WOOD BLOCK 40.000 EA 0095 607046-001 7 INCH ROUND X 6 FT TREATED WOOD POST 40.000 EA 0100 607065-001 FLARED END TERMINAL 5.000 EA 0105 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 23,800.000 LF 1 FEDERAL PROJECT PAGE 20 Call Order : 003 CONTRACT ID : 0310744 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S306-0010/00-015.22 00 0STP 0010 120 E00 COUNTIES : CABELL DBE GOALS : 1.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 636011-001 TRAFFIC CONTROL DEVICE 5,000.000 UN 0115 636014-001 FLAGGER 2.000 HR 0120 636021-001 ELECTRIC ARROW 58.000 DA 0125 636025-001 WARNING LIGHTS, TYPE B 250.000 DA 0130 636026-001 TEMPORARY LIGHTING LUMP LUMP 0135 642004-002 SEED MIXTURE, B 171.000 LB 0140 642005-001 MULCH, STRAW OR HAY 3.500 TN 0145 642006-001 FERTILIZER 0.700 TN 0150 642031-001 DITCH CHECK 9.000 EA 0155 657008-001 2.00 LB CHANNEL POST 420.000 LF 0160 661004-001 DELINEATOR, REFLEX REFLECTOR, SINGLE, 60.000 EA 0165 661013-001 PLASTIC DELINEATOR POST, 63.000 EA 0170 663001-004 EDGE LINE, TYPE II WHITE 18,791.000 LF 0175 663001-004 EDGE LINE, TYPE II YELLOW 18,791.000 LF 0180 663002-010 LANE LINE OR CENTERLINE, TYPE V WHITE 4,788.000 LF 0185 663004-004 CHANNELIZING LINE, TYPE II 1,040.000 LF 0190 663005-010 STOP LINE, TYPE V 184.000 LF 0195 663007-010 STRIPE, TYPE V WHITE 148.000 LF 0200 663010-010 LANE ARROW, TYPE V 24.000 EA 0205 663011-010 LANE LETTER, TYPE V 24.000 EA 0210 663012-026 RAISED PAVEMENT MARKER, TYPE C-6R 26.000 EA 1 FEDERAL PROJECT PAGE 21 Call Order : 003 CONTRACT ID : 0310744 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S306-0010/00-015.22 00 0STP 0010 120 E00 COUNTIES : CABELL DBE GOALS : 1.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0215 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 1,131.000 TN AA1 0220 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 1,079.000 TN AA2 0225 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 1 283.000 TN BB1 0230 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 1 270.000 TN BB2 0235 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 400.000 TN CC1 GRAVEL 0240 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 356.000 TN CC2 0245 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 3,872.000 TN DD1 GRAVEL, TYPE 1 0250 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 3,696.000 TN DD2 1 FEDERAL PROJECT PAGE 22 Call Order : 004 CONTRACT ID : 0310741 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S306-0060/00-011.00 00 0STP 0060 187 E00 COUNTIES : CABELL DBE GOALS : 1.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204001-000 MOBILIZATION PERMENANT PAVEMENT MARKINGS LUMP LUMP 0015 204001-000 MOBILIZATION 3-DAY, TEMPORARY PAVEMENT MARKERS LUMP LUMP 0020 207001-001 UNCLASSIFIED EXCAVATION 4.000 CY 0025 211002-000 ROCK BORROW EXCAVATION 6.000 CY 0030 229001-000 SHOULDER AND DITCH 0.570 MI 0035 240002-000 CLEAN INLET 5.000 EA 0040 408002-001 BITUMINOUS MATERIAL 1,479.000 GA 0045 415005-001 REMOVE EXISTING PAVEMENT SURFACE 7,009.000 SY 0050 605004-001 TYPE B INLET 1.000 EA 0055 605015-001 ADJUST MANHOLE TYPE A 3.000 EA 0060 607001-001 TYPE 1 GUARDRAIL, CLASS 1 87.500 LF 0065 607010-001 TYPE 1 GUARDRAIL REMOVED AND STORED 87.500 LF 0070 607065-001 FLARED END TERMINAL 1.000 EA 0075 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 14,520.000 LF 0080 636011-001 TRAFFIC CONTROL DEVICE 7,100.000 UN 0085 636021-001 ELECTRIC ARROW 50.000 DA 0090 636025-001 WARNING LIGHTS, TYPE B 250.000 DA 0095 636026-001 TEMPORARY LIGHTING LUMP LUMP 0100 642004-002 SEED MIXTURE, B 21.000 LB 0105 642005-001 MULCH, STRAW OR HAY 0.400 TN 1 FEDERAL PROJECT PAGE 23 Call Order : 004 CONTRACT ID : 0310741 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S306-0060/00-011.00 00 0STP 0060 187 E00 COUNTIES : CABELL DBE GOALS : 1.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 642006-001 FERTILIZER 0.100 TN 0115 642031-001 DITCH CHECK 3.000 EA 0120 660007-001 MISCELLANEOUS SIGNAL 06 LUMP LUMP 0125 660007-001 MISCELLANEOUS SIGNAL 07 LUMP LUMP 0130 660007-001 MISCELLANEOUS SIGNAL 08 LUMP LUMP 0135 660007-001 MISCELLANEOUS SIGNAL 09 LUMP LUMP 0140 660007-001 MISCELLANEOUS SIGNAL 10 LUMP LUMP 0145 660007-001 MISCELLANEOUS SIGNAL 11 LUMP LUMP 0150 660007-001 MISCELLANEOUS SIGNAL 12 LUMP LUMP 0155 660007-001 MISCELLANEOUS SIGNAL 13 LUMP LUMP 0160 660007-001 MISCELLANEOUS SIGNAL 14 LUMP LUMP 0165 661013-001 PLASTIC DELINEATOR POST, WHITE 7.000 EA 0170 662015-001 ELECTRICAL TEST, ( 1.00 ) LUMP 0175 663001-004 EDGE LINE, TYPE II WHITE 13,652.000 LF 0180 663001-004 EDGE LINE, TYPE II YELLOW 1,152.000 LF 0185 663002-005 LANE LINE OR CENTERLINE, TYPE II WHITE 3,414.000 LF 0190 663003-005 BARRIER LINE, TYPE II YELLOW 25,000.000 LF 0195 663004-004 CHANNELIZING LINE, TYPE II WHITE 405.000 LF 0200 663005-010 STOP LINE, TYPE V 187.000 LF 0205 663006-004 CROSSWALK LINE, TYPE II 320.000 LF 0210 663007-010 STRIPE, TYPE V YELLOW 90.000 LF 1 FEDERAL PROJECT PAGE 24 Call Order : 004 CONTRACT ID : 0310741 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S306-0060/00-011.00 00 0STP 0060 187 E00 COUNTIES : CABELL DBE GOALS : 1.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0215 663010-010 LANE ARROW, TYPE V 36.000 EA 0220 663011-010 LANE LETTER, TYPE V 4.000 EA 0225 663012-026 RAISED PAVEMENT MARKER, TYPE C-6R WHITE 92.000 EA 0230 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 WHITE 152.000 EA 0235 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 YELLOW 592.000 EA 0240 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 149.000 TN AA1 0245 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 142.000 TN AA2 0250 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 1 7.700 TN BB1 0255 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 1 7.300 TN BB2 0260 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 1,357.000 TN CC1 TYPE 3 0265 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 3 1,296.000 TN CC2 0270 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 100.000 TN DD1 GRAVEL 0275 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 91.000 TN DD2 0280 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 2,719.000 TN EE1 GRAVEL, TYPE 1 0285 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 2,373.000 TN EE2 1 FEDERAL PROJECT PAGE 25 Call Order : 005 CONTRACT ID : 0326144 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S317-0079/00-106.42 00 00IM 0793 138 E00 COUNTIES : HARRISON DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, GUARDRAIL, DELINEATORS, AND PAVEMENT MARKINGS. 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER JOB ORDER (TEMPORARY MARKINGS) 1.000 EA 0015 204003-000 MOBILIZATION, PER JOB ORDER (PERMANENT MARKINGS) 1.000 EA 0020 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 4,000.000 TN AA1 0025 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 3,600.000 TN AA2 0030 401007-011 SUPERPAVE HOT-MIX ASPHALT SCRATCH COURSE, STONE OR 3,830.000 TN BB1 GRAVEL 0035 401007-012 SUPERPAVE HOT-MIX ASPHALT SCRATCH COURSE, SLAG 3,447.000 TN BB2 0040 402001-011 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 11,500.000 TN CC1 GRAVEL, TYPE 9.5 0045 402001-012 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, 10,350.000 TN CC2 SLAG, TYPE 9.5 0050 408002-001 BITUMINOUS MATERIAL 4,200.000 GA 0055 415005-001 REMOVE EXISTING PAVEMENT SURFACE 2,816.000 SY 0060 601046-001 MODIFIED CONCRETE END POST 3.000 EA 0065 607001-001 TYPE 1 GUARDRAIL, CLASS 1 1,350.000 LF 0070 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 10.000 EA 0075 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 27,762.500 LF 0080 607010-020 GUARDRAIL REMOVAL 418.750 LF 0085 607023-001 MODIFIED CUT SLOPE TERMINAL, TYPE A 9.000 EA 0090 607030-001 SPECIAL TRAILING END TERMINAL 2.000 EA 0095 607035-001 GUARDRAIL ELEMENT 60.000 EA 0100 607065-001 FLARED END TERMINAL 7.000 EA 0105 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 141,293.000 LF 1 FEDERAL PROJECT PAGE 26 Call Order : 005 CONTRACT ID : 0326144 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S317-0079/00-106.42 00 00IM 0793 138 E00 COUNTIES : HARRISON DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, GUARDRAIL, DELINEATORS, AND PAVEMENT MARKINGS. 0110 636009-001 TEMPORARY PAVEMENT MARKING-TAPE 4 IN SOLID LINE 8,000.000 LF 0115 636011-001 TRAFFIC CONTROL DEVICE 27,720.000 UN 0120 636012-010 PROJECT TRAFFIC CONTROL DEVICE CLEANING 4.000 EA 0125 636013-001 INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING 1,000.000 EA 0130 636014-001 FLAGGER 320.000 HR 0135 636014-002 TRAFFIC DIRECTOR 320.000 HR 0140 636021-001 ELECTRIC ARROW 90.000 DA 0145 636022-001 CHANGAEBLE MESSAGE SIGN 90.000 DA 0150 636025-001 WARNING LIGHTS, TYPE B 1,000.000 DA 0155 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0160 657008-001 2.00 LB CHANNEL POST 480.000 LF 0165 661004-001 DELINEATOR, REFLEX REFLECTOR, SINGLE, WHITE 180.000 EA 0170 661004-001 DELINEATOR, REFLEX REFLECTOR, SINGLE, YELLOW 50.000 EA 0175 661013-001 PLASTIC DELINEATOR POST, WHITE 60.000 EA 0180 663001-004 EDGE LINE, TYPE II PERMANENT WHITE 33,422.000 LF 0185 663001-004 EDGE LINE, TYPE II (PERMANENT YELLOW) 32,842.000 LF 0190 663002-005 LANE LINE OR CENTERLINE, TYPE II (PERMANENT WHITE) 8,765.000 LF 0195 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 (WHITE MONODIRECTIONAL), LOW PROFILE 412.000 EA 1 FEDERAL PROJECT PAGE 27 Call Order : 006 CONTRACT ID : 0310146 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S328-0011/00-008.64 00 0STP 0011 112 E00 COUNTIES : MERCER DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R-RESURFACING, GUARDRAIL, SHOULDER & DRAINAGE 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER 14 TEMPORARY 1.000 EA 0015 204003-000 MOBILIZATION, PER PERMANENT 1.000 EA 0020 229001-000 SHOULDER AND DITCH 4.390 MI 0025 408002-001 BITUMINOUS MATERIAL 1,520.000 GA 0030 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 4,400.000 LF 0035 607035-001 GUARDRAIL ELEMENT 8.000 EA 0040 607037-001 BUFFER END SECTION 1.000 EA 0045 607040-001 8X6X14 IN TREATED WOOD BLOCK 419.000 EA 0050 636011-001 TRAFFIC CONTROL DEVICE 7,915.000 UN 0055 636014-001 FLAGGER 400.000 HR 0060 642004-002 SEED MIXTURE, B 52.000 LB 0065 642005-001 MULCH, STRAW OR HAY 1.100 TN 0070 642006-001 FERTILIZER 0.200 TN 0075 642031-001 DITCH CHECK 22.000 EA 0080 663001-005 EDGE LINE, TYPE II WHITE 17.400 MI 0085 663002-004 LANE LINE OR CENTERLINE, TYPE II 0.200 MI 0090 663003-004 BARRIER LINE, TYPE II 16.800 MI 0095 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 1,377.000 TN AA1 0100 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 1,308.000 TN AA2 0105 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 2,781.000 TN BB1 TYPE 1 1 FEDERAL PROJECT PAGE 28 Call Order : 006 CONTRACT ID : 0310146 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S328-0011/00-008.64 00 0STP 0011 112 E00 COUNTIES : MERCER DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R-RESURFACING, GUARDRAIL, SHOULDER & DRAINAGE 0110 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 1 2,642.000 TN BB2 0115 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 105.000 TN CC1 GRAVEL 0120 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 100.000 TN CC2 0125 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 1,618.000 TN DD1 0130 401007-002 MARSHALL SCRATCH COURSE, SLAG 1,537.000 TN DD2 0135 401017-001 HOT-MIX ASPHALT POTHOLE REPAIR, STONE OR GRAVEL, TYPE II 6.000 TN EE1 0140 401017-002 HOT-MIX ASPHALT POTHOLE REPAIR, SLAG, TYPE II 6.000 TN EE2 1 FEDERAL PROJECT PAGE 29 Call Order : 007 CONTRACT ID : 0309347 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S331-0019/00-003.75 00 0STP 0019 253 E00 COUNTIES : MONONGALIA DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, GUARDRAIL, AND DRAINAGE 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER JOB ORDER (TEMPORARY) 1.000 EA 0015 204003-000 MOBILIZATION, PER JOB ORDER (PERMANENT) 1.000 EA 0020 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0025 207001-001 UNCLASSIFIED EXCAVATION 13.000 CY 0030 211001-000 UNCLASSIFIED BORROW EXCAVATION 30.000 CY 0035 218003-000 GABION 32.000 CY 0040 229001-000 SHOULDER AND DITCH 2.490 MI 0045 240001-000 CLEAN CULVERT 110.000 LF 0050 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 275.000 TN AA1 0055 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 261.000 TN AA2 0060 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 1 25.000 TN BB1 0065 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 1 23.000 TN BB2 0070 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 245.000 TN CC1 GRAVEL 0075 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 232.000 TN CC2 0080 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 837.000 TN DD1 0085 401007-002 MARSHALL SCRATCH COURSE, SLAG 795.000 TN DD2 0090 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 1,675.000 TN EE1 GRAVEL, TYPE 1 0095 