WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- April 20, 2010 LETTING Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways. Proposal and Plans are now available for review and downloading on the Bid Express web site for WVDOH Agency, at "www.bidx.com". ALL BIDS MUST BE SUBMITTED VIA THE INTERNET THROUGH BID EXPRESS, Until 10 A.M.April 20, 2010 and said proposals will be publicly opened and read immediately thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 9808981 U314-0003/00-001.48 00 RAISE OR LOWER GRADE SPRINGFIELD RD E OF MILLESONS MILL COUNTY: HAMPSHIRE REMARKS : MANDATORY PREBID MARCH 31,2010, AT 10 A.M., ON-SITE ------------------------------------------------------------------------------------------------------------------------------------ 002 0626143 X312-000H/00-081.35 02 0APD 0484 298 000 CONST NEW/RELOC ROAD WO/PAVING CORR. H: E WV 42/93 I/S - FORE KNOBS 0.4 MI E WV 93/WV 42 - -.68 MI N E FORE KNOB COUNTY: GRANT DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : MANDATORY PREBID, APRIL 5, 1 P.M., ROOM A-122 ------------------------------------------------------------------------------------------------------------------------------------ 003 0931787 U317-0CLA/RK-013.00 00 0ERP 2009 175 D00 PEDESTRIAN/BIKE FACILITIES HISTORIC DOWNTOWN DISTRICT VARIOUS LOCATIONS COUNTY: HARRISON DBE GOAL: 5 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 004 0921927 S336-0220/00-030.00 00 ACST 0220 185 D00 RESURFACING UPPER TRACT - BRUSHY RUN RD 0.61 MI S OF CR 1/3 - 0.78 MI N OF CR 220/2 COUNTY: PENDLETON DBE GOAL: 5 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 005 0921928 S336-0021/00-014.50 00 STOC 0021 402 D00 RESURFACING SUGAR GROVE - BRANDYWINE ROAD 0.06 MILES SOUTH OF CO 21/4 - 0.32 MILES NORTH OF CO 21/2 COUNTY: PENDLETON DBE GOAL: 4 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 006 0921926 S347-0219/00-000.00 00 ACST 0219 304 D00 RESURFACING MOORE STATION ROAD RANDOLPH CO. LINE - 2.01 MI N OF CO. LINE COUNTY: TUCKER DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- April 20, 2010 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 007 0931792 U305-0WEL/LS-006.00 00 0ERP 2009 174 D00 PEDESTRIAN/BIKE FACILITIES WELLSBURG STREETSCAPE BEG & END: VARIOUS SPOT LOCATIONS COUNTY: BROOKE REMARKS : PREQUALIFICATION WAIVED ------------------------------------------------------------------------------------------------------------------------------------ 008 *0931992 U306-0HUN/TI-018.00 00 0ERP 2009 189 D00 PEDESTRIAN/BIKE FACILITIES DOWNTOWN HTGTN PED COR VISITOR CENTER - PULLMAN SQUARE COUNTY: CABELL REMARKS : PREQUALIFICATION WAIVED ------------------------------------------------------------------------------------------------------------------------------------ 009 0931997 U310-0MOU/NT-002.00 00 0ERP 2009 187 D00 PEDESTRIAN/BIKE FACILITIES MT HOPE SW(S) & PED LIGHT BEGIN: MAIN ST. COUNTY: FAYETTE REMARKS : PREQUALIFICATION WAIVED ------------------------------------------------------------------------------------------------------------------------------------ 010 0931928 S310-0OAK/HI-005.00 00 0ERP 2009 185 D00 PEDESTRIAN/BIKE FACILITIES WHITE OAK RAIL TRAIL PAVING HOL INN HTL-1/2 M N; JONES AVE-1/2 M S T COUNTY: FAYETTE DBE GOAL: 2 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : PREQUALIFICATION WAIVED ------------------------------------------------------------------------------------------------------------------------------------ 011 0931998 U310-0NRG/PB-001.00 00 0ERP 2009 194 D00 CLEAN AND PAINT STRUCTURE NEW RIVER PEDESTRIAN BRIDGE & IMPROVEMENTS NEW RIVER GORGE PARK COUNTY: FAYETTE DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : PREQUALIFICATION WAIVED ------------------------------------------------------------------------------------------------------------------------------------ 012 *0931926 U313-0RAI/NE-002.00 00 0ERP 2009 190 D00 PEDESTRIAN/BIKE FACILITIES RAINELLE-KAN BLVD COR SW(S) BEGIN: VARIOUS SPOT LOCATIONS COUNTY: GREENBRIER REMARKS : PREQUALIFICATION WAIVED ------------------------------------------------------------------------------------------------------------------------------------ 013 0931927 U313-0RON/CE-003.00 00 0ERP 2009 186 D00 PEDESTRIAN/BIKE FACILITIES RONCEVERTE MAIN ST SW(S) 1,544 LF ALONG US 219 (MAIN ST) COUNTY: GREENBRIER DBE GOAL: 5 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : PREQUALIFICATION WAIVED ------------------------------------------------------------------------------------------------------------------------------------ WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- April 20, 2010 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 014 0931987 U320-0FLI/NN-002.00 00 0ERP 2009 180 D00 MISCELLANEOUS CONSTRUCTION FLINN SIDEWALK PROJECT CR 622 - CR 622/38 COUNTY: KANAWHA DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : PREQUALIFICATION WAIVED ------------------------------------------------------------------------------------------------------------------------------------ 015 0931999 S328-0PRI/NC-002.00 00 0ERP 2009 184 D00 UNKNOWN CITY OF PRINCETON SIDEWALKS VARIOUS COUNTY: MERCER DBE GOAL: 5 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : PREQUALIFICATION WAIVED ------------------------------------------------------------------------------------------------------------------------------------ 016 0931788 U331-0GRA/NV-001.00 00 0ERP 2009 170 D00 PEDESTRIAN/BIKE FACILITIES GRANVILLE MAIN STREET BEGIN: DENTS RUN BR. END: EVERLY ST COUNTY: MONONGALIA DBE GOAL: 4 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : PREQUALIFICATION WAIVED ------------------------------------------------------------------------------------------------------------------------------------ 017 0931791 U337-0STM/AR-001.00 00 0ERP 2009 172 D00 PEDESTRIAN/BIKE FACILITIES ST. MARY'S WASHINGTON STREET SIDEWALKS BEGIN: JCT. 2ND ST. END: JCT WV 2 COUNTY: PLEASANTS DBE GOAL: 5 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : PREQUALIFICATION WAIVED ------------------------------------------------------------------------------------------------------------------------------------ 018 *0931994 U341-0MAB/SC-001.00 00 0ERP 2009 193 D00 UNKNOWN MABSCOTT SIDEWALKS WHITESTICK AVENUE COUNTY: RALEIGH REMARKS : PREQUALIFICATION WAIVED ------------------------------------------------------------------------------------------------------------------------------------ 019 *0931990 U344-0SPE/NC-001.00 03 ERP0 2009 182 D00 PEDESTRIAN/BIKE FACILITIES SPENCER SIDEWALKS BEGIN: JCT OF US 33 AND US 119 END: JCT COURT ST COUNTY: ROANE REMARKS : PREQUALIFICATION WAIVED ------------------------------------------------------------------------------------------------------------------------------------ WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- April 20, 2010 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 020 *0931991 U351-0BAK/ER-001.00 00 0ERP 2009 192 D00 PEDESTRIAN/BIKE FACILITIES BAKER'S ISLAND REC TRAIL BAKER'S ISLAND REC TRAIL COUNTY: WEBSTER REMARKS : PREQUALIFICATION WAIVED ------------------------------------------------------------------------------------------------------------------------------------ 021 1000526 S313-0060/00-032.63 00 ACST 0060 258 D00 RESURFACING LEWISBURG - CALDWELL ROAD BEG: 0.51 MI WEST OF CR 60/17 COUNTY: GREENBRIER REMARKS : ------------------------------------------------------------------------------------------------------------------------------------ 022 *0925172 S320-0016/00-001.91 00 SLIDE REPAIR CHESTNUT ROAD SLIDE 1.91 MI. N WV214 COUNTY: KANAWHA ------------------------------------------------------------------------------------------------------------------------------------ 023 *0703001 S325-0019/00-007.97 02 BUILDING DEMOLITION LOCUST AVENUE - DEM BLDGS US 19 SPUR - US 250 COUNTY: MARION ------------------------------------------------------------------------------------------------------------------------------------ 024 0814408 S326-0250/00-019.16 00 SLIDE REPAIR W/PILING US 250, LIMESTONE ROAD SLIP REPAIR BEGIN: 0.10 MI. E. JCT. CR 250/2 END: JCT. CR 250/2 COUNTY: MARSHALL ------------------------------------------------------------------------------------------------------------------------------------ 025 0919888 E330-0252/07-C05.09 01 FEMA 1838 000 000 STRUCTURE REPLACEMENT COON BRANCH BRIDGE 0.01 MI S US 52 0 0.02 MI S US 52 COUNTY: MINGO