WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- August 28, 2012 LETTING Bids will be received electronically by the West Virginia Department of Transportation, Division of Highways through the Bid Express Bidding Service (www.bidx.com) and by sealed proposals (only when prequalification is waived) being received at its office in Building 5, Room A-748, 1900 Kanawha Boulevard East, Charleston, West Virginia until August 28, 2012 at 10:00 AM (Eastern Standard Time). The bids will be downloaded and/or opened and read publically thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 1203851R1 X050-0POR/T0-010.00 00 0TIG 0003 243 000 CONST NEW/RELOC 2 LANE ROAD W/BRIDGE(S) PRICHARD INTERMODAL FACILITY CONST RDWY BR BLDG RR COUNTYWIDE COUNTY: WAYNE BRIDGE : 11087 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 1 ; STRUCTURE STEEL: 455,137.00 DBE GOAL: 4 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. CONTRACT: 1203851 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. REMARKS : MANDATORY PREBID 8/7 @ 1 PM, RM 122 ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Electronic Bids, (via the Bid Express Bidding Service www.bidx.com), will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors’ license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12, of the West Virginia Code. All contractors submitting bids on project(s) should use the Electronic Bid Bond Service compatible with BIDX. If electronic bid bond service is not used, contractors must submit a proposal guarantee bond, cashers check, or certified check for $500.00 or 5% of total bid, whichever is greater prior to bid reading. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained thru BIDX or at the Charleston office. The right is reserved to reject any or all proposals * These are projects on which any contractor with a Category “W” Prequalification rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals shall be purchased through the Bid Express Bidding Service at www.bidx.com. The above noted project information will be available in the Contract Unit, Contract Administration Division, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly reading bids for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid subscription with BIDX will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly read. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national origin in consideration for an award. It is necessary to submit your approximate uncompleted workload prior to submitting a bid when you are over your prequalification limit. The reading of bids received will be in the order as designated in the “Notice to Contractors”. Sealed proposals (when prequalification has been waived) may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9:00 A.M. and 10:00 A.M., on the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX – BUILDING 5 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGNIA DEPARTMENT OF TRANSPORATION Division of Highways Robert L. Pennington, P.E. Director of Program Planning and Administration 1 FEDERAL PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS DESCRIPTION: PRICHARD INTERMODAL FACILITY CONST RDWY BR BLDG RR MANDATORY PREBID 8/7 @ 1 PM, RM 122 ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE J000 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202001-000 BUILDING DEMOLITION NUMBER, 1/1 ( 1.00 ) LUMP 0015 202001-000 BUILDING DEMOLITION NUMBER, 1/2 ( 1.00 ) LUMP 0020 202001-000 BUILDING DEMOLITION NUMBER, 2/1 ( 1.00 ) LUMP 0025 202001-000 BUILDING DEMOLITION NUMBER, 2/2 ( 1.00 ) LUMP 0030 202001-000 BUILDING DEMOLITION NUMBER, 2/3 ( 1.00 ) LUMP 0035 202001-000 BUILDING DEMOLITION NUMBER, 2/4 ( 1.00 ) LUMP 0040 202001-000 BUILDING DEMOLITION NUMBER, 3/1 ( 1.00 ) LUMP 0045 202001-000 BUILDING DEMOLITION NUMBER, 3/2 ( 1.00 ) LUMP 0050 202001-000 BUILDING DEMOLITION NUMBER, 3/3 ( 1.00 ) LUMP 0055 202001-000 BUILDING DEMOLITION NUMBER, 4/1 ( 1.00 ) LUMP 0060 202001-000 BUILDING DEMOLITION NUMBER, 4/2 ( 1.00 ) LUMP 0065 202001-000 BUILDING DEMOLITION NUMBER, 4/3 ( 1.00 ) LUMP 0070 202001-000 BUILDING DEMOLITION NUMBER, 5-1/1 ( 1.00 ) LUMP 0075 202001-000 BUILDING DEMOLITION NUMBER, 5-2/1 ( 1.00 ) LUMP 0080 202001-000 BUILDING DEMOLITION NUMBER, 5-2/2 ( 1.00 ) LUMP 0085 202001-000 BUILDING DEMOLITION NUMBER, 5-2/3 ( 1.00 ) LUMP 0090 202001-000 BUILDING DEMOLITION NUMBER, 5-2/4 ( 1.00 ) LUMP 0095 202001-000 BUILDING DEMOLITION NUMBER, 5-2/5 ( 1.00 ) LUMP 0100 202001-000 BUILDING DEMOLITION NUMBER, 5-2/6 ( 1.00 ) LUMP 1 FEDERAL PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE J000 0105 202001-000 BUILDING DEMOLITION NUMBER, 7/1 ( 1.00 ) LUMP 0110 202001-000 BUILDING DEMOLITION NUMBER, 7/2 ( 1.00 ) LUMP 0115 202001-000 BUILDING DEMOLITION NUMBER, 7/3 ( 1.00 ) LUMP 0120 202001-000 BUILDING DEMOLITION NUMBER, 8/1 ( 1.00 ) LUMP 0125 202001-000 BUILDING DEMOLITION NUMBER, 8/2 ( 1.00 ) LUMP 0130 202001-000 BUILDING DEMOLITION NUMBER, 8/3 ( 1.00 ) LUMP 0135 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 2/5 LUMP LUMP 0140 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 3/4 LUMP LUMP 0145 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 4/4 LUMP LUMP 0150 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 4/5 LUMP LUMP 0155 204001-000 MOBILIZATION LUMP LUMP 0160 207001-001 UNCLASSIFIED EXCAVATION 274,576.000 CY 0165 207002-000 SUBGRADE 2,268.000 CY 0170 207034-000 FABRIC FOR SEPARATION 11,200.000 SY 0175 211001-000 UNCLASSIFIED BORROW EXCAVATION 452,034.000 CY 0180 211002-000 ROCK BORROW EXCAVATION 32,225.000 CY 0185 212004-000 COFFERDAM 2.000 EA 0190 307001-000 AGGREGATE BASE COURSE, CLASS 1 246.000 CY 0195 307001-000 AGGREGATE BASE COURSE, CLASS 10 452.000 CY 0200 311006-001 OPEN GRADED FREE DRAINING BASE COURSE 1,387.000 CY 0210 501005-010 10 INCH NON-REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT 10,034.000 SY 1 FEDERAL PROJECT PAGE 3 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE J000 0215 502001-012 12 INCH PORTLAND CEMENT CONCRETE APPROACH SLAB 191.000 SY 0220 603028-001 PRECAST REINFORCED CONCRETE WINGWALL 403.000 SF 0225 604009-016 18 INCH CORRUGATED