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 1,591.000 TN EE2 0100 408002-001 BITUMINOUS MATERIAL 915.000 GA 0105 601002-001 CLASS B CONCRETE 6.600 CY 1 FEDERAL PROJECT PAGE 30 Call Order : 007 CONTRACT ID : 0309347 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S331-0019/00-003.75 00 0STP 0019 253 E00 COUNTIES : MONONGALIA DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, GUARDRAIL, AND DRAINAGE 0110 604050-012 15 INCH CORRUGATED POLYETHYLENE PIPE SMOOTH LINED 23.000 LF 0115 604050-016 18 INCH CORRUGATED POLYETHYLENE PIPE SMOOTH LINED 334.000 LF 0120 604050-020 24 INCH CORRUGATED POLYETHYLENE PIPE SMOOTH LINED 130.000 LF 0125 605009-001 TYPE G INLET 9.000 EA 0130 605014-001 MODIFIED INLET, TYPE G 2.000 EA 0135 605051-001 TYPE U INLET 1.000 EA 0140 607001-001 TYPE 1 GUARDRAIL, CLASS 1 1,812.500 LF 0145 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 975.000 LF 0150 607010-020 GUARDRAIL REMOVAL 2,012.500 LF 0155 607065-001 FLARED END TERMINAL 11.000 EA 0160 607066-001 TANGENT END TERMINAL 6.000 EA 0165 636006-001 PILOT TRUCK AND DRIVER 7.000 DA 0170 636011-001 TRAFFIC CONTROL DEVICE 2,790.000 UN 0175 636014-001 FLAGGER 140.000 HR 0180 642004-002 SEED MIXTURE, B 118.000 LB 0185 642005-002 MULCH, WOOD CELLULOSE FIBER 0.900 TN 0190 642006-001 FERTILIZER 0.480 TN 0195 642031-001 DITCH CHECK 52.000 EA 0200 663001-005 EDGE LINE, TYPE II (PERMANENT) 4.900 MI 0205 663001-005 EDGE LINE, TYPE II (TEMPORARY) 4.900 MI 0210 663002-004 LANE LINE OR CENTERLINE, TYPE II (PERMANENT) 4.900 MI 1 FEDERAL PROJECT PAGE 31 Call Order : 007 CONTRACT ID : 0309347 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S331-0019/00-003.75 00 0STP 0019 253 E00 COUNTIES : MONONGALIA DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, GUARDRAIL, AND DRAINAGE 0215 663002-004 LANE LINE OR CENTERLINE, TYPE II (TEMPORARY) 4.900 MI 1 FEDERAL PROJECT PAGE 32 Call Order : 008 CONTRACT ID : 0310148 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S341-0004/00-003.00 00 0STP 0004 034 E00 COUNTIES : RALEIGH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R-RESURFACE (1"), STABILIZE SHOULDERS 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER 3 DAY TEMPORARY 1.000 EA 0015 204003-000 MOBILIZATION, PER PERMANENT 1.000 EA 0020 229001-000 SHOULDER AND DITCH 1.740 MI 0025 408002-001 BITUMINOUS MATERIAL 750.000 GA 0030 636006-001 PILOT TRUCK AND DRIVER 5.000 DA 0035 636011-001 TRAFFIC CONTROL DEVICE 3,760.000 UN 0040 636014-001 FLAGGER 144.000 HR 0045 642031-001 DITCH CHECK 12.000 EA 0050 663001-005 EDGE LINE, TYPE II WHITE 7.000 MI 0055 663003-005 BARRIER LINE, TYPE II YELLOW 36,960.000 LF 0060 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 400.000 TN AA1 0065 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 364.000 TN AA2 0070 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 1,350.000 TN BB1 TYPE I 0075 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE I 1,230.000 TN BB2 0080 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 700.000 TN CC1 0085 401007-002 MARSHALL SCRATCH COURSE, SLAG 637.000 TN CC2 1 FEDERAL PROJECT PAGE 33 Call Order : 009 CONTRACT ID : 0310048 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S343-0047/00-013.92 00 0STP 0047 034 E00 COUNTIES : RITCHIE DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 PARKERSBURG-SMITHVILLE ROAD 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER PERMANENT PAVEMENT MARKING 1.000 EA 0015 204003-000 MOBILIZATION, PER 14-DAY TEMPORARY PAVEMENT MARKING 1.000 EA 0020 229001-000 SHOULDER AND DITCH 2.560 MI 0025 307001-000 AGGREGATE BASE COURSE, CLASS 1 77.000 CY 0030 408002-001 BITUMINOUS MATERIAL 1,050.000 GA 0035 604001-016 18 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 120.000 LF 0040 605009-001 TYPE G INLET MODIFIED 3.000 EA 0045 607001-001 TYPE 1 GUARDRAIL, CLASS 1 2,425.000 LF 0050 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 1,525.000 LF 0055 607010-020 GUARDRAIL REMOVAL 350.000 LF 0065 607066-001 TANGENT END TERMINAL 5.000 EA 0070 622003-001 CANTILEVER MAILBOX SUPPORT 4.000 EA 0075 636006-001 PILOT TRUCK AND DRIVER 10.000 DA 0080 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 54,050.000 LF 0085 636011-001 TRAFFIC CONTROL DEVICE 5,310.000 UN 0090 636014-001 FLAGGER 400.000 HR 0095 642031-001 DITCH CHECK 80.000 EA 0100 652003-005 SEED MIXTURE, L 140.000 LB 0105 652004-002 WOOD CELLULOSE FIBER MULCH 5.000 TN 0110 663001-005 EDGE LINE, TYPE II 5.120 MI 1 FEDERAL PROJECT PAGE 34 Call Order : 009 CONTRACT ID : 0310048 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S343-0047/00-013.92 00 0STP 0047 034 E00 COUNTIES : RITCHIE DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 PARKERSBURG-SMITHVILLE ROAD 0115 663002-004 LANE LINE OR CENTERLINE, TYPE II 5.120 MI 0120 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 975.000 TN AA1 0125 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 888.000 TN AA2 0130 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE II 24.000 TN BB1 0135 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE II 22.000 TN BB2 0140 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 2,130.000 TN CC1 TYPE I 0145 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE I 1,939.000 TN CC2 0150 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 28.000 TN DD1 GRAVEL 0155 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 26.000 TN DD2 0160 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 1,300.000 TN EE1 0165 401007-002 MARSHALL SCRATCH COURSE, SLAG 1,183.000 TN EE2 1 FEDERAL PROJECT PAGE 35 Call Order : 010 CONTRACT ID : 0309045 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S352-0002/00-000.00 00 00NH 0002 393 E00 COUNTIES : WETZEL DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, DRAINAGE, GUARDRAIL 0005 204001-000 MOBILIZATION PROJECT LUMP LUMP 0010 204003-000 MOBILIZATION, PER PERM. PAINT 1.000 EA 0015 204003-000 MOBILIZATION, PER TEMP. PAINT 1.000 EA 0020 204003-000 MOBILIZATION, PER TEMP. PAINT, ROTOMILL 1.000 EA 0025 211001-000 UNCLASSIFIED BORROW EXCAVATION 335.000 CY 0030 211008-000 ROCK BORROW EXCAVATION 70.000 TN 0035 229001-000 SHOULDER AND DITCH 3.020 MI 0040 240002-000 CLEAN INLET 7.000 EA 0045 240006-000 CLEAN INLET AND OUTLET DITCH 15.000 LF 0050 408002-001 BITUMINOUS MATERIAL 1,485.000 GA 0055 415005-001 REMOVE EXISTING PAVEMENT SURFACE 18,347.000 SY 0060 604001-010 12 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 5.000 LF 0065 604001-012 15 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 132.000 LF 0070 604001-016 18 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 25.000 LF 0075 604053-020 24 INCH RELAID CONDUIT, 4.000 LF 0080 604072-112 15 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 2.000 EA 0085 604072-116 18 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 8.000 EA 0090 605003-001 TYPE A INLET MODIFIED 1.000 EA 0095 605004-001 TYPE B INLET 3.000 EA 0100 605009-001 TYPE G INLET 5.000 EA 0105 605012-001 ADJUST INLET TYPE A 2.000 EA 1 FEDERAL PROJECT PAGE 36 Call Order : 010 CONTRACT ID : 0309045 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S352-0002/00-000.00 00 00NH 0002 393 E00 COUNTIES : WETZEL DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, DRAINAGE, GUARDRAIL 0110 605012-001 ADJUST INLET TYPE CURB 35.000 EA 0115 605015-001 ADJUST MANHOLE TYPE A 1.000 EA 0120 607001-001 TYPE 1 GUARDRAIL, CLASS 1 225.000 LF 0125 607001-001 TYPE 1 GUARDRAIL, CLASS 5 25.000 LF 0130 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 512.500 LF 0135 607010-020 GUARDRAIL REMOVAL 300.000 LF 0140 607066-001 TANGENT END TERMINAL 1.000 EA 0145 622003-001 CANTILEVER MAILBOX SUPPORT 22.000 EA 0150 636011-001 TRAFFIC CONTROL DEVICE 4,840.000 UN 0155 636014-001 FLAGGER 300.000 HR 0160 642004-002 SEED MIXTURE, B 718.200 LB 0165 642005-002 MULCH, WOOD CELLULOSE FIBER 5.670 TN 0170 642006-001 FERTILIZER 10-20-10 3.780 TN 0175 642031-001 DITCH CHECK 96.000 EA 0180 663001-005 EDGE LINE, TYPE II PERM. WHITE 4.540 MI 0185 663001-005 EDGE LINE, TYPE II TEMP., WHITE 9.080 MI 0190 663002-004 LANE LINE OR CENTERLINE, TYPE II PERM., YELLOW 4.430 MI 0195 663002-004 LANE LINE OR CENTERLINE, TYPE II TEMP., YELLOW 8.860 MI 0200 663002-004 LANE LINE OR CENTERLINE, TYPE II TEMP., YELLOW, ROTOMILL 1.750 MI 0205 663005-010 STOP LINE, TYPE V 24", WHITE 52.000 LF 0210 663006-010 CROSSWALK LINE, TYPE V 8" 296.000 LF 1 FEDERAL PROJECT PAGE 37 Call Order : 010 CONTRACT ID : 0309045 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S352-0002/00-000.00 00 00NH 0002 393 E00 COUNTIES : WETZEL DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, DRAINAGE, GUARDRAIL 0215 670023-001 ADJUSTING VALVE BOX 4.000 EA 0220 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 1,267.000 TN AA1 0225 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 1,242.000 TN AA2 0230 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 10 1,337.000 TN AA3 0235 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 158.000 TN BB1 GRAVEL 0240 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 151.000 TN BB2 0245 401003-003 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STEEL SLAG 167.000 TN BB3 0250 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 1,009.000 TN CC1 0255 401007-002 MARSHALL SCRATCH COURSE, SLAG 964.000 TN CC2 0260 401007-003 MARSHALL SCRATCH COURSE, STEEL SLAG 1,065.000 TN CC3 0265 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 2,780.000 TN DD1 GRAVEL, TYPE 1 0270 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 2,655.000 TN DD2 0275 402001-003 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STEEL 2,933.000 TN DD3 SLAG, TYPE 1 1 FEDERAL PROJECT PAGE 38 Call Order : 011 CONTRACT ID : 0309343 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S352-0002/00-007.09 00 00NH 0002 397 E00 COUNTIES : WETZEL DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, DRAINAGE, GUARDRAIL 0005 204001-000 MOBILIZATION PROJECT LUMP LUMP 0010 204003-000 MOBILIZATION, PER PERM. PAINT 1.000 EA 0015 204003-000 MOBILIZATION, PER TEMP. PAINT 1.000 EA 0020 211001-000 UNCLASSIFIED BORROW EXCAVATION 43.000 CY 0025 211008-000 ROCK BORROW EXCAVATION 25.000 TN 0030 229001-000 SHOULDER AND DITCH 2.230 MI 0035 240001-000 CLEAN CULVERT 15" 273.000 LF 0040 240001-000 CLEAN CULVERT 18" 36.000 LF 0045 408002-001 BITUMINOUS MATERIAL 1,548.000 GA 0050 601006-001 CLASS D CONCRETE 12.000 CY 0055 604001-012 15 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 29.000 LF 0060 604001-016 18 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 10.000 LF 0065 604001-020 24 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 12.000 LF 0070 604053-016 18 INCH RELAID CONDUIT, 8.000 LF 0075 604072-112 15 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 15.000 EA 0080 604072-116 18 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 5.000 EA 0085 605004-001 TYPE B INLET 1.000 EA 0090 605007-001 TYPE E INLET 1.000 EA 0095 605009-001 TYPE G INLET 2.000 EA 0100 605012-001 ADJUST INLET TYPE B 4.000 EA 0105 605015-001 ADJUST MANHOLE TYPE A 3.000 EA 1 FEDERAL PROJECT PAGE 39 Call Order : 011 CONTRACT ID : 0309343 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S352-0002/00-007.09 00 00NH 0002 397 E00 COUNTIES : WETZEL DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, DRAINAGE, GUARDRAIL 0110 605050-001 ADJUST CONCRETE HEADWALL 2.000 EA 0115 607001-001 TYPE 1 GUARDRAIL, CLASS 1 50.000 LF 0120 607005-001 TYPE 5 GUARDRAIL, CLASS 5 37.500 LF 0125 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 187.500 LF 0130 607010-020 GUARDRAIL REMOVAL 512.500 LF 0135 607037-001 BUFFER END SECTION 1.000 EA 0140 607066-001 TANGENT END TERMINAL 10.000 EA 0145 609001-001 CONCRETE SIDEWALK 6.000 SY 0150 609002-001 BED COURSE MATERIAL 0.650 CY 0155 622003-001 CANTILEVER MAILBOX SUPPORT 10.000 EA 0160 636011-001 TRAFFIC CONTROL DEVICE 9,300.000 UN 0165 636014-001 FLAGGER 240.000 HR 0170 636014-002 TRAFFIC DIRECTOR 120.000 HR 0175 642004-002 SEED MIXTURE, B 484.500 LB 0180 642005-002 MULCH, WOOD CELLULOSE FIBER 3.830 TN 0185 642006-001 FERTILIZER 10-20-10 2.550 TN 0190 642031-001 DITCH CHECK 18.000 EA 0195 663001-005 EDGE LINE, TYPE II PERM., WHITE 4.380 MI 0200 663001-005 EDGE LINE, TYPE II TEMP., WHITE 8.760 MI 0205 663003-005 BARRIER LINE, TYPE II PERM., YELLOW 5.300 LF 0210 663003-005 BARRIER LINE, TYPE II TEMP., YELLOW 10.600 LF 1 FEDERAL PROJECT PAGE 40 Call Order : 011 CONTRACT ID : 0309343 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S352-0002/00-007.09 00 00NH 0002 397 E00 COUNTIES : WETZEL DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, DRAINAGE, GUARDRAIL 0215 663004-004 CHANNELIZING LINE, TYPE II PERM., WHITE 912.000 LF 0220 663004-004 CHANNELIZING LINE, TYPE II TEMP., WHITE 1,824.000 LF 0225 663005-010 STOP LINE, TYPE V 24", WHITE 129.000 LF 0230 663006-010 CROSSWALK LINE, TYPE V 8" 90.000 LF 0235 663007-010 STRIPE, TYPE V 24", YELLOW 573.000 LF 0240 