BRIDGE : 10915 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 026 *0830380 X336-0220/00-010.96 00 MISCELLANEOUS CONSTRUCTION PENDLETON COUNTY QUARRY 2.80 MI N OF CO 25 COUNTY: PENDLETON ------------------------------------------------------------------------------------------------------------------------------------ 027 *0814821 S344-0029/00-007.23 00 SLIDE REPAIR W/PILING GARNER BRANCH - BIG SANDY ROAD SLIP REPAIR 1.74 MILES EAST OF I-79 COUNTY: ROANE ------------------------------------------------------------------------------------------------------------------------------------ 028 *0818303 S347-0007/00-002.02 00 SLIDE REPAIR W/PILING HORSESHOE RUN ROAD 2.02 MI N OF CR 1 COUNTY: TUCKER ------------------------------------------------------------------------------------------------------------------------------------ WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- April 20, 2010 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 029 *0928871 S347-0047/00-002.35 00 SLIDE REPAIR W/PILING RANDOLPH CO. LINE - PLEASANT RUN RD 0.62 MI E OF CR 47/1 - 0.70 MI E OF CR 47/1 COUNTY: TUCKER ------------------------------------------------------------------------------------------------------------------------------------ 030 *1003231 E350-0037/06-000.85 00 FEMA 1696 000 000 SLIDE REPAIR W/PILING TARK HILL ROAD 0.85 MI. S WV 37 TO 0.87 MI. S. WV 37 COUNTY: WAYNE ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of total bid, whichever is greater. Failure to include one of the above forms could result in a bid being declared irregular. The right is reserved to reject any or all proposals. *These are projects on which any contractor with a Category "W" Prequalification Rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders through Bid Express will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national orign in consideration for an award. It is necessary to advise your approximate uncompleted workload when ordering plans and proposals. Announcement, opening and reading of bids received will be in the order as designated in the "Notice to Contractors". Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division Of Highways Robert L. Pennington, P.E. Director of Program Planning and Administration 1 STATE PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 9808981 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U314-0003/00-001.48 00 COMPLETION DATE : 11/12/10 RES. ENG.: GARY LONG DESCRIPTION: SPRINGFIELD RD MANDATORY PREBID MARCH 31,2010, AT 10 A.M., ON-SITE ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RAISE OR LOWER GRADE 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 15,256.000 CY 0020 207002-000 SUBGRADE 1,315.000 CY 0025 207034-000 FABRIC FOR SEPARATION 8,458.000 SY 0030 218008-000 SHOT ROCK 20,961.000 TN 0035 307001-000 AGGREGATE BASE COURSE, CLASS 1 1,989.000 CY 0040 307001-000 AGGREGATE BASE COURSE, CLASS 3 236.000 CY 0045 604037-016 18 INCH REINFORCED CONCRETE PIPE, CLASS III 288.000 LF 0050 604037-020 24 INCH REINFORCED CONCRETE PIPE, CLASS III 66.000 LF 0055 605003-001 TYPE A INLET 7.000 EA 0060 605004-001 TYPE B INLET 1.000 EA 0065 605009-001 TYPE G INLET 3.000 EA 0070 606029-001 FREE DRAINING BASE TRENCH 3,954.000 LF 0075 606030-001 OUTLET PIPE, 18" 576.000 LF 0080 607001-001 TYPE 1 GUARDRAIL, CLASS I 1,946.000 LF 0085 607065-001 FLARED END TERMINAL 4.000 EA 0090 609001-001 CONCRETE SIDEWALK 17.000 SY 0095 633003-001 DUMPED ROCK GUTTER 97.000 CY 0100 636007-001 ERADICATION OF PAVEMENT MARKING 300.000 LF 0105 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN 2,000.000 LF 0110 636011-001 TRAFFIC CONTROL DEVICE 5,820.000 UN 1 STATE PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 9808981 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U314-0003/00-001.48 00 COMPLETION DATE : 11/12/10 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RAISE OR LOWER GRADE 0115 636012-010 PROJECT TRAFFIC CONTROL DEVICE CLEANING 3.000 EA 0120 636013-001 INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING 100.000 EA 0125 636014-001 FLAGGER 100.000 HR 0130 636017-001 TEMPORARY CONCRETE BARRIER 2,400.000 LF 0135 636018-001 REMOVE AND RESET TEMPORARY CONCRETE BARRIER 2,400.000 LF 0140 636023-001 TEMPORARY TRAFFIC SIGNAL ( 2.00 ) LUMP 0145 636025-001 WARNING LIGHTS, TYPE B 4,160.000 DA 0150 637001-001 WATER FOR DUST PALLIATIVE 30.000 MG 0155 638002-001 RIGHT OF WAY MARKER 22.000 EA 0160 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0165 640003-001 BUILDING EQUIPMENT LUMP LUMP 0170 640006-001 SMALL FIELD OFFICE 12.000 MO 0175 642001-001 TEMPORARY BERM 2,475.000 LF 0180 642002-001 SLOPE DRAIN 21.000 LF 0185 642004-001 SEED MIXTURE, TEMPORARY 45.000 LB 0190 642004-002 SEED MIXTURE, B 73.000 LB 0195 642005-002 MULCH, WOOD CELLULOSE FIBER 0.600 TN 0200 642006-001 FERTILIZER 0.300 TN 0205 642009-001 CONTOUR DITCH 399.000 LF 0210 642010-001 AGRICULTURAL LIMESTONE 1.000 TN 0215 642011-001 HAY OR STRAW BALE 757.000 EA 0220 642012-001 SILT FENCE 2,272.000 LF 0225 642031-001 DITCH CHECK 30.000 EA 1 STATE PROJECT PAGE 3 Call Order : 001 CONTRACT ID : 9808981 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U314-0003/00-001.48 00 COMPLETION DATE : 11/12/10 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RAISE OR LOWER GRADE 0230 642032-001 CHECK DAM 1.000 EA 0235 642033-001 SEDIMENT TRAP 97.000 CY 0240 642036-001 SEDIMENT REMOVAL 49.000 CY 0245 652001-001 AGRICULTURAL LIMESTONE 1.200 TN 0250 652002-001 FERTILIZER, 10-20-10 0.400 TN 0255 652002-002 FERTILIZER, UREA FORMALDEHYDE 0.200 TN 0260 652003-001 SEED MIXTURES, B, C-1, OR C-2 73.000 LB 0265 652004-002 WOOD CELLULOSE FIBER MULCH 0.600 TN 0270 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 4,500.000 LF 0275 663002-005 LANE LINE, TYPE II - 4 IN YELLOW 4,500.000 LF 0280 664001-009 REMOVE AND RESET ATTENUATOR DEVICE 2.000 EA 0285 664011-001 TEMPORARY IMPACT ATTENUATING DEVICE, TYPE II, III, OR VIII 2.000 EA 0290 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 1 3,826.000 TN AA1 0295 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 1 3,634.000 TN AA2 0300 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 479.000 TN BB1 TYPE 1 0305 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 1 455.000 TN BB2 0310 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 250.000 TN CC1 0315 401007-002 MARSHALL SCRATCH COURSE, SLAG 237.000 TN CC2 0320 604001-016 18 INCH METALLIC COATED CORRUGATED STEEL PIPE, A2 241.000 LF DD1 0325 604076-016 18 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 241.000 LF DD2 0330 636002-001 AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 100.000 TN EE1 0335 636002-002 AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 95.000 TN EE2 1 FEDERAL PROJECT PAGE 4 Call Order : 002 CONTRACT ID : 0626143 Letting Date : 04/20/10 10:00 A.M. PROJECTS : X312-000H/00-081.35 02 0APD 0484 298 000 COUNTIES : GRANT DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 0.00 PLANS COMPLETE : 0.00 PLANS WO X-SECTIONS : 0.00 COMPLETION DATE : 09/30/11 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE & DRAIN 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202001-000 BUILDING DEMOLITION NUMBER, 2/6 ( 1.00 ) LUMP 0015 202001-000 BUILDING DEMOLITION NUMBER, 3/1 ( 1.00 ) LUMP 0020 202001-000 BUILDING DEMOLITION NUMBER, 3/2 ( 1.00 ) LUMP 0025 202001-000 BUILDING DEMOLITION NUMBER, 3/3 ( 1.00 ) LUMP 0030 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 3/4 LUMP LUMP 0035 204001-000 MOBILIZATION LUMP LUMP 0040 207001-001 UNCLASSIFIED EXCAVATION 3,924,000.000 CY 0045 207002-000 SUBGRADE 2,756.000 CY 0050 207034-000 FABRIC FOR SEPARATION 19,819.000 SY 0055 211001-000 UNCLASSIFIED BORROW EXCAVATION 239,276.000 CY 0060 211002-000 ROCK BORROW EXCAVATION 382,059.000 CY 0065 218009-001 GROUT FOR ROCK GUTTER 6,494.000 SY 0070 307001-000 AGGREGATE BASE COURSE, CLASS 1 919.000 CY 0075 601002-001 CLASS B CONCRETE 78.200 CY 0080 604037-028 48 INCH REINFORCED CONCRETE PIPE, CLASS II 76.000 LF 0085 604076-022 30 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 1,133.000 LF 0090 604076-024 36 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 1,776.000 LF 0095 604076-026 42 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 269.000 LF 0100 604076-028 48 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 309.000 LF 0105 604080-040 84 INCH ALUMINUM COATED CORRUGATED STEEL PIPE HALF 