STEEL PIPE END SECTION 3.000 EA 0230 604009-020 24 INCH CORRUGATED STEEL PIPE END SECTION 2.000 EA 0235 604037-016 18 INCH REINFORCED CONCRETE PIPE, CLASS V 488.000 LF 0240 604037-020 24 INCH REINFORCED CONCRETE PIPE, CLASS V 539.000 LF 0245 604037-032 60 INCH REINFORCED CONCRETE PIPE, CLASS V 798.000 LF 0250 604052-004 6 INCH POLYVINYLCHLORIDE PIPE 34.000 LF 0255 604076-012 15 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, H7 379.000 LF 0260 604076-016 18 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, H7 1,365.000 LF 0265 604076-020 24 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, H7 1,849.000 LF 0270 604076-022 30 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, H7 1,713.000 LF 0275 605001-001 TYPE A MANHOLE 7.000 EA 0280 605003-001 TYPE A INLET 18.000 EA 0285 605004-001 TYPE B INLET 7.000 EA 0290 605008-001 TYPE F INLET 2.000 EA 0295 605009-001 TYPE G INLET 11.000 EA 0300 605016-001 MODIFIED MANHOLE TYPE A 1.000 EA 0304 606029-001 FREE DRAINING BASE TRENCH 8,500.000 LF 0305 606025-008 12 INCH UNDERDRAIN PIPE 2,706.000 LF 0310 606030-001 OUTLET PIPE, 12 INCH 247.000 LF 1 FEDERAL PROJECT PAGE 4 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE J000 0311 606030-001 OUTLET PIPE, 6 INCH 2,500.000 LF 0315 607001-001 TYPE 1 GUARDRAIL, CLASS I 3,488.000 LF 0320 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 4.000 EA 0325 607066-001 TANGENT END TERMINAL 6.000 EA 0330 633003-001 DUMPED ROCK GUTTER 44.000 CY 0335 636007-001 ERADICATION OF PAVEMENT MARKING 90.000 LF 0340 636011-001 TRAFFIC CONTROL DEVICE 6,760.000 UN 0345 636012-010 PROJECT TRAFFIC CONTROL DEVICE CLEANING 1.000 EA 0350 636014-001 FLAGGER 400.000 HR 0355 637001-001 WATER FOR DUST PALLIATIVE 1,268.000 MG 0360 638004-001 OUTLET MARKER 4.000 EA 0365 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0370 640001-001 STANDARD FIELD OFFICE AND STORAGE BUILDING 24.000 MO 0375 640003-001 BUILDING EQUIPMENT LUMP LUMP 0380 641030-001 STREAM BED MATERIAL 80.000 CY 0385 642001-001 TEMPORARY BERM 8,818.000 LF 0390 642004-001 SEED MIXTURE, TEMPORARY 10,920.000 LB 0395 642005-001 MULCH, STRAW OR HAY 368.000 TN 0400 642006-001 FERTILIZER 23.000 TN 0405 642010-001 AGRICULTURAL LIMESTONE 87.000 TN 0410 642012-001 SILT FENCE 12,859.000 LF 1 FEDERAL PROJECT PAGE 5 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE J000 0415 642015-001 SUPER SILT FENCE 6,141.000 LF 0420 642031-001 DITCH CHECK 9.000 EA 0425 642033-001 SEDIMENT TRAP 4,388.000 CY 0430 642036-001 SEDIMENT REMOVAL 2,192.000 CY 0435 642040-001 INLET PROTECTION 36.000 EA 0440 642042-001 FLOCCULANT BLOCK 18.000 EA 0445 642050-001 DEWATERING DEVICE 2.000 EA 0450 652001-001 AGRICULTURAL LIMESTONE 134.000 TN 0455 652002-001 FERTILIZER, 10-20-10 36.000 TN 0460 652002-002 FERTILIZER, UREA FORMALDEHYDE 13.000 TN 0465 652003-001 SEED MIXTURES, B, C-1, OR C-2 3,627.000 LB 0470 652003-002 SEED MIXTURE, D 3,675.000 LB 0475 652004-001 STRAW OR HAY MULCH 179.000 TN 0480 655002-001 PERMANENT EROSION MATTING, TYPE A 16,048.000 SY 0485 699000-001 ON JOB TRAINING 2,000.000 HR SECTION