663010-010 LANE ARROW, TYPE V WHITE 31.000 EA 0245 663011-010 LANE LETTER, TYPE V WHITE 24.000 EA 0250 670023-001 ADJUSTING VALVE BOX 4.000 EA 0255 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 921.000 TN AA1 0260 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 903.000 TN AA2 0265 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 10 972.000 TN AA3 0270 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 1,474.000 TN BB1 0275 401007-002 MARSHALL SCRATCH COURSE, SLAG 1,408.000 TN BB2 0280 401007-003 MARSHALL SCRATCH COURSE, STEEL SLAG 1,555.000 TN BB3 0285 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 2,853.000 TN CC1 GRAVEL, TYPE 1 0290 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 2,725.000 TN CC2 0295 402001-003 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STEEL 3,010.000 TN CC3 SLAG, TYPE 1 1 FEDERAL PROJECT PAGE 41 Call Order : 012 CONTRACT ID : 0310142 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S355-0054/00-000.05 00 0STP 0054 025 E00 COUNTIES : WYOMING DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R-RESURFACING, GUARDRAIL, SHOULDER & DRAINAGE 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER 3 DAY TEMPORARY 1.000 EA 0015 204003-000 MOBILIZATION, PER PERMANENT 1.000 EA 0020 211008-000 ROCK BORROW EXCAVATION 10.000 TN 0025 229001-000 SHOULDER AND DITCH 2.440 MI 0030 408002-001 BITUMINOUS MATERIAL 1,595.000 GA 0035 415005-001 REMOVE EXISTING PAVEMENT SURFACE 2,338.000 SY 0040 605012-001 ADJUST INLET TYPE 2.000 EA 0045 605020-001 INSTALL INLET GRATE, 38" X 30" 1.000 EA 0050 607001-001 TYPE 1 GUARDRAIL, CLASS 1 6,000.000 LF 0055 607001-001 TYPE 1 GUARDRAIL, CLASS V 912.500 LF 0060 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 125.000 LF 0065 607010-020 GUARDRAIL REMOVAL 6,900.000 LF 0070 607025-001 CUT SLOPE TERMINAL, TYPE A 2.000 EA 0075 607030-001 SPECIAL TRAILING END TERMINAL 4.000 EA 0080 607035-001 GUARDRAIL ELEMENT 34.000 EA 0085 607049-001 10 FT STEEL POST 8.000 EA 0090 607066-001 TANGENT END TERMINAL 9.000 EA 0095 636006-001 PILOT TRUCK AND DRIVER 21.000 DA 0100 636011-001 TRAFFIC CONTROL DEVICE 9,450.000 UN 0105 636014-001 FLAGGER 660.000 HR 1 FEDERAL PROJECT PAGE 42 Call Order : 012 CONTRACT ID : 0310142 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S355-0054/00-000.05 00 0STP 0054 025 E00 COUNTIES : WYOMING DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R-RESURFACING, GUARDRAIL, SHOULDER & DRAINAGE 0110 642004-002 SEED MIXTURE, B 87.000 LB 0115 642005-002 MULCH, WOOD CELLULOSE FIBER 0.700 TN 0120 642006-001 FERTILIZER 0.400 TN 0125 642031-001 DITCH CHECK 20.000 EA 0130 663001-005 EDGE LINE, TYPE II WHITE 9.800 MI 0135 663002-005 LANE LINE OR CENTERLINE, TYPE II WHITE 2,625.000 LF 0140 663003-004 BARRIER LINE, TYPE II YELLOW 7.400 MI 0145 663004-004 CHANNELIZING LINE, TYPE II WHITE 200.000 LF 0150 663005-010 STOP LINE, TYPE V 12" 28.000 LF 0155 663007-010 STRIPE, TYPE V 121.000 LF 0160 663010-010 LANE ARROW, TYPE V 2.000 EA 0165 663011-010 LANE LETTER, TYPE V 8.000 EA 0170 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 1,225.000 TN AA1 0175 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 1,140.000 TN AA2 0180 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 389.000 TN BB1 TYPE 1 0185 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 1 370.000 TN BB2 0190 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 1,029.000 TN CC1 0195 401007-002 MARSHALL SCRATCH COURSE, SLAG 978.000 TN CC2 0200 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 2,212.000 TN DD1 GRAVEL, TYPE I 0205 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE I 2,102.000 TN DD2 1 FEDERAL PROJECT PAGE 43 Call Order : 013 CONTRACT ID : 0210854 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S355-0097/00-005.47 00 0STP 0097 082 E00 COUNTIES : WYOMING DBE GOALS : 1.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R, RESURFACE & STABILIZE SHOULDERS 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER 3 DAY TEMPORARY 1.000 EA 0015 204003-000 MOBILIZATION, PER PERMANENT 1.000 EA 0020 229001-000 SHOULDER AND DITCH 3.390 MI 0025 408002-001 BITUMINOUS MATERIAL 1,500.000 GA 0030 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 4,600.000 LF 0035 607010-020 GUARDRAIL REMOVAL 350.000 LF 0040 607035-001 GUARDRAIL ELEMENT 25.000 EA 0045 607037-001 BUFFER END SECTION 1.000 EA 0050 607041-001 13 FT - 6.5 IN CURVED RAIL ELEMENT 3.000 EA 0055 636006-001 PILOT TRUCK AND DRIVER 14.000 DA 0060 636011-001 TRAFFIC CONTROL DEVICE 9,040.000 UN 0065 636014-001 FLAGGER 336.000 HR 0070 642004-002 SEED MIXTURE, B 200.000 LB 0075 642005-002 MULCH, WOOD CELLULOSE FIBER 1.500 TN 0080 642006-001 FERTILIZER 1.000 TN 0085 642031-001 DITCH CHECK 22.000 EA 0090 663001-005 EDGE LINE, TYPE II WHITE 13.500 MI 0095 663003-005 BARRIER LINE, TYPE II YELLOW 60,250.000 LF 0100 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 2,400.000 TN AA1 0105 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 2,185.000 TN AA2 1 FEDERAL PROJECT PAGE 44 Call Order : 013 CONTRACT ID : 0210854 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S355-0097/00-005.47 00 0STP 0097 082 E00 COUNTIES : WYOMING DBE GOALS : 1.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R, RESURFACE & STABILIZE SHOULDERS 0110 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 1,350.000 TN BB1 0115 401007-002 MARSHALL SCRATCH COURSE, SLAG 1,230.000 TN BB2 0120 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 2,700.000 TN CC1 TYPE 1 0125 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 1 2,460.000 TN CC2 1 FEDERAL PROJECT PAGE 45 Call Order : 014 CONTRACT ID : 0332140 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S309-0050/00-001.34 00 00NH 0050 217 E00 COUNTIES : DODDRIDGE DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, PAVEMENT MARKINGS, GUARDRAIL, AND DRAINAGE. 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER JOB ORDER (TEMPORARY MARKINGS) 1.000 EA 0015 204003-000 MOBILIZATION, PER JOB ORDER (TEMPORARY MARKINGS) 1.000 EA 0020 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 3,600.000 TN AA1 0025 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 3,420.000 TN AA2 0030 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 3,700.000 TN BB1 0035 401007-002 MARSHALL SCRATCH COURSE, SLAG 3,515.000 TN BB2 0040 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 13,000.000 TN CC1 GRAVEL, TYPE 1 0045 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 12,350.000 TN CC2 0050 408002-001 BITUMINOUS MATERIAL 6,100.000 GA 0055 415005-001 REMOVE EXISTING PAVEMENT SURFACE 13,800.000 SY 0060 507002-001 CRACK AND POTHOLE REPAIR 50.000 TN 0065 607001-001 TYPE 1 GUARDRAIL, CLASS 1 200.000 LF 0070 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 22,587.500 LF 0075 607010-020 GUARDRAIL REMOVAL 75.000 LF 0080 607023-001 MODIFIED CUT SLOPE TERMINAL, TYPE A 2.000 EA 0085 607065-001 FLARED END TERMINAL 1.000 EA 0090 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 213,850.000 LF 0095 636009-001 TEMPORARY PAVEMENT MARKING-TAPE 4 IN SOLID LINE 12,000.000 LF 0100 636011-001 TRAFFIC CONTROL DEVICE 37,400.000 UN 0105 636013-001 INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING 375.000 EA 1 FEDERAL PROJECT PAGE 46 Call Order : 014 CONTRACT ID : 0332140 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S309-0050/00-001.34 00 00NH 0050 217 E00 COUNTIES : DODDRIDGE DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, PAVEMENT MARKINGS, GUARDRAIL, AND DRAINAGE. 0110 636014-001 FLAGGER 750.000 HR 0115 636014-002 TRAFFIC DIRECTOR 500.000 HR 0120 636021-001 ELECTRIC ARROW 100.000 DA 0125 636022-001 CHANGAEBLE MESSAGE SIGN 100.000 DA 0130 636025-001 WARNING LIGHTS, TYPE 3,200.000 DA 0135 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0140 657008-001 2.00 LB CHANNEL POST 498.000 LF 0145 661004-001 DELINEATOR, REFLEX REFLECTOR, SINGLE, WHITE 60.000 EA 0150 661013-001 PLASTIC DELINEATOR POST, WHITE 110.000 EA 0155 663001-005 EDGE LINE, TYPE II (PERMANENT WHITE) 47,700.000 MI 0160 663001-005 EDGE LINE, TYPE II (PERMANENT YELLOW) 47,100.000 MI 0165 663002-005 LANE LINE OR CENTERLINE, TYPE II (PERMANENT WHITE) 11,775.000 LF 0170 663002-005 LANE LINE OR CENTERLINE, TYPE II (PERMANENT YELLOW) 350.000 LF 0175 663004-011 CHANNELIZING LINE, TYPE V 950.000 LF 0180 663005-010 STOP LINE, TYPE V 120.000 LF 0185 663010-010 LANE ARROW, TYPE V 15.000 EA 0190 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 (WHITE MONODIRECTIONAL) 480.000 EA 0195 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 (RED/WHITE MONODIRECTIONAL) 125.000 EA 1 FEDERAL PROJECT PAGE 47 Call Order : 015 CONTRACT ID : 0310141 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S324-0083/00-013.08 00 00NH 0083 047 E00 COUNTIES : MCDOWELL DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R-RESURFACING, STABILIZE SHOULDERS 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER 3 DAY TEMPORARY 1.000 EA 0015 204003-000 MOBILIZATION, PER PERMANENT 1.000 EA 0020 229001-000 SHOULDER AND DITCH 4.440 MI 0025 408002-001 BITUMINOUS MATERIAL 1,750.000 GA 0030 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 8,650.000 LF 0035 607010-020 GUARDRAIL REMOVAL 487.500 LF 0040 607035-001 GUARDRAIL ELEMENT 30.000 EA 0045 607066-001 TANGENT END TERMINAL 4.000 EA 0050 636006-001 PILOT TRUCK AND DRIVER 17.000 DA 0055 636011-001 TRAFFIC CONTROL DEVICE 4,840.000 UN 0060 636014-001 FLAGGER 408.000 HR 0065 642004-002 SEED MIXTURE, B 200.000 LB 0070 642005-002 MULCH, WOOD CELLULOSE FIBER 1.500 TN 0075 642006-001 FERTILIZER 1.000 TN 0080 642031-001 DITCH CHECK 28.000 EA 0085 663001-005 EDGE LINE, TYPE II WHITE 17.800 MI 0090 663003-005 BARRIER LINE, TYPE II YELLOW 80,000.000 LF 0095 663015-005 RAILROAD CROSSING MARKING, TYPE V 4.000 EA 0100 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 2,750.000 TN AA1 0105 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 2,503.000 TN AA2 1 FEDERAL PROJECT PAGE 48 Call Order : 015 CONTRACT ID : 0310141 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S324-0083/00-013.08 00 00NH 0083 047 E00 COUNTIES : MCDOWELL DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R-RESURFACING, STABILIZE SHOULDERS 0110 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 3,200.000 TN BB1 TYPE 1 0115 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 1 2,912.000 TN BB2 0120 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 1,600.000 TN CC1 0125 401007-002 MARSHALL SCRATCH COURSE, SLAG 1,456.000 TN CC2 1 FEDERAL PROJECT PAGE 49 Call Order : 016 CONTRACT ID : 0309843 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S340-0034/00-014.69 00 0STP 0034 054 E00 COUNTIES : PUTNAM DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/03 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER PERM 1.000 EA 0015 204003-000 MOBILIZATION, PER 3DAY TEMP 2.000 EA 0020 229001-000 SHOULDER AND DITCH 1.620 MI 0025 240001-000 CLEAN CULVERT 658.000 LF 0030 240002-000 CLEAN INLET 6.000 EA 0035 240004-000 CLEAN BOX AND GRATE 45.000 LF 0040 408002-001 BITUMINOUS MATERIAL 1,631.000 GA 0045 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 4,350.000 LF 0050 607010-020 GUARDRAIL REMOVAL 637.500 LF 0055 607025-001 CUT SLOPE TERMINAL, TYPE A 2.000 EA 0060 607065-001 FLARED END TERMINAL 1.000 EA 0065 607066-001 TANGENT END TERMINAL 12.000 EA 0070 636006-001 PILOT TRUCK AND DRIVER 33.000 DA 0075 636011-001 TRAFFIC CONTROL DEVICE 21,520.000 UN 0080 636014-001 FLAGGER 792.000 HR 0085 636014-002 TRAFFIC DIRECTOR 792.000 HR 0090 636021-001 ELECTRIC ARROW 66.000 DA 0095 636022-001 CHANGAEBLE MESSAGE SIGN 172.000 DA 0100 636025-001 WARNING LIGHTS, TYPE B 1,175.000 DA 0105 642031-001 DITCH CHECK 43.000 EA 1 FEDERAL PROJECT PAGE 50 Call Order : 016 CONTRACT ID : 0309843 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S340-0034/00-014.69 00 0STP 0034 054 E00 COUNTIES : PUTNAM DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/03 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 652002-001 FERTILIZER, 10-20-10 0.450 TN 0115 652003-001 SEED MIXTURES, B, C-1, OR C-2 287.500 LB 0120 652004-002 WOOD CELLULOSE FIBER MULCH 4.750 TN 0125 663001-005 EDGE LINE, TYPE II WHITE 13.680 MI 0130 663002-004 LANE LINE OR CENTERLINE, TYPE II WHITE 1.420 MI 0135 663002-004 LANE LINE OR CENTERLINE, TYPE II YELLOW 9.300 MI 0140 663003-005 BARRIER LINE, TYPE II YELLOW 8,920.000 LF 0145 663004-011 CHANNELIZING LINE, TYPE V 2,015.000 LF 0150 663005-010 STOP LINE, TYPE V 24" 300.000 LF 0155 663010-010 LANE ARROW, TYPE V 69.000 EA 0160 663011-010 LANE LETTER, TYPE V 36.000 EA 0165 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 1,224.000 EA 0170 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 1,260.000 TN AA1 0175 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 1,134.000 TN AA2 0180 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 1,525.000 TN BB1 0185 401007-002 MARSHALL SCRATCH COURSE, SLAG 