562.000 LF BITUMINOUS COATED AND PAVED INVERT, E5 1 FEDERAL PROJECT PAGE 5 Call Order : 002 CONTRACT ID : 0626143 Letting Date : 04/20/10 10:00 A.M. PROJECTS : X312-000H/00-081.35 02 0APD 0484 298 000 COUNTIES : GRANT DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 0.00 PLANS COMPLETE : 0.00 PLANS WO X-SECTIONS : 0.00 COMPLETION DATE : 09/30/11 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE & DRAIN 0110 605001-001 TYPE A MANHOLE 2.000 EA 0115 605003-001 TYPE A INLET 8.000 EA 0120 605004-001 TYPE B INLET 2.000 EA 0125 605009-001 TYPE G INLET 59.000 EA 0130 605014-001 MODIFIED INLET, TYPE G 6.000 EA 0135 606020-001 AGGREGATE FILLED FABRIC UNDERDRAIN, 12 INCH 848.000 LF 0140 607001-001 TYPE 1 GUARDRAIL, CLASS III 1,425.000 LF 0145 608002-001 3 FT X 11 IN RIGHT-OF-WAY FENCE, FARM FIELD 27,036.000 LF 0150 633001-001 CONCRETE GUTTER 7,619.000 SY 0155 633003-001 DUMPED ROCK GUTTER 12,341.000 CY 0160 636011-001 TRAFFIC CONTROL DEVICE 3,580.000 UN 0165 637001-001 WATER FOR DUST PALLIATIVE 7,848.000 MG 0170 638002-001 RIGHT OF WAY MARKER 49.000 EA 0175 638003-001 SURVEY MARKER 15.000 EA 0180 638004-001 OUTLET MARKER 16.000 EA 0185 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0190 640002-001 LARGE FIELD OFFICE AND STORAGE BUILDING 30.000 MO 0195 640003-001 BUILDING EQUIPMENT LUMP LUMP 0200 642001-001 TEMPORARY BERM 16,311.000 LF 0205 642004-001 SEED MIXTURE, TEMPORARY 25,933.000 LB 0210 642004-002 SEED MIXTURE, B 10,588.000 LB 1 FEDERAL PROJECT PAGE 6 Call Order : 002 CONTRACT ID : 0626143 Letting Date : 04/20/10 10:00 A.M. PROJECTS : X312-000H/00-081.35 02 0APD 0484 298 000 COUNTIES : GRANT DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 0.00 PLANS COMPLETE : 0.00 PLANS WO X-SECTIONS : 0.00 COMPLETION DATE : 09/30/11 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE & DRAIN 0215 642004-003 SEED MIXTURE, D 22,691.000 LB 0220 642005-001 MULCH, STRAW OR HAY 432.000 TN 0225 642005-002 MULCH, WOOD CELLULOSE FIBER 160.000 TN 0230 642006-001 FERTILIZER 173.000 TN 0235 642007-001 FIBER MATTING 28,504.000 SY 0240 642008-001 TEMPORARY PIPE 395.000 LF 0245 642009-001 CONTOUR DITCH 25,650.000 LF 0250 642010-001 AGRICULTURAL LIMESTONE 216.000 TN 0255 642011-001 HAY OR STRAW BALE 1,069.000 EA 0260 642012-001 SILT FENCE 30,650.000 LF 0265 642015-001 SUPER SILT FENCE 5,835.000 LF 0270 642031-001 DITCH CHECK 465.000 EA 0275 642033-001 SEDIMENT TRAP 3,108.000 CY 0280 642036-001 SEDIMENT REMOVAL 1,580.000 CY 0285 642040-001 INLET PROTECTION 74.000 EA 0290 642043-001 PREMANUFACTURED DITCH CHECK 92.000 EA 0295 651001-001 FURNISHING AND PLACING TOPSOIL 118,325.000 CY 0300 652001-001 AGRICULTURAL LIMESTONE 217.000 TN 0305 652002-001 FERTILIZER, 10-20-10 73.000 TN 0310 652002-002 FERTILIZER, UREA FORMALDEHYDE 22.000 TN 0315 652003-001 SEED MIXTURES, B, C-1, OR C-2 3,293.000 LB 1 FEDERAL PROJECT PAGE 7 Call Order : 002 CONTRACT ID : 0626143 Letting Date : 04/20/10 10:00 A.M. PROJECTS : X312-000H/00-081.35 02 0APD 0484 298 000 COUNTIES : GRANT DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 0.00 PLANS COMPLETE : 0.00 PLANS WO X-SECTIONS : 0.00 COMPLETION DATE : 09/30/11 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE & DRAIN 0320 652003-002 SEED MIXTURE, D 7,064.000 LB 0325 652004-001 STRAW OR HAY MULCH 145.000 TN 0330 652004-002 WOOD CELLULOSE FIBER MULCH 37.000 TN 0335 655001-001 MATTING 38,921.000 SY 0340 655002-001 PERMANENT EROSION MATTING, TYPE A 38,109.000 SY 0345 655002-001 PERMANENT EROSION MATTING, TYPE B 3,369.000 SY 0350 699000-001 ON JOB TRAINING 2,000.000 HR 0355 604076-020 24 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 6,497.000 LF AA1 0360 604037-020 24 INCH REINFORCED CONCRETE PIPE, CLASS II 6,497.000 LF AA2 0365 604076-022 30 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 3,983.000 LF BB1 0370 604037-022 30 INCH REINFORCED CONCRETE PIPE, CLASS II 3,983.000 LF BB2 0375 604076-024 36 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 2,825.000 LF CC1 0380 604037-024 36 INCH REINFORCED CONCRETE PIPE, CLASS II 2,825.000 LF CC2 0385 604076-026 42 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 1,149.000 LF DD1 0390 604037-026 42 INCH REINFORCED CONCRETE PIPE, CLASS II 1,149.000 LF DD2 0395 604076-028 48 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 3,308.000 LF EE1 0400 604037-028 48 INCH REINFORCED CONCRETE PIPE, CLASS II 3,308.000 LF EE2 0405 636002-001 AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 4,962.000 TN FF1 0410 636002-002 AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 4,515.000 TN FF2 SECTION NO. 0002 SEDIMENT BASINS 0415 207001-001 UNCLASSIFIED EXCAVATION 227,796.000 CY 1 FEDERAL PROJECT PAGE 8 Call Order : 002 CONTRACT ID : 0626143 Letting Date : 04/20/10 10:00 A.M. PROJECTS : X312-000H/00-081.35 02 0APD 0484 298 000 COUNTIES : GRANT DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 0.00 PLANS COMPLETE : 0.00 PLANS WO X-SECTIONS : 0.00 COMPLETION DATE : 09/30/11 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 SEDIMENT BASINS 0420 207034-000 FABRIC FOR SEPARATION 3,052.000 SY 0425 211002-000 ROCK BORROW EXCAVATION 30,088.000 CY 0430 211017-001 IMPERVIOUS CORE 13,914.000 SF 0435 604076-020 24 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 72.000 LF 0440 604076-022 30 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 442.000 LF 0445 604076-024 36 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 182.000 LF 0450 608003-005 5 FT TEMPORARY FENCE 11,257.000 LF 0455 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0460 642015-001 SUPER SILT FENCE 2,875.000 LF 0465 642035-001 RISER 6.000 EA 0470 642036-001 SEDIMENT REMOVAL 4,506.000 CY 0475 642042-001 FLOCCULANT BLOCK 120.000 EA SECTION NO. 0003 SEDIMENT BASIN RESTORATION 0480 207001-001 UNCLASSIFIED EXCAVATION 238,696.000 CY 0485 642050-001 DEWATERING DEVICE 26.000 EA SECTION NO. 0004 ENERGY DISSIPATER 0490 207001-001 UNCLASSIFIED EXCAVATION 10,920.000 CY 0495 207034-000 FABRIC FOR SEPARATION 3,808.000 SY 0500 211002-000 ROCK BORROW EXCAVATION 2,888.000 CY SECTION NO. 0005 COMPUTER SYSTEM 1 FEDERAL PROJECT PAGE 9 Call Order : 002 CONTRACT ID : 0626143 Letting Date : 04/20/10 10:00 A.M. PROJECTS : X312-000H/00-081.35 02 0APD 0484 298 000 COUNTIES : GRANT DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 0.00 PLANS COMPLETE : 0.00 PLANS WO X-SECTIONS : 0.00 COMPLETION DATE : 09/30/11 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0005 COMPUTER SYSTEM 0505 640004-001 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP 1 FEDERAL PROJECT PAGE 10 Call Order : 003 CONTRACT ID : 0931787 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U317-0CLA/RK-013.00 00 0ERP 2009 175 D00 COUNTIES : HARRISON DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/10 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIDEWALKS 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207009-000 UNCLASSIFIED EXCAVATION LUMP LUMP 0015 605014-001 MODIFIED INLET, TYPE D 2.000 EA 0020 605016-001 MODIFIED MANHOLE TYPE A 1.000 EA 0025 609001-001 CONCRETE SIDEWALK 4-IN 461.000 SY 0030 609001-001 CONCRETE SIDEWALK 6-IN 283.000 SY 0035 609001-001 CONCRETE SIDEWALK STAMPED BRICK COLORED CONCRETE 189.000 SY 0040 609001-001 CONCRETE SIDEWALK STAMPED HERRINGBONE CROSSWALK 60.000 SY 0045 609002-001 BED COURSE MATERIAL 80.000 CY 0050 609005-001 CURB RAMP 7.000 EA 0055 609006-001 DETECTABLE WARNING SURFACE 14.000 EA 0060 610001-001 PLAIN CONCRETE CURBING, TYPE I 926.000 LF 0065 610001-004 PLAIN CONCRETE CURBING, TYPE IV 482.000 LF 0070 636001-001 TRAFFIC CONTROL LUMP LUMP 0075 657019-001 PIPE POST 2-IN SCH. 40 GAL. STEEL, BLACK ENAMEL 11.000 EA 0080 662002-001 GALVANIZED STEEL CONDUIT (01) 1-IN TRADERS ALLEY LUMP LUMP 0085 662002-001 GALVANIZED STEEL CONDUIT (01) 3-IN & 1-IN TRADERS ALLEY LUMP LUMP 0090 662002-001 GALVANIZED STEEL CONDUIT (01) 3-IN TRADERS ALLEY LUMP LUMP 0095 662002-001 GALVANIZED STEEL CONDUIT (02) 1-IN 2ND STREET LUMP LUMP 0100 662002-001 GALVANIZED STEEL CONDUIT (02) 3-IN & 1-IN 2ND STREET LUMP LUMP 0105 662002-001 GALVANIZED STEEL CONDUIT (02) 3-IN 2ND STREET LUMP LUMP 1 FEDERAL PROJECT PAGE 11 Call Order : 003 CONTRACT ID : 0931787 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U317-0CLA/RK-013.00 00 0ERP 2009 175 D00 COUNTIES : HARRISON DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/10 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIDEWALKS 0110 662002-001 GALVANIZED STEEL CONDUIT (03) 1-IN WEST PIKE STREET LUMP LUMP 0115 662002-001 GALVANIZED STEEL CONDUIT (03) 3-IN & 1-IN WEST PIKE STREET LUMP LUMP 0120 662002-001 GALVANIZED STEEL CONDUIT (03) 3-IN WEST PIKE STREET LUMP LUMP 0125 662006-001 JUNCTION BOX, TYPE H, 10-IN X 10-IN 14.000 EA 0130 662006-001 JUNCTION BOX, TYPE H, 18-IN X 18-IN 12.000 EA 0135 662007-001 LUMINAIRE, 175W, MH 26.000 EA 0140 662008-001 CABLE, (01) ( 1.00 ) LUMP 0145 662008-001 CABLE, (02) ( 1.00 ) LUMP 0150 662008-001 CABLE, (03) ( 1.00 ) LUMP 0155 662010-099 LIGHTING SUPPORT, TYPE DECORATIVE LA 11.000 EA 0160 662010-099 LIGHTING SUPPORT, TYPE DECORATIVE LB 15.000 EA 0165 662014-001 INCIDENTAL ELECTRICAL WORK (01) LUMP LUMP 0170 662014-001 INCIDENTAL ELECTRICAL WORK (02) LUMP LUMP 0175 662014-001 INCIDENTAL ELECTRICAL WORK (03) LUMP LUMP 0180 662015-001 ELECTRICAL TEST, (01) ( 1.00 ) LUMP 0185 662015-001 ELECTRICAL TEST, (02) ( 1.00 ) LUMP 0190 662015-001 ELECTRICAL TEST, (03) ( 1.00 ) LUMP 0195 672002-003 SITE FURNISHINGS, TRASH RECEPTACLES 14.000 EA 1 FEDERAL PROJECT PAGE 12 Call Order : 004 CONTRACT ID : 0921927 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S336-0220/00-030.00 00 ACST 0220 185 D00 COUNTIES : PENDLETON DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 CALENDAR DAYS : 18 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, DRAINAGE, PVD SHLD, GR, PVMT MARKINGS 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 602.000 CY 0015 211008-000 ROCK BORROW EXCAVATION 25.000 TN 0020 218008-000 SHOT ROCK 8.000 TN 0025 408002-001 BITUMINOUS MATERIAL 626.000 GA 0030 601002-001 CLASS B CONCRETE 2.000 CY 0035 604050-012 15 INCH CORRUGATED POLYETHYLENE PIPE 37.000 LF 0040 604050-020 24 INCH CORRUGATED POLYETHYLENE PIPE 5.000 LF 0045 605009-001 TYPE G INLET 1.000 EA 0050 607001-001 TYPE 1 GUARDRAIL, CLASS 1 2,425.000 LF 0055 607065-001 FLARED END TERMINAL 3.000 EA 0060 607066-001 TANGENT END TERMINAL 2.000 EA 0065 636006-001 PILOT TRUCK AND DRIVER 12.000 DA 0070 636011-001 TRAFFIC CONTROL DEVICE 2,500.000 UN 0075 636014-001 FLAGGER 240.000 HR 0080 663001-005 EDGE LINE, TYPE II - 4 IN (PERMANENT) 3.100 MI 0085 663001-005 EDGE LINE, TYPE II - 4 IN (TEMPORARY) 3.100 MI 0090 663002-004 LANE LINE, TYPE II - 4 IN (PERMANENT) 3.100 MI 0095 663002-004 LANE LINE, TYPE II - 4 IN (TEMPORARY) 3.100 MI 0100 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 1 1,246.500 TN AA1 0105 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 1 1,134.000 TN AA2 1 FEDERAL PROJECT PAGE 13 Call Order : 004 CONTRACT ID : 0921927 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S336-0220/00-030.00 00 ACST 0220 185 D00 COUNTIES : PENDLETON DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 CALENDAR DAYS : 18 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, DRAINAGE, PVD SHLD, GR, PVMT MARKINGS 0110 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 700.000 TN BB1 0115 401007-002 MARSHALL SCRATCH COURSE, SLAG 637.000 TN BB2 0120 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 2,195.000 TN CC1 GRAVEL, TYPE 1 0125 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 1,997.000 TN CC2 1 FEDERAL PROJECT PAGE 14 Call Order : 005 CONTRACT ID : 0921928 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S336-0021/00-014.50 00 STOC 0021 402 D00 COUNTIES : PENDLETON DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/10 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING W/PAVED SHLD, GR, PVMT MARKINGS 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 1,360.500 CY 0015 408002-001 BITUMINOUS MATERIAL 1,700.000 GA 0020 607001-001 TYPE 1 GUARDRAIL, CLASS 1 2,962.500 LF 0025 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 6,812.500 LF 0030 607010-001 TYPE 1 GUARDRAIL REMOVED AND STORED 62.500 LF 0035 607035-001 GUARDRAIL ELEMENT 25.000 EA 0040 607042-001 6 FT STEEL POST 30.000 EA 0045 607065-001 FLARED END TERMINAL 5.000 EA 0050 636006-001 PILOT TRUCK AND DRIVER 19.000 DA 0055 636011-001 TRAFFIC CONTROL DEVICE 4,570.000 UN 0060 636014-001 FLAGGER 380.000 HR 0065 663001-005 EDGE LINE, TYPE II - 4 IN (PERMANENT) 8.900 MI 0070 663001-005 EDGE LINE, TYPE II - 4 IN (TEMPORARY) 8.900 MI 0075 663002-004 LANE LINE, TYPE II - 4 IN (PERMANENT) 8.900 MI 0080 663002-004 LANE LINE, TYPE II - 4 IN (TEMPORARY) 8.900 MI 0085 663010-010 ONE DIRECTION LANE ASSIGNMENT ARROW, TY V 2.000 EA 0090 663011-010 LANE LETTER, TYPE V 4.000 EA 0095 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 1 2,698.000 TN AA1 0100 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 1 2,455.000 TN AA2 0105 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 2,000.000 TN BB1 1 FEDERAL PROJECT PAGE 15 Call Order : 005 CONTRACT ID : 0921928 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S336-0021/00-014.50 00 STOC 0021 402 D00 COUNTIES : PENDLETON DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/10 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING W/PAVED SHLD, GR, PVMT MARKINGS 0110 401007-002 MARSHALL SCRATCH COURSE, SLAG 1,820.000 TN BB2 0115 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 6,150.000 TN CC1 GRAVEL, TYPE 1 0120 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 5,597.000 TN CC2 1 FEDERAL PROJECT PAGE 16 Call Order : 006 CONTRACT ID : 0921926 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S347-0219/00-000.00 00 ACST 0219 304 D00 COUNTIES : TUCKER DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/10 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, DRAINAGE, PVD SHLD, GR, PVMT MARKINGS 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 1,144.000 CY 0015 211008-000 ROCK BORROW EXCAVATION 250.000 TN 0020 218003-000 GABION 24.000 CY 0025 218008-000 SHOT ROCK 15.000 TN 0030 408002-001 BITUMINOUS MATERIAL 1,065.000 GA 0035 604050-012 15 INCH CORRUGATED POLYETHYLENE PIPE 10.000 LF 0040 604050-024 36 INCH CORRUGATED POLYETHYLENE PIPE 45.000 LF 0045 605009-001 TYPE G INLET 1.000 EA 0050 606025-004 6 INCH UNDERDRAIN PIPE 30.000 LF 0055 607001-001 TYPE 1 GUARDRAIL, CLASS 1 237.500 LF 0060 607001-001 TYPE 1 GUARDRAIL, CLASS 5 25.000 LF 0065 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 1,112.500 LF 0070 607065-001 FLARED END TERMINAL 1.000 EA 0075 636006-001 PILOT TRUCK AND DRIVER 18.000 DA 0080 636011-001 TRAFFIC CONTROL DEVICE 1,960.000 UN 0085 636014-001 FLAGGER 360.000 HR 0090 663001-005 EDGE LINE, TYPE II - 4 IN (PERMANENT) 4.020 MI 0095 663001-005 EDGE LINE, TYPE II - 4 IN (TEMPORARY) 4.020 MI 0100 663002-004 LANE LINE, TYPE II - 4 IN (PERMANENT) 4.020 MI 0105 663002-004 LANE LINE, TYPE II - 4 IN (TEMPORARY) 4.020 MI 1 FEDERAL PROJECT PAGE 17 Call Order : 006 CONTRACT ID : 0921926 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S347-0219/00-000.00 00 ACST 0219 304 D00 COUNTIES : TUCKER DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/10 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING, DRAINAGE, PVD SHLD, GR, PVMT MARKINGS 0110 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 1 2,262.500 TN AA1 0115 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 1 2,059.000 TN AA2 0120 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 36.000 TN BB1 GRAVEL 0125 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 33.000 TN BB2 0130 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 975.000 TN CC1 0135 401007-002 MARSHALL SCRATCH COURSE, SLAG 887.000 TN CC2 0140 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 2,925.000 TN DD1 GRAVEL, TYPE 1 0145 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 2,662.000 TN DD2 1 FEDERAL PROJECT PAGE 18 Call Order : 007 CONTRACT ID : 0931792 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U305-0WEL/LS-006.00 00 0ERP 2009 174 D00 COMPLETION DATE : 09/30/10 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 STREETSCAPE SIDEWALK REPAIRS 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 320.000 CY 0020 605012-001 ADJUST INLET TYPE, B 1.000 EA 0025 609001-001 CONCRETE SIDEWALK 876.000 SY 0030 609001-001 CONCRETE SIDEWALK BRICK 233.000 SY 0035 609002-001 BED COURSE MATERIAL 117.000 CY 0040 609002-001 BED COURSE MATERIAL SAND 6.000 CY 0045 609006-001 DETECTABLE WARNING SURFACE 7.000 EA 0050 610001-001 PLAIN CONCRETE CURBING, TYPE I 267.000 LF 0052 610001-001 PLAIN CONCRETE CURBING, TYPE I MODIFIED 718.000 LF 0055 610001-004 PLAIN CONCRETE CURBING, TYPE IV 39.000 LF 0057 610001-004 PLAIN CONCRETE CURBING, TYPE IV