NO. 0002 SIGNING & PAVEMENT MARKINGS Y002 0490 657008-001 2.00 LB CHANNEL POST 260.000 LF 0495 657010-001 3.00 LB CHANNEL POST 60.000 LF 0500 657012-001 4.00 LB BACK TO BACK CHANNEL POST 70.000 LF 0505 661001-001 0.080 IN FLAT SHEET SIGN 221.000 SF 0510 661006-001 DELINEATOR, NINE PER UNIT, YELLOW 1.000 UN 1 FEDERAL PROJECT PAGE 6 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 SIGNING & PAVEMENT MARKINGS Y002 0515 661013-001 PLASTIC DELINEATOR POST, WHITE, ONE SIDED 5.000 EA 0520 661013-001 PLASTIC DELINEATOR POST, WHITE, TWO SIDED 5.000 EA 0525 661020-001 DELINEATOR, TYPE B-1 WHITE, ONE SIDED 13.000 EA 0530 661020-001 DELINEATOR, TYPE B-1 WHITE, TWO SIDED 57.000 EA 0535 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 7,515.000 LF 0540 663002-005 LANE LINE, TYPE II - 4 IN WHITE 915.000 LF 0545 663002-005 LANE LINE, TYPE II - 4 IN YELLOW 15,265.000 LF 0550 663002-038 CENTERLINE, TYPE II - 4 IN 4,520.000 LF 0555 663005-011 STOP LINE, TYPE V - 24 IN 570.000 LF 0560 663007-010 STRIPE, TYPE V - 12 IN WHITE 210.000 LF 0565 663007-010 STRIPE, TYPE V - 12 IN YELLOW 415.000 LF 0570 663009-015 HANDICAPPED SYMBOL, TYPE V 2.000 EA SECTION NO. 0003 BOX CULVERT Y007 0575 212001-000 STRUCTURE EXCAVATION 1,904.000 CY 0580 212005-000 SELECT MATERIAL FOR BACKFILLING 815.000 CY 0585 601002-001 CLASS B CONCRETE 435.000 CY 0590 601025-001 MODIFIED CONCRETE, CLASS B, 4000PSI 1,000.000 CY 0595 602001-001 REINFORCING STEEL BAR 169,688.000 LB 0600 616004-003 HP10X42 STEEL BEARING PILE, DRIVEN 2,160.000 LF 0605 616004-017 HP14X89 STEEL BEARING PILE, DRIVEN 1,380.000 LF 0610 616007-001 PILE LOADING TEST, DYNAMIC 7.000 EA 1 FEDERAL PROJECT PAGE 7 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0003 BOX CULVERT Y007 0615 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP SECTION NO. 0004 BRIDGE #11087 X131 0620 207035-001 SETTLEMENT PLATE ASSEMBLY 4.000 EA 0625 212005-000 SELECT MATERIAL FOR BACKFILLING 136.000 CY 0630 601002-001 CLASS B CONCRETE 389.000 CY 0635 601003-001 CLASS K CONCRETE 35.000 CY 0640 601009-001 CLASS H CONCRETE 313.000 CY 0645 602001-001 REINFORCING STEEL BAR 48,105.000 LB 0650 602002-001 EPOXY COATED REINFORCING STEEL BAR 47,973.000 LB 0655 608001-006 6 FT RIGHT-OF-WAY FENCE, CHAIN LINK 376.000 LF 0660 615001-001 STEEL SUPERSTRUCTURE ( 455,137.00 ) LUMP 0665 615028-001 GUIDED BEARING, ELASTOMERIC 8.000 EA 0670 616004-018 HP14X102 STEEL BEARING PILE, DRIVEN 4,472.000 LF 0675 616007-001 PILE LOADING TEST, DYNAMIC 4.000 EA 0680 616007-001 PILE LOADING TEST, DYNAMIC (RESTRIKE) 6.000 EA 0685 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP SECTION NO. 0005 PRICHARD INTERMODAL SITE J000 0690 207002-000 SUBGRADE 3,205.000 CY 0695 207034-000 FABRIC FOR SEPARATION 62,190.000 SY 0700 307001-000 AGGREGATE BASE COURSE, CLASS 1 7,145.000 CY 1 FEDERAL PROJECT PAGE 8 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0005 PRICHARD INTERMODAL SITE J000 0705 307001-000 AGGREGATE BASE COURSE, CLASS 1 (ACCESS ROAD TO PUMP STATION) 45.000 CY 0710 311006-001 OPEN GRADED FREE DRAINING BASE COURSE 6,867.000 