1,372.500 TN BB2 0190 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 3,050.000 TN CC1 GRAVEL, TYPE I 0195 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE I 2,745.000 TN CC2 1 FEDERAL PROJECT PAGE 51 Call Order : 017 CONTRACT ID : 0210847 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S302-0009/00-011.15 00 00NH 0009 156 E00 COUNTIES : BERKELEY DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 REHABILITATION-RESTORATION-RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER PERMANENT 1.000 EA 0015 204003-000 MOBILIZATION, PER 3 DAY TEMPORARY 1.000 EA 0020 408002-001 BITUMINOUS MATERIAL 1,540.000 GA 0025 415005-001 REMOVE EXISTING PAVEMENT SURFACE 2,490.000 SY 0030 607001-001 TYPE 1 GUARDRAIL, CLASS 1 2,834.000 LF 0035 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 4.000 EA 0040 607010-020 GUARDRAIL REMOVAL 2,909.000 LF 0045 607035-001 GUARDRAIL ELEMENT 1.000 EA 0050 607037-001 BUFFER END SECTION 7.000 EA 0055 607065-001 FLARED END TERMINAL 1.000 EA 0060 636006-001 PILOT TRUCK AND DRIVER 18.000 DA 0065 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 26,204.000 LF 0070 636011-001 TRAFFIC CONTROL DEVICE 5,740.000 UN 0075 636014-001 FLAGGER 360.000 HR 0080 660005-010 JUNCTION BOX, TYPE H 1.000 EA 0085 660007-001 MISCELLANEOUS SIGNAL 01 LUMP LUMP 0090 660007-001 MISCELLANEOUS SIGNAL 02 LUMP LUMP 0095 660007-001 MISCELLANEOUS SIGNAL 03 LUMP LUMP 0100 660007-001 MISCELLANEOUS SIGNAL 04 LUMP LUMP 0105 660007-001 MISCELLANEOUS SIGNAL 05 LUMP LUMP 1 FEDERAL PROJECT PAGE 52 Call Order : 017 CONTRACT ID : 0210847 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S302-0009/00-011.15 00 00NH 0009 156 E00 COUNTIES : BERKELEY DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 REHABILITATION-RESTORATION-RESURFACING 0110 660007-001 MISCELLANEOUS SIGNAL 06 LUMP LUMP 0115 660007-001 MISCELLANEOUS SIGNAL 07 LUMP LUMP 0120 660007-001 MISCELLANEOUS SIGNAL 08 LUMP LUMP 0125 660007-001 MISCELLANEOUS SIGNAL 09 LUMP LUMP 0130 660007-001 MISCELLANEOUS SIGNAL 10 LUMP LUMP 0135 660007-001 MISCELLANEOUS SIGNAL 11 LUMP LUMP 0140 660007-001 MISCELLANEOUS SIGNAL 12 LUMP LUMP 0145 660007-001 MISCELLANEOUS SIGNAL 13 LUMP LUMP 0150 660007-001 MISCELLANEOUS SIGNAL 14 LUMP LUMP 0155 660007-001 MISCELLANEOUS SIGNAL 15 LUMP LUMP 0160 660007-001 MISCELLANEOUS SIGNAL 16 LUMP LUMP 0165 660007-001 MISCELLANEOUS SIGNAL 17 LUMP LUMP 0170 660007-001 MISCELLANEOUS SIGNAL 18 LUMP LUMP 0175 660007-001 MISCELLANEOUS SIGNAL 19 LUMP LUMP 0180 660007-001 MISCELLANEOUS SIGNAL 20 LUMP LUMP 0185 660007-001 MISCELLANEOUS SIGNAL 21 LUMP LUMP 0190 660007-001 MISCELLANEOUS SIGNAL 22 LUMP LUMP 0195 660007-001 MISCELLANEOUS SIGNAL 23 LUMP LUMP 0200 662015-001 ELECTRICAL TEST, ( 1.00 ) LUMP 0205 663001-005 EDGE LINE, TYPE II WHITE 3.240 MI 0210 663002-004 LANE LINE OR CENTERLINE, TYPE II YELLOW 4.960 MI 1 FEDERAL PROJECT PAGE 53 Call Order : 017 CONTRACT ID : 0210847 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S302-0009/00-011.15 00 00NH 0009 156 E00 COUNTIES : BERKELEY DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 REHABILITATION-RESTORATION-RESURFACING 0215 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 380.000 TN AA1 0220 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 361.000 TN AA2 0225 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 5,230.000 TN BB1 GRAVEL 0230 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 4,969.000 TN BB2 0235 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 3,990.000 TN CC1 GRAVEL, TYPE 1 0240 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 3,791.000 TN CC2 1 FEDERAL PROJECT PAGE 54 Call Order : 018 CONTRACT ID : 0400801 Letting Date : 04/06/04 10:00 A.M. PROJECTS : E320-0027/00-S11.03 00 00ER 1103 002 000 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 204001-000 MOBILIZATION LUMP LUMP 0010 408002-001 BITUMINOUS MATERIAL 13.000 GA 0015 415005-001 REMOVE EXISTING PAVEMENT SURFACE 69.000 SY 0020 607001-001 TYPE 1 GUARDRAIL, CLASS II 162.500 LF 0025 614001-008 HP12X74 STEEL PILE 1,650.000 LF 0030 614004-001 TIMBER LAGGING 80.000 SF 0035 636011-001 TRAFFIC CONTROL DEVICE 3,620.000 UN 0040 636014-001 FLAGGER 200.000 HR 0045 636025-001 WARNING LIGHTS, TYPE B 120.000 DA 0050 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0055 642012-001 SILT FENCE 200.000 LF 0060 652003-002 SEED MIXTURE, D 10.000 LB 0065 652004-001 STRAW OR HAY MULCH 0.100 TN 0070 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1 55.000 TN AA1 0075 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1 50.000 TN AA2 0080 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 7 191.000 TN BB1 0085 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 7 174.000 TN BB2 0090 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE II 15.000 TN CC1 0095 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE II 14.000 TN CC2 0100 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 23.000 TN DD1 TYPE I 0105 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE I 21.000 TN DD2 1 FEDERAL PROJECT PAGE 55 Call Order : 019 CONTRACT ID : 0326143 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S321-0079/00-102.32 00 00IM 0792 127 E00 COUNTIES : LEWIS DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING AND SAFETY MODIFICATIONS. 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER JOB ORDER (TEMPORARY MARKINGS) 1.000 EA 0015 204003-000 MOBILIZATION, PER JOB ORDER (PERMANENT MARKINGS) 1.000 EA 0020 207001-001 UNCLASSIFIED EXCAVATION 79.000 CY 0025 408002-001 BITUMINOUS MATERIAL 5,905.000 GA 0030 415005-001 REMOVE EXISTING PAVEMENT SURFACE 2,500.000 SY 0035 607001-001 TYPE 1 GUARDRAIL, CLASS 1 1,737.500 LF 0040 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 9.000 EA 0045 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 8,868.750 LF 0050 607010-020 GUARDRAIL REMOVAL 1,131.250 LF 0055 607023-001 MODIFIED CUT SLOPE TERMINAL, TYPE A 9.000 EA 0060 607030-001 SPECIAL TRAILING END TERMINAL 2.000 EA 0065 607035-001 GUARDRAIL ELEMENT 11.000 EA 0070 607065-001 FLARED END TERMINAL 14.000 EA 0075 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 106,780.000 LF 0080 636009-001 TEMPORARY PAVEMENT MARKING-TAPE 4 IN SOLID LINE 8,000.000 LF 0085 636011-001 TRAFFIC CONTROL DEVICE 28,770.000 UN 0090 636012-010 PROJECT TRAFFIC CONTROL DEVICE CLEANING 4.000 EA 0095 636013-001 INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING 425.000 EA 0100 636014-001 FLAGGER 300.000 HR 0105 636014-002 TRAFFIC DIRECTOR 300.000 HR 1 FEDERAL PROJECT PAGE 56 Call Order : 019 CONTRACT ID : 0326143 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S321-0079/00-102.32 00 00IM 0792 127 E00 COUNTIES : LEWIS DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING AND SAFETY MODIFICATIONS. 0110 636021-001 ELECTRIC ARROW 80.000 DA 0115 636022-001 CHANGAEBLE MESSAGE SIGN 80.000 DA 0120 636025-001 WARNING LIGHTS, TYPE B 1,000.000 DA 0125 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0130 657008-001 2.00 LB CHANNEL POST 96.000 LF 0135 661004-001 DELINEATOR, REFLEX REFLECTOR, SINGLE, WHITE 173.000 EA 0140 661004-001 DELINEATOR, REFLEX REFLECTOR, SINGLE, YELLOW 8.000 EA 0145 661013-001 PLASTIC DELINEATOR POST, WHITE 97.000 EA 0150 663001-004 EDGE LINE, TYPE II (PERMANENT WHITE) 48,780.000 LF 0155 663001-004 EDGE LINE, TYPE II (PERMANENT YELLOW) 47,190.000 LF 0160 663002-005 LANE LINE OR CENTERLINE, TYPE II (PERMANENT WHITE) 10,810.000 LF 0165 663005-010 STOP LINE, TYPE V 50.000 LF 0167 663007-010 STRIPE, TYPE V 24" 750.000 LF 0170 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 LOW PROFILE 720.000 EA 0175 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 3,025.000 TN AA1 0180 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 2,725.000 TN AA2 0185 401001-011 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, 153.000 TN BB1 TYPE 19 0190 401001-012 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 19 135.000 TN BB2 0195 401007-011 SUPERPAVE HOT-MIX ASPHALT SCRATCH COURSE, STONE OR 3,200.000 TN CC1 GRAVEL 0200 401007-012 SUPERPAVE HOT-MIX ASPHALT SCRATCH COURSE, SLAG 2,880.000 TN CC2 0205 402001-011 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 17,280.000 TN DD1 GRAVEL, TYPE 9.5 1 FEDERAL PROJECT PAGE 57 Call Order : 019 CONTRACT ID : 0326143 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S321-0079/00-102.32 00 00IM 0792 127 E00 COUNTIES : LEWIS DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING AND SAFETY MODIFICATIONS. 0210 402001-012 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, 15,550.000 TN DD2 SLAG, TYPE 9.5 1 FEDERAL PROJECT PAGE 58 Call Order : 020 CONTRACT ID : 0334441 Letting Date : 04/06/04 10:00 A.M. PROJECTS : E323-0119/90-Q06.03 00 00ER 0603 009 E00 COUNTIES : LOGAN GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 PILING WALL 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 18.000 CY 0015 211003-000 SELECT BORROW EXCAVATION 56.000 CY 0020 604001-016 18 INCH METALLIC COATED CORRUGATED STEEL PIPE, 5.000 LF 0025 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 137.500 LF 0030 607035-001 GUARDRAIL ELEMENT 4.000 EA 0035 607040-001 8X6X14 IN TREATED WOOD BLOCK 10.000 EA 0040 607046-001 7 INCH ROUND X 6 FT TREATED WOOD POST 10.000 EA 0045 614001-001 HP8X36 STEEL PILE 570.000 LF 0050 614003-001 CONCRETE LAGGING, THICKNESS 6 IN. 520.000 SF 0055 636011-001 TRAFFIC CONTROL DEVICE 2,520.000 UN 0060 636014-001 FLAGGER 240.000 HR 0065 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0070 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 25.000 TN AA1 0075 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 24.000 TN AA2 0080 636002-001 AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 25.000 TN BB1 0085 636002-002 AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 24.000 TN BB2 1 FEDERAL PROJECT PAGE 59 Call Order : 021 CONTRACT ID : 0333945 Letting Date : 04/06/04 10:00 A.M. PROJECTS : E324-0003/00-S11.03 00 00ER 1103 006 E00 COUNTIES : MCDOWELL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 REPAIR SLIPS (PILING) (2 SITES) 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 123.000 CY 0020 212005-000 SELECT MATERIAL FOR BACKFILLING 228.000 CY 0025 229001-000 SHOULDER AND DITCH 0.050 MI 0030 601002-001 CLASS B CONCRETE DUMPED ROCK GUTTER STABILIZATION 2.000 CY 0035 601002-001 CLASS B CONCRETE TYPE F TRENCH & TRENCH REFILLING 35.000 CY 0040 604001-016 18 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 193.000 LF 0045 605014-001 MODIFIED INLET, TYPE G 2.000 EA 0050 607010-001 TYPE 1 GUARDRAIL REMOVED AND STORED 62.500 LF 0055 614001-003 HP10X42 STEEL PILE 1,500.000 LF 0060 614004-001 TIMBER LAGGING 1,049.000 SF 0065 633001-001 CONCRETE GUTTER 7.000 SY 0070 633003-001 DUMPED ROCK GUTTER 40.000 CY 0075 636011-001 TRAFFIC CONTROL DEVICE 3,720.000 UN 0080 636014-001 FLAGGER 510.000 HR 0085 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1 78.000 TN AA1 0090 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1 73.000 TN AA2 1 FEDERAL PROJECT PAGE 60 Call Order : 022 CONTRACT ID : 0333946 Letting Date : 04/06/04 10:00 A.M. PROJECTS : E324-0003/06-S11.03 00 FEMA 1500 000 000 COUNTIES : MCDOWELL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 REPAIR SLIP (PILING WALL) 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 58.000 CY 0020 212005-000 SELECT MATERIAL FOR BACKFILLING 71.000 CY 0025 229001-000 SHOULDER AND DITCH 0.040 MI 0030 601002-001 CLASS B CONCRETE 6.000 CY 0035 604010-003 17X13 INCH METALLIC COATED CORRUGATED STEEL PIPE ARCH, A2 23.000 LF 0040 614001-003 HP10X42 STEEL PILE 1,120.000 LF 0045 614004-001 TIMBER LAGGING 563.000 SF 0050 636011-001 TRAFFIC CONTROL DEVICE 680.000 UN 0051 636014-001 FLAGGER 260.000 HR 0055 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1 31.000 TN AA1 0060 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1 29.000 TN AA2 1 FEDERAL PROJECT PAGE 61 Call Order : 023 CONTRACT ID : 0333944 Letting Date : 04/06/04 10:00 A.M. PROJECTS : E324-0052/01-S11.03 00 FEMA 1500 000 000 COUNTIES : MCDOWELL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SLIP REPAIR (PILING WALL) 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 49.000 CY 0020 212005-000 SELECT MATERIAL FOR BACKFILLING 102.000 CY 0025 229001-000 SHOULDER AND DITCH 0.020 MI 0030 614001-003 HP10X42 STEEL PILE 589.000 LF 0035 614004-001 TIMBER LAGGING 634.000 SF 0040 636011-001 TRAFFIC CONTROL DEVICE 1,580.000 UN 0045 636014-001 FLAGGER 150.000 HR 0050 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1 29.000 TN AA1 0055 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1 27.000 TN AA2 1 STATE PROJECT PAGE 62 Call Order : 024 CONTRACT ID : 0404102 Letting Date : 04/06/04 10:00 A.M. PROJECTS : E325-0250/00-003.40 02 COUNTIES : MARION GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/14/04 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 REPLACE CULVERT 0005 604054-124 36 INCH JACKED CONDUIT, A36 