MODIFIED 186.000 LF 0060 636001-001 TRAFFIC CONTROL LUMP LUMP 0065 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 7.000 TN AA1 TYPE 1 0070 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 1 7.000 TN AA2 1 FEDERAL PROJECT PAGE 19 Call Order : 008 CONTRACT ID : 0931992 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U306-0HUN/TI-018.00 00 0ERP 2009 189 D00 COMPLETION DATE : 09/30/10 RES. ENG.: ROB PENNINGTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIDEWALKS 0006 204001-000 MOBILIZATION LUMP LUMP 0011 207009-000 UNCLASSIFIED EXCAVATION LUMP LUMP 0016 609001-001 CONCRETE SIDEWALK 4-IN, DECORATIVE RAILROAD STAMP 421.000 SY 0021 609001-001 CONCRETE SIDEWALK 6-IN, DECORATIVE RAILROAD STAMP 75.000 SY 0025 609002-001 BED COURSE MATERIAL 56.000 CY 0030 609005-001 CURB RAMP 3.000 EA 0035 609006-001 DETECTABLE WARNING SURFACE 3.000 EA 0046 636001-001 TRAFFIC CONTROL LUMP LUMP 0050 651001-001 FURNISHING AND PLACING TOPSOIL 39.000 CY 0056 662003-001 POLYVINYLCHLORIDE CONDUIT, (01) ( 1.00 ) LUMP 0060 662006-001 JUNCTION BOX, TYPE 10-IN X 10-IN 24.000 EA 0065 662006-001 JUNCTION BOX, TYPE 18-IN X 18-IN 1.000 EA 0071 662008-001 CABLE, (01) ( 1.00 ) LUMP 0076 662013-001 SERVICE AND CONTROL STATION, (01) LUMP LUMP 0081 662014-001 INCIDENTAL ELECTRICAL WORK (01) LUMP LUMP 0086 662015-001 ELECTRICAL TEST, (01) ( 1.00 ) LUMP 0091 663006-010 CROSSWALK LINE, TYPE V - 12 IN X 6 FT 289.000 LF 0096 672002-003 SITE FURNISHINGS, DECOMPOSED GRANITE PATH 2.000 EA 1 FEDERAL PROJECT PAGE 20 Call Order : 009 CONTRACT ID : 0931997 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U310-0MOU/NT-002.00 00 0ERP 2009 187 D00 COMPLETION DATE : 09/30/10 RES. ENG.: GREG HYLTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIDEWALKS 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207009-000 UNCLASSIFIED EXCAVATION LUMP LUMP 0015 601002-001 CLASS B CONCRETE 2.000 CY 0020 609001-001 CONCRETE SIDEWALK 4-IN 448.000 SY 0025 609001-001 CONCRETE SIDEWALK 6-IN 23.000 SY 0030 609002-001 BED COURSE MATERIAL 27.000 CY 0035 609005-001 CURB RAMP 4.000 EA 0040 609006-001 DETECTABLE WARNING SURFACE 4.000 EA 0045 610001-001 PLAIN CONCRETE CURBING, TYPE I 436.000 LF 0050 610001-004 PLAIN CONCRETE CURBING, TYPE IV 22.000 LF 0055 617001-002 PIPE RAILING, POWDER COATED - BLACK 50.500 LF 0060 636001-001 TRAFFIC CONTROL LUMP LUMP 0065 662002-001 GALVANIZED STEEL CONDUIT (01), 2-IN LUMP LUMP 0070 662002-001 GALVANIZED STEEL CONDUIT (01), 3-IN LUMP LUMP 0075 662006-001 JUNCTION BOX, TYPE 10-IN X 10-IN 13.000 EA 0080 662006-001 JUNCTION BOX, TYPE 18-IN X 18-IN 1.000 EA 0085 662007-001 LUMINAIRE, 175W, MH 9.000 EA 0090 662008-001 CABLE, (01) ( 1.00 ) LUMP 0095 662010-099 LIGHTING SUPPORT, TYPE DECORATIVE 9.000 EA 0100 662013-001 SERVICE AND CONTROL STATION, (01) LUMP LUMP 0105 662014-001 INCIDENTAL ELECTRICAL WORK (01) LUMP LUMP 0110 662015-001 ELECTRICAL TEST, (01) ( 1.00 ) LUMP 1 FEDERAL PROJECT PAGE 21 Call Order : 010 CONTRACT ID : 0931928 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S310-0OAK/HI-005.00 00 0ERP 2009 185 D00 COUNTIES : FAYETTE DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/10 RES. ENG.: GREG HYLTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CONSTRUCT PAVED WALK PATH 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207034-000 FABRIC FOR SEPARATION 11,628.000 SY 0015 211004-000 UNCLASSIFIED BORROW EXCAVATION LUMP LUMP 0020 607042-001 6 FT STEEL POST 6-IN X 6-IN SQUARE HINGED POST, LOCKABLE 3.000 EA 0025 607046-001 7 INCH ROUND X 6 FT TREATED WOOD POST 6.000 EA 0030 636001-001 TRAFFIC CONTROL LUMP LUMP 0035 642012-001 SILT FENCE 1,000.000 LF 0040 652002-001 FERTILIZER, 10-20-10 0.600 TN 0045 652003-001 SEED MIXTURES, B, C-1, OR C-2 113.000 LB 0050 652004-001 STRAW OR HAY MULCH 2.500 TN 0055 657005-001 WOOD SUPPORT, * 54.000 LF 0060 657008-001 2.00 LB CHANNEL POST 108.000 LF 0065 657010-001 3.00 LB CHANNEL POST 213.000 LF 0070 661001-001 0.080 IN FLAT SHEET SIGN 162.000 SF 0075 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 96.000 LF 0080 672002-003 SITE FURNISHINGS, BENCH 2.000 EA 0085 672002-003 SITE FURNISHINGS, PICNIC TABLE 1.000 EA 0090 672002-003 SITE FURNISHINGS, TRASH RECEPTACLE 2.000 EA 0095 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS I 1,765.000 TN AA1 0100 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS I 1,677.000 TN AA2 0105 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 2 1,280.000 TN BB1 1 FEDERAL PROJECT PAGE 22 Call Order : 010 CONTRACT ID : 0931928 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S310-0OAK/HI-005.00 00 0ERP 2009 185 D00 COUNTIES : FAYETTE DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/10 RES. ENG.: GREG HYLTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CONSTRUCT PAVED WALK PATH 0110 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 2 1,216.000 TN BB2 0115 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 640.000 TN CC1 TYPE I 0120 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE I 608.000 TN CC2 1 FEDERAL PROJECT PAGE 23 Call Order : 011 CONTRACT ID : 0931998 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U310-0NRG/PB-001.00 00 0ERP 2009 194 D00 COUNTIES : FAYETTE DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 0.00 PLANS COMPLETE : 0.00 PLANS WO X-SECTIONS : 0.00 COMPLETION DATE : 09/30/10 RES. ENG.: GREG HYLTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 PEDESTRIAN BRIDGE 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 72.000 CY 0020 211001-000 UNCLASSIFIED BORROW EXCAVATION 7.000 CY 0025 608001-002 4 FT RIGHT-OF-WAY FENCE, CHAIN LINK 131.000 LF 0030 608001-006 6 FT RIGHT-OF-WAY FENCE, CHAIN LINK 128.000 LF 0035 608001-008 8 FT RIGHT-OF-WAY FENCE, CHAIN LINK 336.000 LF 0040 609001-001 CONCRETE SIDEWALK 257.000 SY 0045 609002-001 BED COURSE MATERIAL 40.000 CY 0050 617001-001 PIPE RAILING 179.000 LF 0055 636011-001 TRAFFIC CONTROL DEVICE 14,560.000 UN 0060 636014-001 FLAGGER 200.000 HR 0065 636014-002 TRAFFIC DIRECTOR 200.000 HR 0070 636021-001 ELECTRIC ARROW 60.000 DA 0075 636022-001 CHANGEABLE MESSAGE SIGN 60.000 DA 0080 636025-001 WARNING LIGHTS, TYPE B 1,200.000 DA 0085 636028-001 SHADOW VEHICLE 60.000 DA 0090 636030-001 SPEED MONITORING TRAILER 60.000 DA 0095 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0100 642004-001 SEED MIXTURE, TEMPORARY 9.000 LB 0105 642004-002 SEED MIXTURE, B 18.000 LB 1 FEDERAL PROJECT PAGE 24 Call Order : 011 CONTRACT ID : 0931998 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U310-0NRG/PB-001.00 00 0ERP 2009 194 D00 COUNTIES : FAYETTE DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 0.00 PLANS COMPLETE : 0.00 PLANS WO X-SECTIONS : 0.00 COMPLETION DATE : 09/30/10 RES. ENG.: GREG HYLTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 PEDESTRIAN BRIDGE 0110 642004-003 SEED MIXTURE, D 13.000 LB 0115 642005-001 MULCH, STRAW OR HAY 0.400 TN 0120 642005-002 MULCH, WOOD CELLULOSE FIBER 0.200 TN 0125 642006-001 FERTILIZER 0.100 TN 0130 642010-001 AGRICULTURAL LIMESTONE 0.200 TN 0135 642012-001 SILT FENCE 400.000 LF 0140 652001-001 AGRICULTURAL LIMESTONE 0.100 TN 0145 652002-001 FERTILIZER, 10-20-10 0.100 TN 0150 652003-001 SEED MIXTURES, B, C-1, OR C-2 15.000 LB 0155 652003-002 SEED MIXTURE, D 10.500 LB 0160 652004-001 STRAW OR HAY MULCH 0.200 TN 0165 652004-002 WOOD CELLULOSE FIBER MULCH 0.200 TN 0170 654003-001 SHRUB, DECIDUOUS, VIBURNUM DENTATUM 5.000 EA 0175 662007-001 LUMINAIRE, 175 WATT 3.000 EA 0180 662014-001 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0185 662015-001 ELECTRICAL TEST, . ( 1.00 ) LUMP 0190 663006-010 CROSSWALK LINE, TYPE V - 12 IN X 6 FT 120.000 LF 0195 672002-003 SITE FURNISHINGS, BENCH 2.000 EA 0200 672002-003 SITE FURNISHINGS, TRASH RECEPTACLE 1.000 EA 0205 688002-001 CLEAN AND PAINT EXISTING STEEL BRIDGE COATED WITH LEAD BASE LUMP LUMP PAINT 0210 688003-001 CONTAINMENT AND DISPOSAL OF SPENT MATERIAL LUMP LUMP 1 FEDERAL PROJECT PAGE 25 Call Order : 012 CONTRACT ID : 0931926 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U313-0RAI/NE-002.00 00 0ERP 2009 190 D00 COMPLETION DATE : 09/30/10 RES. ENG.: GREG HYLTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIDEWALKS 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207009-000 UNCLASSIFIED EXCAVATION LUMP LUMP 0015 609001-001 CONCRETE SIDEWALK 4-IN 437.000 SY 0020 609001-001 CONCRETE SIDEWALK 6-IN 183.000 SY 0025 609002-001 BED COURSE MATERIAL 