CY 0715 501005-010 10 INCH NON-REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT 19,230.000 SY 0720 514001-001 ROLLER COMPACTED CONCRETE 18" 42,560.000 SY 0723 607048-001 STRUCTURE MOUNTED POST, ANCHORED 61.000 EA 0725 608001-006 6 FT RIGHT-OF-WAY FENCE, CHAIN LINK 328.000 LF 0735 610001-001 PLAIN CONCRETE CURBING, TYPE I 1,005.000 LF 0740 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0745 645001-001 PRIMARY REINFORCEMENT, NOMINAL LONG TERM TENSILE STRENGTH 3680 33,783.000 SY 0750 652001-001 AGRICULTURAL LIMESTONE 36.000 TN 0755 652002-001 FERTILIZER, 10-20-10 15.000 TN 0760 652002-002 FERTILIZER, UREA FORMALDEHYDE 5.000 TN 0765 652003-001 SEED MIXTURES, B, C-1, OR C-2 2,100.000 LB 0770 652004-001 STRAW OR HAY MULCH 87.000 TN SECTION NO. 0006 WATERLINE RELOCATION Y060 0774 670007-006 1 INCH PLASTIC PIPE, CLASS 200 193.000 LF 0775 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0780 670007-012 2 INCH PLASTIC PIPE, CLASS 200 270.000 LF 0785 670007-020 6 INCH PLASTIC PIPE, CLASS 150 1,686.000 LF 0790 670009-120 2 INCH GATE VALVE AND VALVE BOX 2.000 EA 0795 670009-200 6 INCH GATE VALVE AND VALVE BOX 2.000 EA 1 FEDERAL PROJECT PAGE 9 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0006 WATERLINE RELOCATION Y060 0800 670010-260 12 INCH STEEL CASING PIPE, THICKNESS 0.25 IN 172.000 LF 0805 670013-200 6 INCH FIRE HYDRANT 2.000 EA 0810 670015-120 2 INCH METER 2.000 EA 0815 670017-001 METER BOX 2.000 EA 0817 670019-201 6 INCH SPECIAL VALVE, TAP AND SLEEVE WITH VALVE BOX 1.000 EA SECTION NO. 0007 SEWERLINE RELOCATION Y060 0820 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0825 675007-011 2 INCH PLASTIC SEWER PIPE 3,144.000 LF 0830 675007-020 6 INCH PLASTIC SEWER PIPE 361.000 LF 0835 675007-022 8 INCH PLASTIC SEWER PIPE 546.000 LF 0840 675014-001 MANHOLE COMPLETE, INCLUDING CASTING 4.000 EA 0845 675015-001 DROP MANHOLE COMPLETE, INCLUDING CASTING 2.000 EA 0850 675021-198 4 INCH STEEL CASING PIPE, THICKNESS 0.25 IN 140.000 LF 0855 675022-120 2 INCH AIR VALVE ASSEMBLY 1.000 EA 0860 675025-001 SPECIAL STRUCTURE 6 INCH CLEANOUT 1.000 EA 0865 675025-001 SPECIAL STRUCTURE OIL/WATER SEPARATOR 1.000 EA 0870 675028-001 LIFT STATION AND VALVE VAULT LUMP LUMP SECTION NO. 0008 TRACKWORK K000 0875 211001-000 UNCLASSIFIED BORROW EXCAVATION 46,343.000 CY 0876 211002-000 ROCK BORROW EXCAVATION 12,623.000 CY 1 FEDERAL PROJECT PAGE 10 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0008 TRACKWORK K000 0880 307001-000 AGGREGATE BASE COURSE, CLASS 1 19,064.000 CY 0882 604076-016 18 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, H7 60.000 LF 0883 604076-024 36 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, H7 60.000 LF 0885 900001-003 REMOVE EXISTING TRACK 5,731.090 FT 0890 900001-004 F&I NEW 136# CWR ON STEEL TIES (10" BALLAST) 18,427.000 FT 0895 900001-005 F&I NEW NO. 10 RH MANUAL T/O W/ 136# ON STEEL TIES 2.000 EA ON STEEL TIES, RIGHT HAND, INCLUDES 10IN BALLAST 0900 900001-006 F&I NEW NO. 10 LH MANUAL T/O W/ 136# ON STEEL TIES 2.000 EA 0910 900001-008 FURNISH & INSTALL NEW HB HAYES DERAIL 