STEEL PIPE, 0.5" WALL THICKNESS 70.000 LF 1 FEDERAL PROJECT PAGE 63 Call Order : 025 CONTRACT ID : 0311843 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S328-0077/00-005.48 00 00IM 0771 049 E00 COUNTIES : MERCER DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 4R-RESURFACING, GUARDRAIL, SHOULDER & DRAINAGE 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER 3 DAY TEMPORARY 1.000 EA 0015 204003-000 MOBILIZATION, PER PERMANENT 1.000 EA 0020 207001-001 UNCLASSIFIED EXCAVATION 31.000 CY 0025 211008-000 ROCK BORROW EXCAVATION 60.000 TN 0030 211008-000 ROCK BORROW EXCAVATION 5.000 TN 0035 229001-000 SHOULDER AND DITCH 3.400 MI 0040 408002-001 BITUMINOUS MATERIAL 2,431.000 GA 0045 415005-001 REMOVE EXISTING PAVEMENT SURFACE 822.000 SY 0050 605012-001 ADJUST INLET TYPE B 1.000 EA 0055 606020-001 AGGREGATE FILLED FABRIC UNDERDRAIN, 46.000 LF 0060 606025-002 4 INCH UNDERDRAIN PIPE 15.000 LF 0065 607001-001 TYPE 1 GUARDRAIL, CLASS I 650.000 LF 0070 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 10,275.000 LF 0075 607010-020 GUARDRAIL REMOVAL 12.500 LF 0080 607023-001 MODIFIED CUT SLOPE TERMINAL, TYPE A 2.000 EA 0085 607030-001 SPECIAL TRAILING END TERMINAL 1.000 EA 0090 607030-002 SPECIAL TRAILING END TERMINAL, REMOVED AND RESET 2.000 EA 0095 607035-001 GUARDRAIL ELEMENT 40.000 EA 0100 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 17,823.000 LF 0105 636011-001 TRAFFIC CONTROL DEVICE 8,715.000 UN 1 FEDERAL PROJECT PAGE 64 Call Order : 025 CONTRACT ID : 0311843 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S328-0077/00-005.48 00 00IM 0771 049 E00 COUNTIES : MERCER DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 4R-RESURFACING, GUARDRAIL, SHOULDER & DRAINAGE 0115 636014-002 TRAFFIC DIRECTOR 240.000 HR 0120 636021-001 ELECTRIC ARROW 22.000 DA 0125 642004-002 SEED MIXTURE, B 196.000 LB 0126 642005-002 MULCH, WOOD CELLULOSE FIBER 1.500 TN 0130 642006-001 FERTILIZER 0.800 TN 0135 642031-001 DITCH CHECK 20.000 EA 0140 663001-005 EDGE LINE, TYPE II YELLOW 7.100 MI 0145 663001-005 EDGE LINE, TYPE II WHITE 7.960 MI 0150 663002-004 LANE LINE OR CENTERLINE, TYPE II WHITE 1.640 MI 0155 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 223.000 EA 0160 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1 15.000 TN AA1 0165 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1 14.000 TN AA2 0170 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 212.000 TN BB1 0175 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 197.000 TN BB2 0180 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 1 41.000 TN CC1 0185 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 1 39.000 TN CC2 0190 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE II 6,922.000 TN DD1 0195 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE II 6,576.000 TN DD2 0200 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 1,461.000 TN EE1 TYPE I 0205 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 1 1,388.000 TN EE2 0210 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 1,483.000 TN FF1 1 FEDERAL PROJECT PAGE 65 Call Order : 025 CONTRACT ID : 0311843 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S328-0077/00-005.48 00 00IM 0771 049 E00 COUNTIES : MERCER DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 4R-RESURFACING, GUARDRAIL, SHOULDER & DRAINAGE 0215 401007-002 MARSHALL SCRATCH COURSE, SLAG 1,409.000 TN FF2 0220 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 3,349.000 TN GG1 GRAVEL, TYPE 1 0225 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 3,182.000 TN GG2 1 FEDERAL PROJECT PAGE 66 Call Order : 026 CONTRACT ID : 0402742 Letting Date : 04/06/04 10:00 A.M. PROJECTS : E345-0007/06-P02.03 00 FEMA 1455 000 000 COUNTIES : SUMMERS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: GREG HYLTON, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 PILING WALL W/TIMBER LAGGING 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 43.000 CY 0020 614001-058 W8X31 STEEL PILE 594.000 LF 0025 614004-001 TIMBER LAGGING 584.000 SF 0030 636011-001 TRAFFIC CONTROL DEVICE 1,480.000 UN 0035 636014-001 FLAGGER 192.000 HR 0040 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0045 642012-001 SILT FENCE 154.000 LF 0050 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 7 55.000 TN AA1 0055 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 7 50.000 TN AA2 0060 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 14.000 TN BB1 0065 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 13.000 TN BB2 1 FEDERAL PROJECT PAGE 67 Call Order : 027 CONTRACT ID : 0402840 Letting Date : 04/06/04 10:00 A.M. PROJECTS : E345-0010/00-S11.03 00 FEMA 1500 000 0 COUNTIES : SUMMERS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: GREG HYLTON, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RECONSTRUCT W/PILING 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 46.000 CY 0020 614001-001 HP8X36 STEEL PILE 528.000 LF 0025 614004-001 TIMBER LAGGING 708.000 SF 0030 636011-001 TRAFFIC CONTROL DEVICE 1,480.000 UN 0035 636014-001 FLAGGER 192.000 HR 0040 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0045 642012-001 SILT FENCE 150.000 LF 0050 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 7 132.000 TN AA1 0055 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 7 120.000 TN AA2 0060 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 21.000 TN BB1 0065 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 19.000 TN BB2 1 FEDERAL PROJECT PAGE 68 Call Order : 028 CONTRACT ID : 0403340 Letting Date : 04/06/04 10:00 A.M. PROJECTS : E345-0020/00-S11.03 03 00ER 1103 004 COUNTIES : SUMMERS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/14/04 RES. ENG.: GREG HYLTON, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER JOB ORDER (14-DAY TEMP. PVMT. MARKING) 1.000 EA 0015 204003-000 MOBILIZATION, PER JOB ORDER (PERMANENT PAVEMENT MARKING) 1.000 EA 0020 307010-001 RECONDITIONING ROADWAY 4,770.000 SY 0025 408002-001 BITUMINOUS MATERIAL 27.000 GA 0030 607001-001 TYPE 1 GUARDRAIL, CLASS 1 1,550.000 LF 0035 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 250.000 LF 0040 607010-020 GUARDRAIL REMOVAL 50.000 LF 0045 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE (WHITE) 3,662.000 LF 0050 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE (YELLOW) 3,662.000 LF 0055 636011-001 TRAFFIC CONTROL DEVICE 720.000 UN 0060 636014-001 FLAGGER 168.000 HR 0065 637001-001 WATER FOR DUST PALLIATIVE 2.000 MG 0070 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0075 663001-004 EDGE LINE, TYPE II (WHITE) 3,662.000 LF 0080 663002-005 LANE LINE OR CENTERLINE, TYPE II (YELLOW) 3,662.000 LF 0085 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 875.000 TN AA1 0090 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 797.000 TN AA2 0095 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE I 940.000 TN BB1 0100 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE I 856.000 TN BB2 0105 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE II 86.000 TN CC1 1 FEDERAL PROJECT PAGE 69 Call Order : 028 CONTRACT ID : 0403340 Letting Date : 04/06/04 10:00 A.M. PROJECTS : E345-0020/00-S11.03 03 00ER 1103 004 COUNTIES : SUMMERS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/14/04 RES. ENG.: GREG HYLTON, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE II 79.000 TN CC2 0115 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 225.000 TN DD1 TYPE I 0120 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE I 205.000 TN DD2 1 STATE PROJECT PAGE 70 Call Order : 029 CONTRACT ID : 0323040 Letting Date : 04/06/04 10:00 A.M. PROJECTS : U350-0152/00-030.81 02 0NFA 0152 035 000 COUNTIES : WAYNE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/11/04 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 REPAIR DRAINAGE 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER PERMANENT PAVEMENT MARKINGS 1.000 EA 0015 204003-000 MOBILIZATION, PER 3-DAY, TEMPORARY PAVEMENT MARKINGS 1.000 EA 0020 207001-001 UNCLASSIFIED EXCAVATION 138.000 CY 0025 211002-000 ROCK BORROW EXCAVATION 186.000 CY 0030 307001-000 AGGREGATE BASE COURSE, CLASS 1 80.000 CY 0035 408002-001 BITUMINOUS MATERIAL 75.000 GA 0040 604001-012 15 INCH METALLIC COATED CORRUGATED STEEL PIPE, 70.000 LF 0045 604001-016 18 INCH METALLIC COATED CORRUGATED STEEL PIPE, 110.000 LF 0050 604001-020 24 INCH METALLIC COATED CORRUGATED STEEL PIPE, 151.000 LF 0055 605009-001 TYPE G INLET 1.000 EA 0060 605014-001 MODIFIED INLET, TYPE G 2.000 EA 0065 607001-001 TYPE 1 GUARDRAIL, CLASS 1 337.500 LF 0070 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 137.500 LF 0075 607010-001 TYPE 1 GUARDRAIL REMOVED AND STORED 337.500 LF 0080 607035-001 GUARDRAIL ELEMENT 3.000 EA 0085 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 400.000 LF 0090 636011-001 TRAFFIC CONTROL DEVICE 1,870.000 UN 0095 636014-001 FLAGGER 240.000 HR 0100 642012-001 SILT FENCE 50.000 LF 0105 642031-001 DITCH CHECK 4.000 EA 1 STATE PROJECT PAGE 71 Call Order : 029 CONTRACT ID : 0323040 Letting Date : 04/06/04 10:00 A.M. PROJECTS : U350-0152/00-030.81 02 0NFA 0152 035 000 COUNTIES : WAYNE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/11/04 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 REPAIR DRAINAGE 0110 663001-005 EDGE LINE, TYPE II WHITE 0.100 MI 0115 663002-004 LANE LINE OR CENTERLINE, TYPE II YELLOW 0.100 MI 0120 663005-010 STOP LINE, TYPE V 20.000 LF 0125 663015-005 RAILROAD CROSSING MARKING, TYPE V 1.000 EA 0130 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 53.000 TN AA1 0135 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 48.000 TN AA2 0140 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 1 69.000 TN BB1 0145 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 1 63.000 TN BB2 0150 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 75.000 TN CC1 GRAVEL 0155 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 68.000 TN CC2 0160 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 236.000 TN DD1 GRAVEL, TYPE 4 0165 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 4 215.000 TN DD2 0170 401011-002 HOT-MIX ASPHALT FOR PAVED GUTTER, SLAG, TYPE 4 40.000 TN EE1 0175 401011-002 HOT-MIX ASPHALT FOR PAVED GUTTER, SLAG, TYPE 4 36.000 TN EE2 1 FEDERAL PROJECT PAGE 72 Call Order : 030 CONTRACT ID : 0314141 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S354-0077/00-165.18 00 00IM 0773 359 E00 COUNTIES : WOOD DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SAULSBURY - MINERALWELLS ROAD 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER 3-DAY TEMPORARY PAVEMENT MARKING 1.000 EA 0015 204003-000 MOBILIZATION, PER PERMANENT PAVEMENT MARKING 1.000 EA 0020 408002-001 BITUMINOUS MATERIAL 6,192.000 GA 0025 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 225,878.000 LF 0030 636011-001 TRAFFIC CONTROL DEVICE 23,770.000 UN 0035 636014-001 FLAGGER 50.000 HR 0040 636021-001 ELECTRIC ARROW 44.000 DA 0045 636025-001 WARNING LIGHTS, TYPE B 3,872.000 DA 0050 663001-005 EDGE LINE, TYPE II YELLOW 9.060 MI 0055 663001-005 EDGE LINE, TYPE II 9.810 MI 0060 663002-004 LANE LINE OR CENTERLINE, TYPE II 2.520 MI 0065 663007-010 STRIPE, TYPE V 8" 148.000 LF 0070 663007-010 STRIPE, TYPE V 24" 1,478.000 LF 0075 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 787.000 EA 0080 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 3,509.000 TN AA1 0085 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 3,194.000 TN AA2 0090 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 4,106.000 TN BB1 0095 401007-002 MARSHALL SCRATCH COURSE, SLAG 3,737.000 TN BB2 0100 401017-001 HOT-MIX ASPHALT POTHOLE REPAIR, STONE OR GRAVEL, TYPE II 50.000 TN CC1 0105 401017-002 HOT-MIX ASPHALT POTHOLE REPAIR, SLAG, TYPE II 46.000 TN CC2 1 FEDERAL PROJECT PAGE 73 Call Order : 030 CONTRACT ID : 0314141 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S354-0077/00-165.18 00 00IM 0773 359 E00 COUNTIES : WOOD DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SAULSBURY - MINERALWELLS ROAD 0110 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 11,355.000 TN DD1 GRAVEL, TYPE I 0115 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE I 10,334.000 TN DD2 1 FEDERAL PROJECT PAGE 74 Call Order : 031 CONTRACT ID : 0333947 Letting Date : 04/06/04 10:00 A.M. PROJECTS : E355-0010/00-S11.03 00 00ER 1103 005 E00 COUNTIES : WYOMING GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 REPAIR SLIP (PILING WALL) 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 276.000 CY 0020 212005-000 SELECT MATERIAL FOR BACKFILLING 457.000 CY 0025 229001-000 SHOULDER AND DITCH 0.080 MI 0030 614001-006 HP12X53 STEEL PILE 1,680.000 LF 0035 614004-001 TIMBER LAGGING 2,350.000 SF 0040 636011-001 TRAFFIC CONTROL DEVICE 1,880.000 UN 0045 636014-001 FLAGGER 360.000 HR 0050 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1 77.000 TN AA1 0055 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1 