70.000 CY 0030 609005-001 CURB RAMP 5.000 EA 0035 609006-001 DETECTABLE WARNING SURFACE 5.000 EA 0040 610001-001 PLAIN CONCRETE CURBING, TYPE I 374.000 LF 0045 610001-004 PLAIN CONCRETE CURBING, TYPE IV 237.000 LF 0050 610003-001 COMBINATION CONCRETE CURB AND GUTTER, TYPE I 225.000 LF 0055 610003-004 COMBINATION CONCRETE CURB AND GUTTER, TYPE IV 174.000 LF 0060 636001-001 TRAFFIC CONTROL LUMP LUMP 1 FEDERAL PROJECT PAGE 26 Call Order : 013 CONTRACT ID : 0931927 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U313-0RON/CE-003.00 00 0ERP 2009 186 D00 COUNTIES : GREENBRIER DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/10 RES. ENG.: GREG HYLTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIDEWALKS 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207009-000 UNCLASSIFIED EXCAVATION LUMP LUMP 0015 601002-001 CLASS B CONCRETE 31.000 CY 0020 602001-001 REINFORCING STEEL BAR 3,529.000 LB 0025 604050-016 18 INCH CORRUGATED POLYETHYLENE PIPE 10.000 LF 0030 605004-001 TYPE B INLET 1.000 EA 0035 609001-001 CONCRETE SIDEWALK 4-IN 418.300 SY 0040 609001-001 CONCRETE SIDEWALK 6-IN 59.900 SY 0045 609001-001 CONCRETE SIDEWALK BRICK 66.300 SY 0050 609002-001 BED COURSE MATERIAL 55.800 CY 0055 609005-001 CURB RAMP 4.000 EA 0060 609006-001 DETECTABLE WARNING SURFACE 4.000 EA 0065 610001-001 PLAIN CONCRETE CURBING, TYPE I 609.200 LF 0070 610001-004 PLAIN CONCRETE CURBING, TYPE IV 109.800 LF 0075 610003-001 COMBINATION CONCRETE CURB AND GUTTER, TYPE I 258.000 LF 0080 610003-004 COMBINATION CONCRETE CURB AND GUTTER, TYPE IV 44.000 LF 0085 617001-002 PIPE RAILING, POWDER COATED, BLACK 178.000 LF 0090 636001-001 TRAFFIC CONTROL LUMP LUMP 0095 642004-002 SEED MIXTURE, B 95.000 LB 0100 642005-002 MULCH, WOOD CELLULOSE FIBER 0.800 TN 0105 642006-001 FERTILIZER 0.500 TN 1 FEDERAL PROJECT PAGE 27 Call Order : 013 CONTRACT ID : 0931927 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U313-0RON/CE-003.00 00 0ERP 2009 186 D00 COUNTIES : GREENBRIER DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/10 RES. ENG.: GREG HYLTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIDEWALKS 0110 642010-001 AGRICULTURAL LIMESTONE 2.000 TN 0115 642012-001 SILT FENCE 1,425.000 LF 0120 642031-001 DITCH CHECK 10.000 EA 0125 652001-001 AGRICULTURAL LIMESTONE 2.000 TN 0130 652002-001 FERTILIZER, 10-20-10 0.600 TN 0135 652003-001 SEED MIXTURES, B, C-1, OR C-2 110.000 LB 0140 652004-002 WOOD CELLULOSE FIBER MULCH 0.800 TN 0145 657008-001 2.00 LB CHANNEL POST 48.000 LF 0150 662002-001 GALVANIZED STEEL CONDUIT 2-IN (01) LUMP LUMP 0155 662002-001 GALVANIZED STEEL CONDUIT 2-IN (02) LUMP LUMP 0160 662002-001 GALVANIZED STEEL CONDUIT 2-IN (03) LUMP LUMP 0165 662002-001 GALVANIZED STEEL CONDUIT 2-IN (04) LUMP LUMP 0170 662002-001 GALVANIZED STEEL CONDUIT 3-IN (02) LUMP LUMP 0175 662006-001 JUNCTION BOX, TYPE H, 10-IN X 10-IN 2.000 EA 0180 662006-001 JUNCTION BOX, TYPE H, 18-IN X 18-IN 1.000 EA 0185 662007-001 LUMINAIRE, 175W, MH 4.000 EA 0190 662008-001 CABLE, (01) ( 1.00 ) LUMP 0195 662008-001 CABLE, (02) ( 1.00 ) LUMP 0200 662008-001 CABLE, (03) ( 1.00 ) LUMP 0205 662008-001 CABLE, (04) ( 1.00 ) LUMP 0210 662010-099 LIGHTING SUPPORT, TYPE DECORATIVE 4.000 EA 1 FEDERAL PROJECT PAGE 28 Call Order : 013 CONTRACT ID : 0931927 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U313-0RON/CE-003.00 00 0ERP 2009 186 D00 COUNTIES : GREENBRIER DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/10 RES. ENG.: GREG HYLTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIDEWALKS 0215 662013-001 SERVICE AND CONTROL STATION, (02) LUMP LUMP 0220 662013-001 SERVICE AND CONTROL STATION, (03) LUMP LUMP 0225 662014-001 INCIDENTAL ELECTRICAL WORK (01) LUMP LUMP 0230 662014-001 INCIDENTAL ELECTRICAL WORK (02) LUMP LUMP 0235 662014-001 INCIDENTAL ELECTRICAL WORK (03) LUMP LUMP 0240 662014-001 INCIDENTAL ELECTRICAL WORK (04) LUMP LUMP 0245 662015-001 ELECTRICAL TEST, (01) ( 1.00 ) LUMP 0250 662015-001 ELECTRICAL TEST, (02) ( 1.00 ) LUMP 0255 662015-001 ELECTRICAL TEST, (03) ( 1.00 ) LUMP 0260 662015-001 ELECTRICAL TEST, (04) ( 1.00 ) LUMP 1 FEDERAL PROJECT PAGE 29 Call Order : 014 CONTRACT ID : 0931987 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U320-0FLI/NN-002.00 00 0ERP 2009 180 D00 COUNTIES : KANAWHA DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 0.00 PLANS COMPLETE : 0.00 PLANS WO X-SECTIONS : 0.00 COMPLETION DATE : 09/30/10 RES. ENG.: WILLIAM J. KELLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIDEWALKS & CURBS 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 103.000 CY 0020 607066-001 TANGENT END TERMINAL 1.000 EA 0025 609001-001 CONCRETE SIDEWALK 565.000 SY 0030 609002-001 BED COURSE MATERIAL 94.000 CY 0035 609005-001 CURB RAMP 6.000 EA 0040 609006-001 DETECTABLE WARNING SURFACE 6.000 EA 0045 610001-001 PLAIN CONCRETE CURBING, TYPE I 843.000 LF 0050 610001-004 PLAIN CONCRETE CURBING, TYPE IV 469.000 LF 0055 636011-001 TRAFFIC CONTROL DEVICE 6,680.000 UN 0060 636014-001 FLAGGER 400.000 HR 0065 636021-001 ELECTRIC ARROW 180.000 DA 0070 636025-001 WARNING LIGHTS, TYPE B 360.000 DA 0075 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0080 642004-001 SEED MIXTURE, TEMPORARY 7.000 LB 0085 642004-003 SEED MIXTURE, D 10.000 LB 0090 642005-001 MULCH, STRAW OR HAY 0.300 TN 0095 642006-001 FERTILIZER 0.050 TN 0100 642010-001 AGRICULTURAL LIMESTONE 0.200 TN 0105 642012-001 SILT FENCE 1,059.000 LF 1 FEDERAL PROJECT PAGE 30 Call Order : 014 CONTRACT ID : 0931987 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U320-0FLI/NN-002.00 00 0ERP 2009 180 D00 COUNTIES : KANAWHA DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 0.00 PLANS COMPLETE : 0.00 PLANS WO X-SECTIONS : 0.00 COMPLETION DATE : 09/30/10 RES. ENG.: WILLIAM J. KELLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIDEWALKS & CURBS 0110 652001-001 AGRICULTURAL LIMESTONE 0.040 TN 0115 652002-001 FERTILIZER, 10-20-10 0.020 TN 0120 652003-002 SEED MIXTURE, D 2.400 LB 0125 652004-001 STRAW OR HAY MULCH 0.100 TN 0130 663006-010 CROSSWALK LINE, TYPE V - 12 IN X 6 FT 140.000 LF 0135 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 36.000 TN AA1 GRAVEL 0140 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 34.000 TN AA2 1 FEDERAL PROJECT PAGE 31 Call Order : 015 CONTRACT ID : 0931999 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S328-0PRI/NC-002.00 00 0ERP 2009 184 D00 COUNTIES : MERCER DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/10 RES. ENG.: PHIL WHITE ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CITY OF PRINCETON SIDEWALKS 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 431.000 CY 0015 609001-001 CONCRETE SIDEWALK 1,329.000 SY 0020 609002-001 BED COURSE MATERIAL 222.000 CY 0025 610001-001 PLAIN CONCRETE CURBING, TYPE I 1,169.000 LF 0030 610001-004 PLAIN CONCRETE CURBING, TYPE IV 298.000 LF 0035 636011-001 TRAFFIC CONTROL DEVICE 1,305.000 UN 0040 636014-001 FLAGGER 880.000 HR 0045 663007-010 STRIPE, TYPE V - 12 IN 12 INCH WHITE 656.000 LF 1 FEDERAL PROJECT PAGE 32 Call Order : 016 CONTRACT ID : 0931788 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U331-0GRA/NV-001.00 00 0ERP 2009 170 D00 COUNTIES : MONONGALIA DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/10 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIDEWALKS 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207009-000 UNCLASSIFIED EXCAVATION LUMP LUMP 0015 219001-001 CONTROLLED LOW STRENGTH MATERIAL, TYPE TYPE B 8.000 CY 0020 604050-012 15 INCH CORRUGATED POLYETHYLENE PIPE 12.000 LF 0025 605004-001 TYPE B INLET 12.000 EA 0030 609001-001 CONCRETE SIDEWALK 4-IN 1,542.000 SY 0035 609001-001 CONCRETE SIDEWALK 6-IN 1,080.000 SY 0040 609002-001 BED COURSE MATERIAL 226.000 CY 0045 609005-001 CURB RAMP 4.000 EA 0050 609006-001 DETECTABLE WARNING SURFACE 38.000 EA 0055 610003-001 COMBINATION CONCRETE CURB AND GUTTER, TYPE I 2,719.000 LF 0060 610003-004 COMBINATION CONCRETE CURB AND GUTTER, TYPE IV 1,865.000 LF 0065 636001-001 TRAFFIC CONTROL LUMP LUMP 0070 662002-001 GALVANIZED STEEL CONDUIT 2-IN LUMP LUMP 0075 662002-001 GALVANIZED STEEL CONDUIT 3-IN LUMP LUMP 0080 662006-001 JUNCTION BOX, TYPE 10-IN X 10-IN 42.000 EA 0085 662006-001 JUNCTION BOX, TYPE 18-IN X 18-IN 4.000 EA 0090 663006-010 CROSSWALK LINE, TYPE V - 12 IN X 6 FT 60.000 LF 1 FEDERAL PROJECT PAGE 33 Call Order : 017 CONTRACT ID : 0931791 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U337-0STM/AR-001.00 