2.000 EA 0911 207001-001 UNCLASSIFIED EXCAVATION 2,500.000 CY SECTION NO. 0009 MECHANICAL K000 0915 900020-001 SITE FURNISHINGS, COMPRESSOR CONTAINER 3.000 EA 0930 900020-001 SITE FURNISHINGS, AIR RECEIVER 2.000 EA 0935 900020-001 SITE FURNISHINGS, COMPRESSED AIR OUTLET 12.000 EA 0940 900020-001 SITE FURNISHINGS, 3000 GALLON DIESEL TANK 1.000 EA 0945 900020-001 SITE FURNISHINGS, 300 GALLON GASOLINE TANK 1.000 EA 0950 900020-001 SITE FURNISHINGS, 300 GALLON 40W OIL TANK 1.000 EA 0955 900020-001 SITE FURNISHINGS, 300 GALLON ANTI-FREEZE TANK 1.000 EA 0960 900020-001 SITE FURNISHINGS, 300 GALLON USED OIL TANK 1.000 EA 0965 900020-001 SITE FURNISHINGS, 500 GALLON HYDRAULIC FLUID TANK 1.000 EA 0970 900020-001 SITE FURNISHINGS, 300 GALLON TRANSMISSION FLUID TANK 1.000 EA 0975 900020-001 SITE FURNISHINGS, STEAM JENNY CLEANER 1.000 EA 1 FEDERAL PROJECT PAGE 11 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0009 MECHANICAL K000 0980 900020-002 SITE FURNISHINGS, 3" COMP. AIR LINE 1,375.000 LF SECTION NO. 0010 SECURITY AND WIM K000 0985 900030-001 VIDEO SECURITY SYSTEM LUMP LUMP 0990 900030-002 FIBER OPTIC CABLE 12,000.000 LF 0995 900030-003 YARD SECURITY CHAIN LINK FENCE 8,900.000 LF 1000 900030-004 SWINGING VEHICULAR GATE CHAIN LINK 1.000 EA 1005 900030-005 SWINGING RAILROAD CRASH GATE CHAIN LINK 2.000 EA 1010 900030-006 BENDING PLATE WEIGH IN MOTION SCALE LUMP LUMP SECTION NO. 0011 MODULAR BUILDINGS K000 1015 672002-002 SITE FURNISHINGS, MAINTENANCE BUILDING LUMP LUMP 1020 672002-002 SITE FURNISHINGS, ADMINISTRATION BUILDING LUMP LUMP SECTION NO. 0012 ELECTRICAL AND LIGHTING K000 1025 900040-001 800 AMP. MAIN ELECTRICAL DISTRIBUTION PANEL 1.000 EA 1030 900040-002 TRANSFORMER, 75KVA, 480/208, NEMA 3R (MAIN DISTRIBUTI 1.000 EA 1035 900040-002 TRANSFORMER, 45KVA, 480/240, NEMA 3R (MAIN DISTRIBUTI 1.000 EA 1040 900040-004 400 AMP, 250 A MCB ELECTRICAL PANELBOARD NEMA 3R 1.000 EA 1045 900040-005 225 AMP. ELECTRICAL PANELBOARD, NEMA 3R 1.000 EA 1050 900040-006 4" TRANSFORMER CONCRETE PADS 2.000 EA 1055 900040-007 LOW-VOLT. ELECT. POWER COND. & CABLES, 300KCMIL 900.000 LF 1060 900040-007 LOW-VOLT. ELECT. POWER COND. & CABLES, 250KCMIL 250.000 LF 1 FEDERAL PROJECT PAGE 12 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0012 ELECTRICAL AND LIGHTING K000 1065 900040-007 LOW-VOLT. ELECT. POWER COND. & CABLES, 4/O 200.000 LF 1070 900040-007 LOW-VOLT. ELECT. POWER COND. & CABLES, #8 AWG 250.000 LF 1075 900040-007 LOW-VOLT. ELECT. POWER COND. & CABLES, #4 AWG 300.000 LF 1080 900040-007 LOW-VOLT. ELECT. POWER COND. & CABLES, #3 AWG 450.000 LF 1085 900040-007 LOW-VOLT. ELECT. POWER COND. & CABLES, #12 AWG 600.000 LF 1090 900040-007 LOW-VOLT. ELECT. POWER COND. & CABLES, #2 AWG 200.000 LF 1095 900040-007 LOW-VOLT. ELECT. POWER COND. & CABLES, #6 AWG 800.000 LF 1110 900040-018 RACEWAY, 4" PVC SCHEDULE 80 CONDUITS 1,500.000 LF 1115 900040-018 RACEWAY, 3 1/2" PVC SCHEDULE 80 CONDUITS 50.000 LF 1120 900040-018 RACEWAY, 3" PVC SCHEDULE 80 CONDUITS 500.000 LF 1125 900040-018 RACEWAY, 2" PVC SCHEDULE 80 CONDUITS 100.000 LF 1130 