72.000 TN AA2 1 FEDERAL PROJECT PAGE 75 Call Order : 032 CONTRACT ID : 0333942 Letting Date : 04/06/04 10:00 A.M. PROJECTS : E355-0014/00-S11.03 00 00ER 1103 005 E00 COUNTIES : WYOMING GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CORRECT SLIP (PILING) 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 139.000 CY 0020 212005-000 SELECT MATERIAL FOR BACKFILLING 160.000 CY 0025 229001-000 SHOULDER AND DITCH 0.190 MI 0030 601002-001 CLASS B CONCRETE 18.000 CY 0035 604001-016 18 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 32.000 LF 0040 607010-001 TYPE 1 GUARDRAIL REMOVED AND STORED 112.500 LF 0045 614001-003 HP10X42 STEEL PILE 580.000 LF 0050 614004-001 TIMBER LAGGING 1,068.000 SF 0055 633003-001 DUMPED ROCK GUTTER 32.000 CY 0060 636011-001 TRAFFIC CONTROL DEVICE 2,920.000 UN 0065 636014-001 FLAGGER 280.000 HR 0070 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1 (PILING WALL) 39.000 TN AA1 0075 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1 (PILING WALL) 36.000 TN AA2 0080 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1(ROAD STABILIZATION) 89.000 TN BB1 0085 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1(ROAD STABILIZATION) 83.000 TN BB2 1 FEDERAL PROJECT PAGE 76 Call Order : 033 CONTRACT ID : 0333948 Letting Date : 04/06/04 10:00 A.M. PROJECTS : E355-0085/00-S11.03 00 00ER 1103 005 E00 COUNTIES : WYOMING GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SLIP REPAIR (PILING WALL) 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 85.000 CY 0020 212005-000 SELECT MATERIAL FOR BACKFILLING 99.000 CY 0025 229001-000 SHOULDER AND DITCH 0.190 MI 0030 607010-001 TYPE 1 GUARDRAIL REMOVED AND STORED 137.500 LF 0035 614001-003 HP10X42 STEEL PILE 960.000 LF 0040 614004-001 TIMBER LAGGING 721.000 SF 0045 636011-001 TRAFFIC CONTROL DEVICE 2,580.000 UN 0050 636014-001 FLAGGER 270.000 HR 0055 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1 44.000 TN AA1 0060 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1 41.000 TN AA2 1 FEDERAL PROJECT PAGE 77 Call Order : 034 CONTRACT ID : 0326145 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S317-0079/00-114.00 00 00IM 0793 194 E00 COUNTIES : HARRISON DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER JOB ORDER (TEMPORARY MARKINGS) 1.000 EA 0015 204003-000 MOBILIZATION, PER JOB ORDER (PERMANENT) 1.000 EA 0020 408002-001 BITUMINOUS MATERIAL 5,025.000 GA 0025 415005-001 REMOVE EXISTING PAVEMENT SURFACE 7,311.000 SY 0030 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 17,600.000 LF 0035 607010-020 GUARDRAIL REMOVAL 775.000 LF 0040 607065-001 FLARED END TERMINAL 14.000 EA 0045 607066-001 TANGENT END TERMINAL 5.000 EA 0050 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 207,520.000 LF 0055 636009-001 TEMPORARY PAVEMENT MARKING-TAPE 4 IN SOLID LINE 8,000.000 LF 0060 636011-001 TRAFFIC CONTROL DEVICE 81,420.000 UN 0065 636012-010 PROJECT TRAFFIC CONTROL DEVICE CLEANING 4.000 EA 0070 636013-001 INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING 425.000 EA 0075 636014-001 FLAGGER 600.000 HR 0080 636014-002 TRAFFIC DIRECTOR 600.000 HR 0085 636021-001 ELECTRIC ARROW 80.000 DA 0090 636022-001 CHANGAEBLE MESSAGE SIGN 80.000 DA 0095 636025-001 WARNING LIGHTS, TYPE B 1,000.000 DA 0100 636026-001 TEMPORARY LIGHTING LUMP LUMP 0105 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 1 FEDERAL PROJECT PAGE 78 Call Order : 034 CONTRACT ID : 0326145 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S317-0079/00-114.00 00 00IM 0793 194 E00 COUNTIES : HARRISON DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 657008-001 2.00 LB CHANNEL POST 834.000 LF 0115 661004-001 DELINEATOR, REFLEX REFLECTOR, SINGLE, WHITE 139.000 EA 0120 661004-001 DELINEATOR, REFLEX REFLECTOR, SINGLE, YELLOW 40.000 EA 0125 661013-001 PLASTIC DELINEATOR POST, WHITE 166.000 EA 0130 663001-019 EDGE LINE, TYPE IX WHITE 55,510.000 LF 0135 663001-019 EDGE LINE, TYPE IX YELLOW 48,250.000 LF 0140 663001-019 EDGE LINE, TYPE IX WHITE 10,520.000 LF 0145 663005-010 STOP LINE, TYPE V 150.000 LF 0150 663007-010 STRIPE, TYPE V 3,355.000 LF 0155 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 LOW PROFILE 695.000 EA 0160 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 4,350.000 TN AA1 0165 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 3,915.000 TN AA2 0170 401007-011 SUPERPAVE HOT-MIX ASPHALT SCRATCH COURSE, STONE OR 3,373.000 TN BB1 GRAVEL 0175 401007-012 SUPERPAVE HOT-MIX ASPHALT SCRATCH COURSE, SLAG 3,035.000 TN BB2 0180 402001-011 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 12,447.000 TN CC GRAVEL, TYPE 9.5 0185 402001-012 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, 11,202.000 TN CC2 SLAG, TYPE 9.5 1 FEDERAL PROJECT PAGE 79 Call Order : 035 CONTRACT ID : 0311351 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S320-0060/00-025.71 00 0STP 0060 189 E00 COUNTIES : KANAWHA DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER PERMANENT 1.000 EA 0015 204003-000 MOBILIZATION, PER 3 DAY TEMPORARY 2.000 EA 0020 229001-000 SHOULDER AND DITCH 2.600 MI 0025 240002-000 CLEAN INLET 1.000 EA 0030 408002-001 BITUMINOUS MATERIAL 2,500.000 GA 0035 415005-001 REMOVE EXISTING PAVEMENT SURFACE 83,065.000 SY 0040 601046-001 MODIFIED CONCRETE END POST 6.000 EA 0045 605012-001 ADJUST INLET TYPE D 2.000 EA 0050 607001-001 TYPE 1 GUARDRAIL, CLASS I 12,930.000 LF 0055 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 6.000 EA 0060 607010-020 GUARDRAIL REMOVAL 12,747.000 LF 0065 607025-001 CUT SLOPE TERMINAL, TYPE A 4.000 EA 0070 607030-001 SPECIAL TRAILING END TERMINAL 3.000 EA 0075 607065-001 FLARED END TERMINAL 6.000 EA 0080 636006-001 PILOT TRUCK AND DRIVER 30.000 DA 0085 636011-001 TRAFFIC CONTROL DEVICE 13,000.000 UN 0090 636014-001 FLAGGER 250.000 HR 0095 636021-001 ELECTRIC ARROW 56.000 DA 0100 636022-001 CHANGAEBLE MESSAGE SIGN 66.000 DA 0105 636025-001 WARNING LIGHTS, TYPE B 300.000 DA 1 FEDERAL PROJECT PAGE 80 Call Order : 035 CONTRACT ID : 0311351 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S320-0060/00-025.71 00 0STP 0060 189 E00 COUNTIES : KANAWHA DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 642031-001 DITCH CHECK 40.000 EA 0115 652003-001 SEED MIXTURES, B, C-1, OR C-2 B 420.000 LB 0120 652004-002 WOOD CELLULOSE FIBER MULCH 0.700 TN 0125 663001-005 EDGE LINE, TYPE II WHITE 15.900 MI 0130 663001-005 EDGE LINE, TYPE II YELLOW 15.600 MI 0135 663002-004 LANE LINE OR CENTERLINE, TYPE II WHITE 3.900 MI 0140 663005-010 STOP LINE, TYPE V 24" 50.000 LF 0145 663007-010 STRIPE, TYPE V 24" 1,062.000 LF 0150 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 425.000 EA 0155 402001-011 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 9,500.000 TN AA1 GRAVEL, TYPE 9.5 0160 402001-012 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, 8,636.000 TN AA2 SLAG, TYPE 9.5 0165 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 1,338.000 TN BB1 0170 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 1,216.000 TN BB2 0175 401001-011 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, 600.000 TN CC1 TYPE 37.5 0180 401001-012 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 37.5 545.000 TN CC2 1 FEDERAL PROJECT PAGE 81 Call Order : 036 CONTRACT ID : 0310145 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S324-0016/00-014.29 00 0STP 0016 158 E00 COUNTIES : MCDOWELL DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R-RESURFACING, GUARDRAIL, SHOULDERS & DRAINAGE 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER 3 DAY TEMPORARY 1.000 EA 0015 204003-000 MOBILIZATION, PER PERMANENT 1.000 EA 0020 229001-000 SHOULDER AND DITCH 2.590 MI 0025 408002-001 BITUMINOUS MATERIAL 1,100.000 GA 0030 605009-001 TYPE G INLET 5.000 EA 0035 607001-001 TYPE 1 GUARDRAIL, CLASS 1 150.000 LF 0040 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 775.000 LF 0045 607010-020 GUARDRAIL REMOVAL 375.000 LF 0050 607035-001 GUARDRAIL ELEMENT 30.000 EA 0055 636006-001 PILOT TRUCK AND DRIVER 10.000 DA 0060 636011-001 TRAFFIC CONTROL DEVICE 3,580.000 UN 0065 636014-001 FLAGGER 288.000 HR 0070 642004-002 SEED MIXTURE, B 200.000 LB 0075 642005-002 MULCH, WOOD CELLULOSE FIBER 1.500 TN 0080 642006-001 FERTILIZER 1.000 TN 0085 642031-001 DITCH CHECK 18.000 EA 0090 663001-005 EDGE LINE, TYPE II WHITE 10.500 MI 0095 663003-005 BARRIER LINE, TYPE II YELLOW 54,800.000 LF 0100 663004-004 CHANNELIZING LINE, TYPE II WHITE, 8" 750.000 LF 0105 663005-010 STOP LINE, TYPE V WHITE, 24" 25.000 LF 1 FEDERAL PROJECT PAGE 82 Call Order : 036 CONTRACT ID : 0310145 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S324-0016/00-014.29 00 0STP 0016 158 E00 COUNTIES : MCDOWELL DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R-RESURFACING, GUARDRAIL, SHOULDERS & DRAINAGE 0110 663007-004 STRIPE, TYPE II WHITE, 12" 600.000 LF 0115 663010-010 LANE ARROW, TYPE V WHITE 4.000 EA 0120 663015-005 RAILROAD CROSSING MARKING, TYPE V 2.000 EA 0125 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 1,400.000 TN AA1 0130 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 1,274.000 TN AA2 0135 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 950.000 TN BB1 0140 401007-002 MARSHALL SCRATCH COURSE, SLAG 865.000 TN BB2 0145 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 1,925.000 TN CC1 GRAVEL, TYPE 1 0150 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 1,752.000 TN CC2 1 FEDERAL PROJECT PAGE 83 Call Order : 037 CONTRACT ID : 0403645 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S335-0070/00-005.79 00 00IM 0701 142 E00 COUNTIES : OHIO DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, GUARDRAIL 0005 204001-000 MOBILIZATION PROJECT LUMP LUMP 0010 204003-000 MOBILIZATION, PER PERM. PAINT 1.000 EA 0015 204003-000 MOBILIZATION, PER TEMP. PAINT 1.000 EA 0020 204003-000 MOBILIZATION, PER TEMP. PAINT, ROTOMILL 1.000 EA 0025 408002-001 BITUMINOUS MATERIAL 4,050.000 GA 0030 415005-001 REMOVE EXISTING PAVEMENT SURFACE 134,988.000 SY 0035 415005-001 REMOVE EXISTING PAVEMENT SURFACE RUMBLE STRIPS 8,584.000 SY 0040 601046-001 MODIFIED CONCRETE END POST 2.000 EA 0045 607001-001 TYPE 1 GUARDRAIL, CLASS 1 12.500 LF 0050 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 2.000 EA 0055 607010-020 GUARDRAIL REMOVAL 50.000 LF 0060 636011-001 TRAFFIC CONTROL DEVICE 30,020.000 UN 0065 636014-001 FLAGGER 430.000 HR 0070 636014-002 TRAFFIC DIRECTOR 430.000 HR 0075 636021-001 ELECTRIC ARROW 43.000 DA 0080 636025-001 WARNING LIGHTS, TYPE B 129.000 DA 0085 636028-001 SHADOW VEHICLE 43.000 DA 0090 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0095 661013-001 PLASTIC DELINEATOR POST, WHITE 468.000 EA 0100 661013-001 PLASTIC DELINEATOR POST, YELLOW 15.000 EA 0105 661020-001 DELINEATOR, TYPE B-1 4.000 EA 1 FEDERAL PROJECT PAGE 84 Call Order : 037 CONTRACT ID : 0403645 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S335-0070/00-005.79 00 00IM 0701 142 E00 COUNTIES : OHIO DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, GUARDRAIL 0110 663001-005 EDGE LINE, TYPE II TEMP., WHITE, ROTOMILL 8.450 MI 0115 663001-005 EDGE LINE, TYPE II TEMP., YELLOW 7.740 MI 0120 663001-005 EDGE LINE, TYPE II TEMP., YELLOW, ROTOMILL 7.740 MI 0125 663001-005 EDGE LINE, TYPE II WHITE 8.450 MI 0130 663001-018 EDGE LINE, TYPE IX PERM., WHITE 8.450 MI 0135 663001-018 EDGE LINE, TYPE IX PERM., YELLOW 7.740 MI 0140 663002-004 LANE LINE OR CENTERLINE, TYPE II TEMP., WHITE 2.220 MI 0145 663002-004 LANE LINE OR CENTERLINE, TYPE II TEMP., WHITE, ROTOMILL 2.220 MI 0150 663002-018 LANE LINE OR CENTERLINE, TYPE IX PERM., WHITE 2.220 MI 0155 663007-010 STRIPE, TYPE V 24", WHITE 300.000 LF 0160 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 LOW-PROFILE 620.000 EA 0165 401001-011 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, 1,364.000 TN AA1 TYPE 25 0170 401001-012 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 25 1,303.000 TN AA2 0175 402001-011 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 10,285.000 TN BB1 GRAVEL, TYPE 9.5 0180 402001-012 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, 9,822.000 TN BB2 SLAG, TYPE 9.5 0185 402001-011 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 1,137.000 TN CC1 GRAVEL, TYPE 12.5 0190 402001-012 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, 1,086.000 TN CC2 SLAG, TYPE 12.5 1 FEDERAL PROJECT PAGE 85 Call Order : 038 CONTRACT ID : 0332940 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S335-0088/00-001.06 00 0STP 0088 028 E00 COUNTIES : OHIO DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, DRAINAGE, GUARDRAIL 0005 204001-000 MOBILIZATION PROJECT LUMP LUMP 0010 204003-000 MOBILIZATION, PER PERM. PAINT 1.000 EA 0015 204003-000 MOBILIZATION, PER TEMP. PAINT, ROTOMILLING 1.000 EA 0020 204003-000 MOBILIZATION, PER TEMP. PAINT, SCRATCH COURSE 1.000 EA 0025 204003-000 MOBILIZATION, PER TEMP. PAINT, WEARING COURSE 1.000 EA 0030 207001-001 UNCLASSIFIED EXCAVATION 55.000 