00 0ERP 2009 172 D00 COUNTIES : PLEASANTS DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/10 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIDEWALKS AND LIGHTING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207009-000 UNCLASSIFIED EXCAVATION LUMP LUMP 0015 604050-010 12 INCH CORRUGATED POLYETHYLENE PIPE SMOOTH LINED 2.000 LF 0020 605001-001 TYPE A MANHOLE 1.000 EA 0025 605004-001 TYPE B INLET 1.000 EA 0030 605004-005 CONCRETE BOX DITCH 9.000 LF 0035 609001-001 CONCRETE SIDEWALK 754.000 SY 0040 609002-001 BED COURSE MATERIAL 86.000 CY 0045 609005-001 CURB RAMP TYPE I 2.000 EA 0050 609005-001 CURB RAMP TYPE III 3.000 EA 0055 609005-001 CURB RAMP TYPE IV 1.000 EA 0060 609006-001 DETECTABLE WARNING SURFACE 6.000 EA 0065 610003-001 COMBINATION CONCRETE CURB AND GUTTER, TYPE I 255.000 LF 0070 610003-004 COMBINATION CONCRETE CURB AND GUTTER, TYPE IV 208.000 LF 0075 636001-001 TRAFFIC CONTROL LUMP LUMP 0080 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0085 654001-001 TREE, DECIDUOUS, HORNBEAM 4.000 EA 0090 654007-001 PLANTING DECIDUOUS TREE, HORNBEAM 1.000 EA 0095 657010-001 3.00 LB CHANNEL POST 54.000 LF 0100 661001-001 0.080 IN FLAT SHEET SIGN 29.000 SF 0105 662002-001 GALVANIZED STEEL CONDUIT LUMP LUMP 1 FEDERAL PROJECT PAGE 34 Call Order : 017 CONTRACT ID : 0931791 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U337-0STM/AR-001.00 00 0ERP 2009 172 D00 COUNTIES : PLEASANTS DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/10 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIDEWALKS AND LIGHTING 0110 662006-001 JUNCTION BOX, TYPE H, 10X10 5.000 EA 0115 662006-001 JUNCTION BOX, TYPE H, 18X18 1.000 EA 0120 662007-001 LUMINAIRE, 150W, HPS 5.000 EA 0125 662008-001 CABLE, 01 ( 1.00 ) LUMP 0130 662010-099 LIGHTING SUPPORT, TYPE 14'-6 5.000 EA 0135 662013-001 SERVICE AND CONTROL STATION, 01 LUMP LUMP 0140 662014-001 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0145 662015-001 ELECTRICAL TEST, 01 ( 1.00 ) LUMP 0150 672002-002 SITE FURNISHINGS, BENCHES, TRASH RECEPTICLES LUMP LUMP 1 FEDERAL PROJECT PAGE 35 Call Order : 018 CONTRACT ID : 0931994 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U341-0MAB/SC-001.00 00 0ERP 2009 193 D00 COMPLETION DATE : 09/30/10 RES. ENG.: PHIL WHITE ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 MABSCOTT SIDEWALKS 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 100.000 CY 0015 609001-001 CONCRETE SIDEWALK 585.000 SY 0020 609002-001 BED COURSE MATERIAL 125.000 CY 0025 636011-001 TRAFFIC CONTROL DEVICE 880.000 UN 0030 636014-001 FLAGGER 40.000 HR 1 FEDERAL PROJECT PAGE 36 Call Order : 019 CONTRACT ID : 0931990 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U344-0SPE/NC-001.00 03 ERP0 2009 182 D00 COMPLETION DATE : 09/30/10 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIDEWALKS 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207009-000 UNCLASSIFIED EXCAVATION LUMP LUMP 0015 605004-005 CONCRETE BOX DITCH 7.000 LF 0020 609001-001 CONCRETE SIDEWALK 312.000 SY 0025 609002-001 BED COURSE MATERIAL 36.000 CY 0030 609005-001 CURB RAMP 2.000 EA 0035 609006-001 DETECTABLE WARNING SURFACE 2.000 EA 0040 610001-001 PLAIN CONCRETE CURBING, TYPE I 245.000 LF 0045 610001-004 PLAIN CONCRETE CURBING, TYPE IV 98.000 LF 0050 636001-001 TRAFFIC CONTROL LUMP LUMP 0055 662002-001 GALVANIZED STEEL CONDUIT LUMP LUMP 0060 662006-001 JUNCTION BOX, TYPE H, 10X10 3.000 EA 0065 662006-001 JUNCTION BOX, TYPE H, 18X18 1.000 EA 0070 662007-001 LUMINAIRE, 150 W, HPS 3.000 EA 0075 662008-001 CABLE, 01 ( 1.00 ) LUMP 0080 662010-099 LIGHTING SUPPORT, TYPE 14' 3.000 EA 0085 662013-001 SERVICE AND CONTROL STATION, 01 LUMP LUMP 0090 662014-001 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0095 662015-001 ELECTRICAL TEST, 01 ( 1.00 ) LUMP 0100 672002-002 SITE FURNISHINGS, BENCHES, AND TRASH RECEPTICLES LUMP LUMP 1 FEDERAL PROJECT PAGE 37 Call Order : 020 CONTRACT ID : 0931991 Letting Date : 04/20/10 10:00 A.M. PROJECTS : U351-0BAK/ER-001.00 00 0ERP 2009 192 D00 COMPLETION DATE : 09/30/10 RES. ENG.: RODNEY MYERS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CONSTRUCT PAVED WALK PATH 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207009-000 UNCLASSIFIED EXCAVATION LUMP LUMP 0015 207034-000 FABRIC FOR SEPARATION 994.000 SY 0020 211004-000 UNCLASSIFIED BORROW EXCAVATION LUMP LUMP 0025 609001-001 CONCRETE SIDEWALK 4-IN 7.000 SY 0030 609002-001 BED COURSE MATERIAL 1.000 CY 0035 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0040 642012-001 SILT FENCE 1,000.000 LF 0045 652002-001 FERTILIZER, 10-20-10 0.050 TN 0050 652003-001 SEED MIXTURES, B, C-1, OR C-2 10.000 LB 0055 652004-001 STRAW OR HAY MULCH 0.080 TN 0060 663001-004 EDGE LINE, TYPE II - 4 IN BLUE 370.000 LF 0065 663009-015 HANDICAPPED SYMBOL, TYPE V 2.000 EA 0070 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS I 199.000 TN AA1 0075 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS I 189.000 TN AA2 0080 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 283.000 TN BB1 TYPE IV 0085 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE IV 269.000 TN BB2 1 FEDERAL PROJECT PAGE 38 Call Order : 021 CONTRACT ID : 1000526 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S313-0060/00-032.63 00 ACST 0060 258 D00 COMPLETION DATE : 06/30/10 RES. ENG.: GREG HYLTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING PROJECT 0005 207001-001 UNCLASSIFIED EXCAVATION 1,231.000 CY 0010 408002-001 BITUMINOUS MATERIAL 1,336.000 GA 0015 415005-001 REMOVE EXISTING PAVEMENT SURFACE 942.000 SY 0020 636006-001 PILOT TRUCK AND DRIVER 17.000 DA 0025 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN (WHITE) 24,926.000 LF 0030 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN (YELLOW) 23,904.000 LF 0035 636011-001 TRAFFIC CONTROL DEVICE 18,370.000 UN 0040 636014-001 FLAGGER 408.000 HR 0045 642012-001 SILT FENCE 575.000 LF 0050 642031-001 DITCH CHECK 250.000 EA 0055 663001-004 EDGE LINE, TYPE II - 4 IN (WHITE) 24,926.000 LF 0060 663002-038 CENTERLINE, TYPE II - 4 IN 23,904.000 LF 0065 675018-001 ADJUSTING MANHOLE 7.000 EA 0070 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 295.000 TN AA1 0075 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 269.000 TN AA2 0080 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE I 2,438.000 TN BB1 0085 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE I 2,219.000 TN BB2 0090 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 1,448.000 TN CC1 0095 401007-002 MARSHALL SCRATCH COURSE, SLAG 1,318.000 TN CC2 0100 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 3,674.000 TN DD1 GRAVEL, TYPE I 0105 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE I 3,343.000 TN DD2 1 STATE PROJECT PAGE 39 Call Order : 022 CONTRACT ID : 0925172 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S320-0016/00-001.91 00 COMPLETION DATE : 06/18/10 RES. ENG.: WILLIAM J. KELLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SLIDE CORRECTION 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 206.000 CY 0020 207034-000 FABRIC FOR SEPARATION 167.000 SY 0025 229001-000 SHOULDER AND DITCH 0.060 MI 0030 408002-001 BITUMINOUS MATERIAL 7.000 GA 0035 415005-001 REMOVE EXISTING PAVEMENT SURFACE 181.000 SY 0040 604050-012 15 INCH CORRUGATED POLYETHYLENE PIPE 35.000 LF 0045 607001-001 TYPE 1 GUARDRAIL, CLASS 1 212.500 LF 0050 607066-001 TANGENT END TERMINAL 1.000 EA 0055 614001-003 HP10X42 STEEL PILE 1,150.000 LF 0060 614004-001 TIMBER LAGGING 545.000 SF 0065 636011-001 TRAFFIC CONTROL DEVICE 2,640.000 UN 0070 636014-001 FLAGGER 100.000 HR 0075 636022-001 CHANGEABLE MESSAGE SIGN 56.000 DA 0080 636025-001 WARNING LIGHTS, TYPE B 120.000 DA 0085 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0090 642012-001 SILT FENCE 150.000 LF 0095 652002-001 FERTILIZER, 10-20-10 0.030 TN 0100 652003-001 SEED MIXTURES, B, C-1, OR C-2 10.000 LB 0105 652004-001 STRAW OR HAY MULCH 0.080 TN 0110 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1 124.000 TN AA1 0115 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1 124.000 TN AA2 1 STATE PROJECT PAGE 40 Call Order : 022 CONTRACT ID : 0925172 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S320-0016/00-001.91 00 COMPLETION DATE : 06/18/10 RES. ENG.: WILLIAM J. KELLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SLIDE CORRECTION 0120 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 7 126.000 