900040-018 RACEWAY, 1" RGS, AND PVC 300.000 LF 1135 900040-018 RACEWAY, 3/4" RGS AND PVC 250.000 LF 1140 900040-108 TRENCHING AND BACKFILLING 2,208.000 CY 1145 900040-109 CONCRETE ENCASEMENT 1,027.000 CY SECTION NO. 0013 MAINTENANCE PAD EQUIPMENT K000 1150 900050-001 NEMA 3R, 400 AMP, ELECT. PANELBOARD, 400A MCB 1.000 EA 1160 900050-003 ELECTRICAL CHANNELS 3.000 EA 1165 900050-004 MAINTENANCE EQUIPMENT RACK 1.000 EA 1170 900050-005 4" TRANSFORMER CONCRETE PADS 1.000 EA 1175 900050-006 OUTLET RECEPTACLES 60A 6.000 EA 1 FEDERAL PROJECT PAGE 13 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0013 MAINTENANCE PAD EQUIPMENT K000 1180 900050-006 OUTLET RECEPTACLES 100A 4.000 EA 1185 900050-008 ENCLOSED SWITCHES AND CIRCUIT BREAKERS, 100A 1.000 EA 1190 900050-008 ENCLOSED SWITCHES AND CIRCUIT BREAKERS, 20A 10.000 EA 1195 900050-010 CONVENIENCE OUTLET RECEPTACLES 2.000 EA 1200 900050-011 LOW-VOLT. ELECT. POWER COND. & CABLES, 4/O 1,600.000 LF 1205 900050-011 LOW-VOLT. ELECT. POWER COND. & CABLES, 3/O 400.000 LF 1210 900050-011 LOW-VOLT. ELECT. POWER COND. & CABLES, #12 AWG 600.000 LF 1215 900050-011 LOW-VOLT. ELECT. POWER COND. & CABLES, #6 AWG 500.000 LF 1220 900050-011 LOW-VOLT. ELECT. POWER COND. & CABLES, #4 AWG 150.000 LF 1225 900050-011 LOW-VOLT. ELECT. POWER COND. & CABLES, #3 AWG 500.000 LF 1230 900050-011 LOW-VOLT. ELECT. POWER COND. & CABLES, #2 AWG 200.000 LF 1240 900050-019 RACEWAY, 3" PVC SCHEDULE 80 CONDUITS, RGS 500.000 LF 1245 900050-019 RACEWAY, 2" PVC SCHEDULE 80 CONDUITS, RGS 200.000 LF 1250 900050-019 RACEWAY, 1 1/2" RGS, AND PVC 300.000 LF 1255 900050-019 RACEWAY, 1" RGS, AND PVC 200.000 LF 1260 900050-019 RACEWAY, 3/4" RGS AND PVC 450.000 LF SECTION NO. 0014 STORAGE CONTAINER EQUIPMENT 1265 900060-001 3 (32W) SURFACE FLOURESCENT 4.000 EA 1270 900060-002 CONVENIENCE OUTLET RECEPTACLES 2.000 EA 1275 900060-003 RACEWAY, 1"RGS, AND PVC 300.000 LF 1280 900060-004 LOW-VOLT. ELECT. POWER COND. & CABLES, #12 AWG 500.000 LF 1 FEDERAL PROJECT PAGE 14 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0014 STORAGE CONTAINER EQUIPMENT 1285 900060-004 LOW-VOLT. ELECT. POWER COND. & CABLES, #6 AWG 200.000 LF SECTION NO. 0015 MAINTENANCE BUILDING EQUIPMENT 1290 900070-001 200 AMP. ELECTRICAL PANELBOARD, NEMA 1 1.000 EA 1295 900070-002 LOW-VOLT. ELECT. POWER COND. & CABLES, 3/O 500.000 LF 1300 900070-003 RACEWAY, 3" PVC SCHEDULE 80 CONDUITS, RGS 100.000 LF SECTION NO. 0016 ADMINISTRATION BUILDING EQUIPMENT 1305 900080-001 200 AMP. ELECTRICAL PANELBOARD, NEMA 1 1.000 EA 1310 900080-002 LOW-VOLT. ELECT. POWER COND. & CABLES, 4/O 2,000.000 LF 1315 900080-003 RACEWAY, 3" PVC SCHEDULE 80 CONDUITS, RGS 1,000.000 LF 1320 900080-003 RACEWAY, 4" PVC SCHEDULE 80 CONDUITS 1,200.000 LF SECTION NO. 0017 CAB-1 BUILDING EQUIPMENT 1325 900090-001 10 KVA MINI POWER ZONE 1.000 EA 1330 900090-002 70W EXTERIOR LIGHT FIXTURES 6.000 EA 1335 900090-003 3 (32W) SURFACE FLUORESCENT 3.000 EA 1340 900090-004 ENCLOSED SWITCHES AND CIRCUIT BREAKERS, 20A 3.000 EA 1345 900090-004 ENCLOSED SWITCHES AND CIRCUIT BREAKERS, 200A 2.000 EA 1350 