CY 0035 211008-000 ROCK BORROW EXCAVATION 1,538.000 TN 0040 229001-000 SHOULDER AND DITCH 2.570 MI 0045 240001-000 CLEAN CULVERT 24" 654.000 LF 0050 240002-000 CLEAN INLET 13.000 EA 0055 240003-000 CLEAN MANHOLE 1.000 EA 0060 240006-000 CLEAN INLET AND OUTLET DITCH 5.000 LF 0065 408002-001 BITUMINOUS MATERIAL 1,407.000 GA 0070 415005-001 REMOVE EXISTING PAVEMENT SURFACE 7,134.000 SY 0075 601006-001 CLASS D CONCRETE 264.000 CY 0080 604001-012 15 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 10.000 LF 0085 604001-016 18 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 206.000 LF 0090 604001-020 24 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 120.000 LF 0095 604053-012 15 INCH RELAID CONDUIT, 12.000 LF 0100 604053-016 18 INCH RELAID CONDUIT, 6.000 LF 0105 604072-112 15 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 4.000 EA 1 FEDERAL PROJECT PAGE 86 Call Order : 038 CONTRACT ID : 0332940 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S335-0088/00-001.06 00 0STP 0088 028 E00 COUNTIES : OHIO DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, DRAINAGE, GUARDRAIL 0110 604072-116 18 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 2.000 EA 0115 605001-001 TYPE A MANHOLE 1.000 EA 0120 605004-001 TYPE B INLET 1.000 EA 0125 605009-001 TYPE G INLET 2.000 EA 0130 605012-001 ADJUST INLET TYPE B 3.000 EA 0135 605012-001 ADJUST INLET TYPE F 1.000 EA 0140 605015-001 ADJUST MANHOLE TYPE A 4.000 EA 0145 607001-001 TYPE 1 GUARDRAIL, CLASS II 4,466.000 LF 0150 607001-001 TYPE 1 GUARDRAIL, CLASS III 287.500 LF 0155 607010-001 TYPE 1 GUARDRAIL REMOVED AND STORED 4,216.000 LF 0160 607037-001 BUFFER END SECTION 17.000 EA 0165 636011-001 TRAFFIC CONTROL DEVICE 7,340.000 UN 0170 636014-001 FLAGGER 500.000 HR 0175 642004-002 SEED MIXTURE, B 431.000 LB 0180 642005-002 MULCH, WOOD CELLULOSE FIBER 3.300 TN 0185 642006-001 FERTILIZER 2.200 TN 0190 642031-001 DITCH CHECK 32.000 EA 0195 663001-005 EDGE LINE, TYPE II PERM., WHITE 3.570 MI 0200 663001-005 EDGE LINE, TYPE II TEMP., WHITE, SCRATCH COURSE 3.570 MI 0205 663001-005 EDGE LINE, TYPE II TEMP., WHITE, WEARING COURSE 3.570 MI 0210 663002-004 LANE LINE OR CENTERLINE, TYPE II PERM., WHITE, 4" 0.570 MI 1 FEDERAL PROJECT PAGE 87 Call Order : 038 CONTRACT ID : 0332940 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S335-0088/00-001.06 00 0STP 0088 028 E00 COUNTIES : OHIO DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, DRAINAGE, GUARDRAIL 0215 663002-004 LANE LINE OR CENTERLINE, TYPE II PERM., YELLOW 2.930 MI 0220 663002-004 LANE LINE OR CENTERLINE, TYPE II TEMP., WHITE, 4", ROTOMILLING 0.210 MI 0225 663002-004 LANE LINE OR CENTERLINE, TYPE II TEMP., WHITE, 4", SCRATCH COURSE 0.360 MI 0230 663002-004 LANE LINE OR CENTERLINE, TYPE II TEMP., WHITE, 4", WEARING COURSE 0.570 MI 0235 663002-004 LANE LINE OR CENTERLINE, TYPE II TEMP., YELLOW, ROTOMILLING 0.330 MI 0240 663002-004 LANE LINE OR CENTERLINE, TYPE II TEMP., YELLOW, SCRATCH COURSE 2.590 MI 0245 663002-004 LANE LINE OR CENTERLINE, TYPE II TEMP., YELLOW, WEARING COURSE 2.930 MI 0250 663005-010 STOP LINE, TYPE V 12" 20.000 LF 0255 663006-010 CROSSWALK LINE, TYPE V 12" 60.000 LF 0260 663007-010 STRIPE, TYPE V 12", WHITE 420.000 LF 0265 663007-010 STRIPE, TYPE V 12", YELLOW 80.000 LF 0270 663007-010 STRIPE, TYPE V 24", YELLOW 575.000 LF 0275 663010-010 LANE ARROW, TYPE V 26.000 EA 0280 663011-010 LANE LETTER, TYPE V 28.000 EA 0285 670023-001 ADJUSTING VALVE BOX 1.000 EA 0290 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 651.000 TN AA1 0295 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 638.000 TN AA2 0300 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 10 687.000 TN AA3 0305 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 2 108.000 TN BB1 0310 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 2 104.000 TN BB2 0315 401001-003 MARSHALL HOT-MIX ASPHALT BASE COURSE, STEEL SLAG, TYPE 2 114.000 TN BB3 1 FEDERAL PROJECT PAGE 88 Call Order : 038 CONTRACT ID : 0332940 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S335-0088/00-001.06 00 0STP 0088 028 E00 COUNTIES : OHIO DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, DRAINAGE, GUARDRAIL 0320 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 1,154.000 TN CC1 0325 401007-002 MARSHALL SCRATCH COURSE, SLAG 1,102.000 TN CC2 0330 401007-003 MARSHALL SCRATCH COURSE, STEEL SLAG 1,218.000 TN CC3 0335 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 2,549.000 TN DD1 GRAVEL, TYPE 1 0340 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 2,435.000 TN DD2 0345 402001-003 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STEEL 2,690.000 TN DD3 SLAG, TYPE 1 1 FEDERAL PROJECT PAGE 89 Call Order : 039 CONTRACT ID : 0310044 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S344-0119/00-010.52 00 0STP 0119 164 E00 COUNTIES : ROANE DBE GOALS : 7.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WALTON-SPEED ROAD 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER 3-DAY TEMPORARY PAVEMENT MARKING 1.000 EA 0015 204003-000 MOBILIZATION, PER 3-DAY PERMANENT PAVEMENT MARKING 1.000 EA 0020 211008-000 ROCK BORROW EXCAVATION 784.000 TN 0025 218003-000 GABION 105.440 CY 0030 229001-000 SHOULDER AND DITCH 7.110 MI 0035 307001-000 AGGREGATE BASE COURSE, CLASS 1 28.000 CY 0040 408002-001 BITUMINOUS MATERIAL 2,870.000 GA 0045 601002-001 CLASS B CONCRETE 3.200 CY 0050 601046-001 MODIFIED CONCRETE END POST 4.000 EA 0055 604001-012 15 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 235.000 LF 0060 604001-016 18 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 465.000 LF 0065 604001-020 24 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 50.000 LF 0070 604001-024 36 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 55.000 LF 0075 604001-028 48 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 50.000 LF 0080 604010-030 42X29 INCH METALLIC COATED CORRUGATED STEEL PIPE ARCH, A2 45.000 LF 0085 604037-012 15 INCH REINFORCED CONCRETE PIPE, CLASS III 4.000 LF 0090 604041-055 76X48 INCH REINFORCED CONCRETE ELLIPTICAL PIPE, CLASS H 6.000 LF 0095 604053-012 15 INCH RELAID CONDUIT, 60.000 LF 0100 605009-001 TYPE G INLET 2.000 EA 0105 605009-001 TYPE G INLET MODIFIED 15.000 EA 1 FEDERAL PROJECT PAGE 90 Call Order : 039 CONTRACT ID : 0310044 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S344-0119/00-010.52 00 0STP 0119 164 E00 COUNTIES : ROANE DBE GOALS : 7.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WALTON-SPEED ROAD 0107 605041-012 15 INCH SLOT INLET RISER 2" 25.000 LF 0110 607001-001 TYPE 1 GUARDRAIL, CLASS I 11,724.500 LF 0115 607001-001 TYPE 1 GUARDRAIL, CLASS V 125.000 LF 0120 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 4.000 EA 0125 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 3,387.500 LF 0130 607010-001 TYPE 1 GUARDRAIL REMOVED AND STORED 10,162.500 LF 0135 607023-001 MODIFIED CUT SLOPE TERMINAL, TYPE A 1.000 EA 0140 607024-001 MODIFIED CUT SLOPE TERMINAL, REMOVED AND RESET, TYPE A 1.000 EA 0145 607036-001 GUARDRAIL END SHOE 1.000 EA 0150 607065-001 FLARED END TERMINAL 1.000 EA 0155 607066-001 TANGENT END TERMINAL 37.000 EA 0160 622003-001 CANTILEVER MAILBOX SUPPORT 24.000 EA 0165 636006-001 PILOT TRUCK AND DRIVER 47.000 DA 0170 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 291,245.000 LF 0175 636011-001 TRAFFIC CONTROL DEVICE 20,960.000 UN 0180 636014-001 FLAGGER 950.000 HR 0185 636025-001 WARNING LIGHTS, TYPE B 980.000 DA 0190 636025-001 WARNING LIGHTS, TYPE C 420.000 DA 0195 642031-001 DITCH CHECK 100.000 EA 0200 652003-005 SEED MIXTURE, L 400.000 LB 0205 652004-002 WOOD CELLULOSE FIBER MULCH 2.590 TN 1 FEDERAL PROJECT PAGE 91 Call Order : 039 CONTRACT ID : 0310044 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S344-0119/00-010.52 00 0STP 0119 164 E00 COUNTIES : ROANE DBE GOALS : 7.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/04 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WALTON-SPEED ROAD 0210 663001-005 EDGE LINE, TYPE II 14.000 MI 0215 663002-004 LANE LINE OR CENTERLINE, TYPE II 13.580 MI 0220 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 2,440.000 TN AA1 0225 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 2,221.000 TN AA2 0230 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE II 8.000 TN BB1 0235 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE II 8.000 TN BB2 0240 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 5,650.000 TN CC1 TYPE I 0245 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE I 5,142.000 TN CC2 0250 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 114.000 TN DD1 GRAVEL 0255 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 104.000 TN DD2 0260 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 2,580.000 TN EE1 0265 401007-002 MARSHALL SCRATCH COURSE, SLAG 2,348.000 TN EE2 0270 401017-001 HOT-MIX ASPHALT POTHOLE REPAIR, STONE OR GRAVEL, TYPE II 79.000 TN FF1 0275 401017-002 HOT-MIX ASPHALT POTHOLE REPAIR, SLAG, TYPE II 72.000 TN FF2 1 STATE PROJECT PAGE 92 Call Order : 040 CONTRACT ID : 0300712 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S316-0005/00-000.00 00 COUNTIES : HARDY GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204003-000 MOBILIZATION, PER PERMANENT 1.000 EA 0010 204003-000 MOBILIZATION, PER 14 DAYS TEMPORARY 1.000 EA 0015 408002-001 BITUMINOUS MATERIAL 525.000 GA 0020 636006-001 PILOT TRUCK AND DRIVER 3.000 DA 0025 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 8,460.000 LF 0030 636011-001 TRAFFIC CONTROL DEVICE 2,320.000 UN 0035 636014-001 FLAGGER 60.000 HR 0040 663002-004 LANE LINE OR CENTERLINE, TYPE II YELLOW 1.600 MI 0045 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 175.000 TN AA1 0050 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 166.000 TN AA2 0055 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 1,025.000 TN BB1 TYPE I 0060 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE I 974.000 TN BB2 0065 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 600.000 TN CC1 0070 401007-002 MARSHALL SCRATCH COURSE, SLAG 570.000 TN CC2 1 STATE PROJECT PAGE 93 Call Order : 041 CONTRACT ID : 0300711 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S319-0034/00-000.00 00 COUNTIES : JEFFERSON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204003-000 MOBILIZATION, PER PERMANENT 1.000 EA 0010 204003-000 MOBILIZATION, PER 3 DAYS TEMPORARY 1.000 EA 0015 408002-001 BITUMINOUS MATERIAL 620.000 GA 0020 415005-001 REMOVE EXISTING PAVEMENT SURFACE 962.000 SY 0025 636006-001 PILOT TRUCK AND DRIVER 3.000 DA 0030 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 10,549.000 LF 0035 636011-001 TRAFFIC CONTROL DEVICE 2,140.000 UN 0040 636014-001 FLAGGER 120.000 HR 0045 663001-005 EDGE LINE, TYPE II WHITE 2.200 MI 0050 663002-004 LANE LINE OR CENTERLINE, TYPE II YELLOW 1.100 MI 0055 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 386.000 TN AA1 0060 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 367.000 TN AA2 0065 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 1,261.000 TN BB1 TYPE I 0070 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE I 1,198.000 TN BB2 0075 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 413.000 TN CC1 GRAVEL 0080 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 392.000 TN CC2 0085 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 501.000 TN DD1 0090 401007-002 MARSHALL SCRATCH COURSE, SLAG 476.000 TN DD2 1 STATE PROJECT PAGE 94 Call Order : 042 CONTRACT ID : 0336302 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S323-0010/00-008.60 00 COUNTIES : LOGAN GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204003-000 MOBILIZATION, PER PERMANENT PAVEMENT MARKINGS 1.000 EA 0010 204003-000 MOBILIZATION, PER 3-DAY, TEMPORARY PAVEMENT MARKINGS 1.000 EA 0015 408002-001 BITUMINOUS MATERIAL 760.000 GA 0020 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 19,747.000 LF 0025 636011-001 TRAFFIC CONTROL DEVICE 1,780.000 UN 0030 636014-001 FLAGGER 100.000 HR 0035 663001-005 EDGE LINE, TYPE II WHITE 3.740 MI 0040 663002-004 LANE LINE OR CENTERLINE, TYPE II YELLOW 3.740 MI 0045 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 500.000 TN AA1 0050 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 455.000 TN AA2 0055 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 250.000 TN BB1 GRAVEL 0060 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 228.000 TN BB2 0065 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 1,350.000 TN CC1 GRAVEL, TYPE 1 0070 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 1,229.000 TN CC2 1 STATE PROJECT PAGE 95 Call Order : 043 CONTRACT ID : 0400614 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S325-0048/00-000.00 00 COUNTIES : MARION GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204003-000 MOBILIZATION, PER PER JOB ORDER (TEMPORARY) 1.000 EA 0010 204003-000 MOBILIZATION, PER PER JOB ORDER (PERMANENT) 1.000 EA 