TN BB1 0125 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 7 126.000 TN BB2 0130 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 12.000 TN CC1 0135 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 12.000 TN CC2 0140 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 1 69.000 TN DD1 0145 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 1 69.000 TN DD2 0150 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 23.000 TN EE1 TYPE 1 0155 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 1 23.000 TN EE2 1 STATE PROJECT PAGE 41 Call Order : 023 CONTRACT ID : 0703001 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S325-0019/00-007.97 02 COMPLETION DATE : 10/29/10 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DEMOLITION 0005 202001-000 BUILDING DEMOLITION NUMBER, 1-1 ( 1.00 ) LUMP 0010 202001-000 BUILDING DEMOLITION NUMBER, 1-2 ( 1.00 ) LUMP 0015 204001-000 MOBILIZATION LUMP LUMP 0020 636011-001 TRAFFIC CONTROL DEVICE 1,385.000 UN 0025 636014-001 FLAGGER 300.000 HR 0030 681001-001 ASBESTOS ABATEMENT, NUMBER 1-2 LUMP LUMP 1 STATE PROJECT PAGE 42 Call Order : 024 CONTRACT ID : 0814408 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S326-0250/00-019.16 00 COMPLETION DATE : 11/15/10 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SLIP REPAIR VIA STEEL PILING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 612.000 CY 0015 211009-000 SELECT BORROW EXCAVATION 418.000 TN 0020 229001-000 SHOULDER AND DITCH 0.110 MI 0025 408002-001 BITUMINOUS MATERIAL 47.000 GA 0030 604050-016 18 INCH CORRUGATED POLYETHYLENE PIPE 18.000 LF 0035 607001-001 TYPE 1 GUARDRAIL, CLASS 1 137.500 LF 0040 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 225.000 LF 0045 607010-020 GUARDRAIL REMOVAL 137.500 LF 0050 614001-006 HP12X53 STEEL PILE 1,633.000 LF 0055 614003-001 CONCRETE LAGGING, THICKNESS 5'9" X 8" 2,403.500 SF 0060 636009-001 TEMPORARY PAVEMENT MARKING-TAPE 4 IN WHITE TY. VIIB 144.000 LF 0065 636011-001 TRAFFIC CONTROL DEVICE 4,280.000 UN 0070 636014-001 FLAGGER 50.000 HR 0075 636023-001 TEMPORARY TRAFFIC SIGNAL ( 1.00 ) LUMP 0080 642004-002 SEED MIXTURE, B 9.000 LB 0085 642005-002 MULCH, WOOD CELLULOSE FIBER 0.070 TN 0090 642006-001 FERTILIZER 0.040 TN 0095 642012-001 SILT FENCE 386.000 LF 0100 642031-001 DITCH CHECK 3.000 EA 0105 663001-004 EDGE LINE, TYPE II - 4 IN PERM. WHITE 1,212.000 LF 0110 663001-004 EDGE LINE, TYPE II - 4 IN TEMP. WHITE 1,212.000 LF 0115 663002-038 CENTERLINE, TYPE II - 4 IN PERM. YELLOW 1,212.000 LF 1 STATE PROJECT PAGE 43 Call Order : 024 CONTRACT ID : 0814408 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S326-0250/00-019.16 00 COMPLETION DATE : 11/15/10 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SLIP REPAIR VIA STEEL PILING 0120 663002-038 CENTERLINE, TYPE II - 4 IN TEMP. YELLOW 1,212.000 LF 0125 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1 162.000 TN AA1 0130 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1 159.000 TN AA2 0135 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 2 56.000 TN BB1 0140 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 2 55.000 TN BB2 0145 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 101.000 TN CC1 GRAVEL 0150 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 99.000 TN CC2 0155 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 161.000 TN DD1 GRAVEL, TYPE 1 0160 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 158.000 TN DD2 0165 636002-001 AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 70.000 TN EE1 0170 636002-002 AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 69.000 TN EE2 1 FEDERAL PROJECT PAGE 44 Call Order : 025 CONTRACT ID : 0919888 Letting Date : 04/20/10 10:00 A.M. PROJECTS : E330-0252/07-C05.09 01 FEMA 1838 000 000 COMPLETION DATE : 10/29/10 RES. ENG.: ROB PENNINGTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE #10915 0005 627010-001 ASAP BRIDGE, COON BRANCH BRIDGE LUMP LUMP 1 STATE PROJECT PAGE 45 Call Order : 026 CONTRACT ID : 0830380 Letting Date : 04/20/10 10:00 A.M. PROJECTS : X336-0220/00-010.96 00 COUNTIES : PENDLETON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/11/10 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BLAST QUARRY 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207009-000 UNCLASSIFIED EXCAVATION LUMP LUMP 0020 636011-001 TRAFFIC CONTROL DEVICE 1,710.000 UN 0025 636014-001 FLAGGER 10.000 HR 0030 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0035 652002-001 FERTILIZER, 10-20-10 0.380 TN 0040 652003-001 SEED MIXTURES, B, C-1, OR C-2 75.000 LB 0045 652004-001 STRAW OR HAY MULCH 1.500 TN 1 STATE PROJECT PAGE 46 Call Order : 027 CONTRACT ID : 0814821 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S344-0029/00-007.23 00 COMPLETION DATE : 06/11/10 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SLIP REPAIR 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 12.000 CY 0015 307001-000 AGGREGATE BASE COURSE, CLASS 1 14.000 CY 0020 607001-001 TYPE 1 GUARDRAIL, CLASS 2 225.000 LF 0025 614001-003 HP10X42 STEEL PILE 1,230.000 LF 0030 614003-001 CONCRETE LAGGING, THICKNESS 6" 915.000 SF 0035 636002-001 AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 44.000 TN 0040 636011-001 TRAFFIC CONTROL DEVICE 2,040.000 UN 0045 636014-001 FLAGGER 380.000 HR 0050 636025-001 WARNING LIGHTS, TYPE B 38.000 DA 0055 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 1 STATE PROJECT PAGE 47 Call Order : 028 CONTRACT ID : 0818303 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S347-0007/00-002.02 00 COUNTIES : TUCKER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/18/10 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CORR SLIDE(PILING) 0005 204001-000 MOBILIZATION LUMP LUMP 0010 217001-000 SPECIAL ROCK FILL 45.000 CY 0015 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 100.000 LF 0020 614001-004 HP10X57 STEEL PILE 575.000 LF 0025 614003-001 CONCRETE LAGGING, THICKNESS 6" 550.000 SF 0030 636011-001 TRAFFIC CONTROL DEVICE 2,460.000 UN 0035 636014-001 FLAGGER 400.000 HR 0040 636025-001 WARNING LIGHTS, TYPE B 200.000 DA 0045 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0050 642012-001 SILT FENCE 200.000 LF 0055 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1 18.000 TN AA1 0060 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1 17.000 TN AA2 1 STATE PROJECT PAGE 48 Call Order : 029 CONTRACT ID : 0928871 Letting Date : 04/20/10 10:00 A.M. PROJECTS : S347-0047/00-002.35 00 COUNTIES : TUCKER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/09/10 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CORR SLIDE(PILING) 0005 204001-000 MOBILIZATION LUMP LUMP 0010 212005-000 SELECT MATERIAL FOR BACKFILLING , AASHTO #1 64.000 CY 0015 212005-000 SELECT MATERIAL FOR BACKFILLING , AASHTO #57 40.000 CY 0020 606025-004 6 INCH UNDERDRAIN PIPE 205.000 LF 0025 614001-007 HP12X63 STEEL PILE 1,275.000 LF 0030 614003-001 CONCRETE LAGGING, THICKNESS 6" 2,184.000 SF 0035 636011-001 TRAFFIC CONTROL DEVICE 2,460.000 UN 0040 636014-001 FLAGGER 1,000.000 HR 0045 636025-001 WARNING LIGHTS, TYPE B 530.000 DA 0050 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0055 642012-001 SILT FENCE 300.000 LF 1 FEDERAL PROJECT PAGE 49 Call Order : 030 CONTRACT ID : 1003231 Letting Date : 04/20/10 10:00 A.M. PROJECTS : E350-0037/06-000.85 00 FEMA 1696 000 000 COMPLETION DATE : 06/11/10 RES. ENG.: ROB PENNINGTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 PILING WALL 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 164.000 CY 0015 211002-000 ROCK BORROW EXCAVATION 123.000 CY 0020 229001-000 SHOULDER AND DITCH 0.020 MI 0025 307001-000 AGGREGATE BASE COURSE, CLASS 1 14.000 CY 0030 408002-001 BITUMINOUS MATERIAL 2.000 GA 0035 607001-001 TYPE 1 GUARDRAIL, CLASS 1 92.000 LF 0040 614001-003 HP10X42 STEEL PILE 528.000 LF 0045 614003-001 CONCRETE LAGGING, THICKNESS 6" 552.000 SF 0050 636011-001 TRAFFIC CONTROL DEVICE 1,360.000 UN 0055 636014-001 FLAGGER 288.000 HR 0060 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 3.000 TN AA1 0065 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 2.680 TN AA2 0070 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 2 54.000 TN BB1 0075 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 2 52.000 TN BB2 0080 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 7.000 TN CC1 TYPE 1 0085 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 1 6.400 TN CC2