0015 408002-001 BITUMINOUS MATERIAL 1,500.000 GA 0020 636006-001 PILOT TRUCK AND DRIVER 10.000 DA 0025 636011-001 TRAFFIC CONTROL DEVICE 3,240.000 UN 0030 636014-001 FLAGGER 200.000 HR 0035 663001-005 EDGE LINE, TYPE II (TEMPORARY) 8.600 MI 0040 663002-004 LANE LINE OR CENTERLINE, TYPE II (TEMPORARY) 8.600 MI 0045 663001-005 EDGE LINE, TYPE II (PERMANENT) 8.600 MI 0050 663002-004 LANE LINE OR CENTERLINE, TYPE II (PERMANENT) 8.600 MI 0055 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 520.000 TN AA1 0060 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 468.000 TN AA2 0065 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 2,750.000 TN BB1 TYPE 1 0070 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 1 2,475.000 TN BB2 0075 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 650.000 TN CC1 GRAVEL 0080 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 585.000 TN CC2 0085 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 1,360.000 TN DD1 0090 401007-002 MARSHALL SCRATCH COURSE, SLAG 1,224.000 TN DD2 1 STATE PROJECT PAGE 96 Call Order : 044 CONTRACT ID : 0336318 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S330-0001/00-008.22 00 COUNTIES : MINGO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408002-001 BITUMINOUS MATERIAL 375.000 GA 0010 636011-001 TRAFFIC CONTROL DEVICE 880.000 UN 0015 636014-001 FLAGGER 40.000 HR 0020 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 650.000 TN AA1 TYPE 1 0025 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 1 592.000 TN AA2 0030 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 125.000 TN BB1 GRAVEL 0035 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 114.000 TN BB2 1 STATE PROJECT PAGE 97 Call Order : 045 CONTRACT ID : 0400811 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S332-0007/04-001.89 00 COUNTIES : MONROE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: GREG HYLTON, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408002-001 BITUMINOUS MATERIAL 315.000 GA 0010 636011-001 TRAFFIC CONTROL DEVICE 2,860.000 UN 0015 636014-001 FLAGGER 96.000 HR 0020 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 862.000 TN AA1 0025 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 785.000 TN AA2 0030 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 600.000 TN BB1 TYPE I 0035 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE I 546.000 TN BB2 0040 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 115.000 TN CC1 GRAVEL 0045 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 105.000 TN CC2 0050 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 325.000 TN DD1 0055 401007-002 MARSHALL SCRATCH COURSE, SLAG 296.000 TN DD2 1 STATE PROJECT PAGE 98 Call Order : 046 CONTRACT ID : 0336502 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S340-0062/00-017.54 00 COUNTIES : PUTNAM GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204003-000 MOBILIZATION, PER PERM 1.000 EA 0010 204003-000 MOBILIZATION, PER 3 DAY TEMP 2.000 EA 0015 408002-001 BITUMINOUS MATERIAL 2,550.000 GA 0020 636006-001 PILOT TRUCK AND DRIVER 20.000 DA 0025 636011-001 TRAFFIC CONTROL DEVICE 15,170.000 UN 0030 636014-001 FLAGGER 480.000 HR 0035 660007-001 MISCELLANEOUS SIGNAL 01 LUMP LUMP 0040 660007-001 MISCELLANEOUS SIGNAL 02 LUMP LUMP 0045 660007-001 MISCELLANEOUS SIGNAL 03 LUMP LUMP 0050 660007-001 MISCELLANEOUS SIGNAL 04 LUMP LUMP 0055 660007-001 MISCELLANEOUS SIGNAL 05 LUMP LUMP 0060 660007-001 MISCELLANEOUS SIGNAL 06 LUMP LUMP 0065 660007-001 MISCELLANEOUS SIGNAL 07 LUMP LUMP 0070 662015-001 ELECTRICAL TEST, ( 1.00 ) LUMP 0075 663001-005 EDGE LINE, TYPE II WHITE 36.480 MI 0080 663002-004 LANE LINE OR CENTERLINE, TYPE II WHITE 0.790 MI 0085 663002-004 LANE LINE OR CENTERLINE, TYPE II YELLOW 36.480 MI 0090 663003-005 BARRIER LINE, TYPE II 2,480.000 LF 0095 663004-011 CHANNELIZING LINE, TYPE V 670.000 LF 0100 663005-010 STOP LINE, TYPE V 24" 198.000 LF 0105 663007-010 STRIPE, TYPE V 12" WHITE 300.000 LF 1 STATE PROJECT PAGE 99 Call Order : 046 CONTRACT ID : 0336502 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S340-0062/00-017.54 00 COUNTIES : PUTNAM GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 663007-010 STRIPE, TYPE V 12" YELLOW 590.000 LF 0115 663010-010 LANE ARROW, TYPE V 11.000 EA 0120 663011-010 LANE LETTER, TYPE V 28.000 EA 0125 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 73.000 EA 0130 663015-005 RAILROAD CROSSING MARKING, TYPE V 2.000 EA 0135 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 1,675.000 TN AA1 0140 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 1,507.000 TN AA2 0145 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 2,350.000 TN BB1 0150 401007-002 MARSHALL SCRATCH COURSE, SLAG 2,115.000 TN BB2 0155 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 4,775.000 TN CC1 GRAVEL, TYPE I 0160 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE I 4,280.000 TN CC2 1 STATE PROJECT PAGE 100 Call Order : 047 CONTRACT ID : 0301536 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S341-0003/28-000.00 00 COUNTIES : RALEIGH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: MIKE WARD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACE (2" HMA), STABILIZE SHOULDERS 0005 408002-001 BITUMINOUS MATERIAL 450.000 GA 0010 636006-001 PILOT TRUCK AND DRIVER 4.000 DA 0015 636011-001 TRAFFIC CONTROL DEVICE 2,760.000 UN 0020 636014-001 FLAGGER 96.000 HR 0025 636025-001 WARNING LIGHTS, TYPE B 20.000 DA 0030 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 390.000 TN AA1 0035 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 355.000 TN AA2 0040 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 2 1,575.000 TN BB1 0045 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 2 1,434.000 TN BB2 1 STATE PROJECT PAGE 101 Call Order : 048 CONTRACT ID : 0400803 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S342-0039/00-003.14 00 COUNTIES : RANDOLPH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 : RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WIDENING, RESURFACING, PVMT MARKINGS, STONE SHLD 0005 204001-000 MOBILIZATION LUMP LUMP 0010 408002-001 BITUMINOUS MATERIAL 875.000 GA 0015 636006-001 PILOT TRUCK AND DRIVER 13.000 DA 0020 636011-001 TRAFFIC CONTROL DEVICE 2,590.000 UN 0025 636014-001 FLAGGER 260.000 HR 0030 663002-004 LANE LINE OR CENTERLINE, TYPE II 5.640 MI 0035 663002-004 LANE LINE OR CENTERLINE, TYPE II (TEMPORARY) 5.640 MI 0040 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 750.000 TN AA1 0045 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 683.000 TN AA2 0050 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 1 1,375.000 TN BB1 0055 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 1 1,251.000 TN BB2 0060 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 250.000 TN CC1 GRAVEL 0065 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 228.000 TN CC2 0070 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 1,580.000 TN DD1 0075 401007-002 MARSHALL SCRATCH COURSE, SLAG 1,438.000 TN DD2 0080 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 1,626.000 TN EE1 TYPE 1 0085 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 1 1,480.000 TN EE2 1 STATE PROJECT PAGE 102 Call Order : 049 CONTRACT ID : 0400828 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S345-0N20/00-014.59 00 COUNTIES : SUMMERS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: GREG HYLTON, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 204003-000 MOBILIZATION, PER JOB ORDER (14 DAY TEMP. PVMT. MARKING) 1.000 EA 0015 204003-000 MOBILIZATION, PER JOB ORDER (PERMANENT PAVEMENT MARKING) 1.000 EA 0020 207001-001 UNCLASSIFIED EXCAVATION 143.500 CY 0025 408002-001 BITUMINOUS MATERIAL 531.000 GA 0030 415005-001 REMOVE EXISTING PAVEMENT SURFACE 17,708.300 SY 0035 609001-001 CONCRETE SIDEWALK 301.000 SY 0040 609002-001 BED COURSE MATERIAL 57.400 CY 0045 610001-001 PLAIN CONCRETE CURBING, TYPE I 617.000 LF 0050 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE (YELLOW) 2,108.000 LF 0055 636011-001 TRAFFIC CONTROL DEVICE 8,800.000 UN 0060 636014-001 FLAGGER 324.000 HR 0065 636025-001 WARNING LIGHTS, TYPE B 840.000 DA 0070 663002-005 LANE LINE OR CENTERLINE, TYPE II (YELLOW) 2,108.000 LF 0075 663005-010 STOP LINE, TYPE V (2' WHITE) 33.000 LF 0080 663006-010 CROSSWALK LINE, TYPE V (12" WHITE) 145.000 LF 0085 670023-001 ADJUSTING VALVE BOX 10.000 EA 0090 675018-001 ADJUSTING MANHOLE 3.000 EA 0095 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 974.000 TN AA1 TYPE I 0100 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE I 887.000 TN AA2 0105 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 576.000 TN BB1 1 STATE PROJECT PAGE 103 Call Order : 049 CONTRACT ID : 0400828 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S345-0N20/00-014.59 00 COUNTIES : SUMMERS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: GREG HYLTON, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 401007-002 MARSHALL SCRATCH COURSE, SLAG 525.000 TN BB2 1 STATE PROJECT PAGE 104 Call Order : 050 CONTRACT ID : 0400521 Letting Date : 04/06/04 10:00 A.M. PROJECTS : S354-0031/00-004.99 00 COUNTIES : WOOD GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/04 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WILLIAMSTOWN - DEERWALK ROAD 0005 204003-000 MOBILIZATION, PER PERMANENT PAVMENT MARKING 1.000 EA 0010 204003-000 MOBILIZATION, PER 14 DAY TEMPORARY PAVEMENT MARKING 1.000 EA 0015 307001-000 AGGREGATE BASE COURSE, CLASS I 336.000 CY 0020 408002-001 BITUMINOUS MATERIAL 1,550.000 GA 0025 636006-001 PILOT TRUCK AND DRIVER 8.000 DA 0030 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 114,471.000 LF 0035 636011-001 TRAFFIC CONTROL DEVICE 7,250.000 UN 0040 636014-001 FLAGGER 200.000 HR 0045 636025-001 WARNING LIGHTS, TYPE B 120.000 DA 0050 663001-005 EDGE LINE, TYPE II 10.840 MI 0055 663002-004 LANE LINE OR CENTERLINE, TYPE II 10.840 MI 0060 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 1,600.000 TN AA1 0065 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 1,456.000 TN AA2 0070 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE II 157.000 TN BB1 0075 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE II 143.000 TN BB2 0080 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 3,336.000 TN CC1 TYPE I 0085 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE I 3,036.000 TN CC2 0090 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 2,025.000 TN DD1 0095 401007-002 MARSHALL SCRATCH COURSE, SLAG 1,843.000 TN DD2 1 FEDERAL PROJECT PAGE 105 Call Order : 051 CONTRACT ID : 0019241R1 Letting Date : 04/06/04 10:00 A.M. PROJECTS : U320-0622/00-000.00 02 0CMA 0622 015 E00 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/15/04 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WIDENING 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204003-000 MOBILIZATION, PER PERM 1.000 EA 0015 204003-000 MOBILIZATION, PER 3 DAY TEMP 1.000 EA 0020 207001-001 UNCLASSIFIED EXCAVATION 147.000 CY 0025 207034-000 FABRIC FOR SEPARATION 520.000 SY 0030 211001-000 UNCLASSIFIED BORROW EXCAVATION 140.000 CY 0035 229001-000 SHOULDER AND DITCH 0.060 MI 0040 307001-000 AGGREGATE BASE COURSE, CLASS 1 140.000 CY 0045 408002-001 BITUMINOUS MATERIAL 335.000 GA 0050 508001-001 SAWING EXISTING CONCRETE PAVEMENT 185.000 LF 0055 605004-001 TYPE B INLET 1.000 EA 0060 607001-001 TYPE 1 GUARDRAIL, CLASS II 300.000 LF 0065 610006-001 MEDIAN, TYPE I TYPE I 182.000 LF 0070 636011-001 TRAFFIC CONTROL DEVICE 9,580.000 UN 0075 636014-001 FLAGGER 320.000 HR 0080 636021-001 ELECTRIC ARROW 30.000 DA 0085 636025-001 WARNING LIGHTS, TYPE B 176.000 DA 0090 642031-001 DITCH CHECK 1.000 EA 0095 652003-001 SEED MIXTURES, B, C-1, OR C-2 15.000 LB 0100 652004-002 WOOD CELLULOSE FIBER MULCH 1.000 TN 0105 660007-001 MISCELLANEOUS SIGNAL LUMP LUMP 1 FEDERAL PROJECT PAGE 106 Call Order : 051 CONTRACT ID : 0019241R1 Letting Date : 04/06/04 10:00 A.M. PROJECTS : U320-0622/00-000.00 02 0CMA 0622 015 E00 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/15/04 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WIDENING 0110 663001-005 EDGE LINE, TYPE II WHITE 0.350 MI 0115 663002-004 LANE LINE OR CENTERLINE, TYPE II WHITE 0.220 MI 0120 663004-011 CHANNELIZING LINE, TYPE V 280.000 LF 0125 663005-010 STOP LINE, TYPE V 24" 75.000 LF 0130 663010-010 LANE ARROW, TYPE V 4.000 EA 0135 663011-010 LANE LETTER, TYPE V 8.000 EA 0140 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10, SHOULDERS 75.000 TN BB1 0145 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10, SHOULDERS 69.000 TN BB2 0150 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE I 277.000 TN CC1 0155 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE I 255.000 TN CC2 0160 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 68.000 TN DD1 GRAVEL, TYPE I 0165 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE I 63.000 TN DD2