900090-006 PHOTO SENSOR 1.000 EA 1355 900090-007 CONVENIENCE OUTLET RECEPTACLES 3.000 EA 1360 900090-008 LOW-VOLT. ELECT. POWER COND. & CABLES, 1/O 500.000 LF 1365 900090-008 LOW-VOLT. ELECT. POWER COND. & CABLES, 4/O 2,000.000 LF 1 FEDERAL PROJECT PAGE 15 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0017 CAB-1 BUILDING EQUIPMENT 1370 900090-008 LOW-VOLT. ELECT. POWER COND. & CABLES, #6 AWG 500.000 LF 1375 900090-008 LOW-VOLT. ELECT. POWER COND. & CABLES, #12 AWG 500.000 LF 1380 900090-008 LOW-VOLT. ELECT. POWER COND. & CABLES, 3/O 1,000.000 LF 1385 900090-010 CONTROL-VOLTAGE ELECTRICAL POWER CABLES 200.000 LF 1390 900090-014 RACEWAY, 3" PVC SCHEDULE 80 CONDUITS, RGS 1,500.000 LF 1395 900090-014 RACEWAY, 1" RGS, AND PVC 250.000 LF 1400 900090-014 RACEWAY, 3/4" RGS, AND PVC 200.000 LF SECTION NO. 0018 CAB-2 BUILDING EQUIPMENT 1405 900100-001 10 KVA MINI POWER ZONE 1.000 EA 1410 900100-002 ENCLOSED SWITCHES AND CIRCUIT BREAKERS, 60A 2.000 EA 1415 900100-002 ENCLOSED SWITCHES AND CIRCUIT BREAKERS, 200A 2.000 EA 1420 900100-002 ENCLOSED SWITCHES AND CIRCUIT BREAKERS, 20A 3.000 EA 1425 900100-004 70W EXTERIOR LIGHT FIXTURES 6.000 EA 1430 900100-005 CONVENIENCE OUTLET RECEPTACLES 3.000 EA 1435 900100-007 PHOTO SENSOR 1.000 EA 1440 900100-008 3 (32W) SURFACE FLUORESCENT 3.000 EA 1445 900100-009 CONTROL-VOLTAGE ELECTRICAL POWER CABLES 150.000 LF 1450 900100-010 LOW-VOLT. ELECT. POWER COND. & CABLES, 500KCMIL 4,000.000 LF 1455 900100-010 LOW-VOLT. ELECT. POWER COND. & CABLES, 3/O 6,000.000 LF 1460 900100-010 LOW-VOLT. ELECT. POWER COND. & CABLES, #8 AWG 250.000 LF 1465 900100-010 LOW-VOLT. ELECT. POWER COND. & CABLES, #12 AWG 500.000 LF 1 FEDERAL PROJECT PAGE 16 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0018 CAB-2 BUILDING EQUIPMENT 1470 900100-014 RACEWAY, 4" PVC SCHEDULE 80 CONDUITS 4,000.000 LF 1475 900100-014 RACEWAY, 3" PVC SCHEDULE 80 CONDUITS, RGS 2,500.000 LF 1480 900100-014 RACEWAY, 1" RGS, AND PVC 200.000 LF 1485 900100-014 RACEWAY, 3/4" RGS, AND PVC 750.000 LF SECTION NO. 0019 CAB-3 BUILDING EQUIPMENT 1490 900110-001 200 AMP. ELECTRICAL PANELBOARD, NEMA 1 1.000 EA 1500 900110-002 TRANSFORMER, 37.5KVA, 480/240 1.000 EA 1505 900110-003 ENCLOSED SWITCHES AND CIRCUIT BREAKERS, 60A 2.000 EA 1510 900110-003 ENCLOSED SWITCHES AND CIRCUIT BREAKERS, 20A 3.000 EA 1515 900110-004 70W EXTERIOR LIGHT FIXTURES 6.000 EA 1520 900110-005 3 (32W) SURFACE FLUORESCENT 3.000 EA 1525 900110-006 CONTROL-VOLTAGE ELECTRICAL POWER CABLES 150.000 LF 1530 900110-007 CONVENIENCE OUTLET RECEPTACLES 3.000 EA 1535 900110-008 PHOTO SENSOR 1.000 EA 1540 900110-010 LOW-VOLT. ELECT. POWER COND. & CABLES, #8 AWG 1,450.000 LF 1545 900110-010 LOW-VOLT. ELECT. POWER COND. & CABLES, 3/O 6,000.000 LF 1550 900110-010 LOW-VOLT. ELECT. POWER COND. & CABLES, #12 AWG 900.000 LF 1555 900110-013 RACEWAY, 1 1/2" RGS, AND PVC 400.000 LF 1560 900110-013 RACEWAY, 1" RGS, AND PVC 400.000 LF 1565 900110-013 RACEWAY, 3/4" RGS, AND PVC 200.000 LF 1570 900110-016 SITE LIGHTING LUMP LUMP 1 FEDERAL PROJECT PAGE 17 Call Order : 001 CONTRACT ID : 1203851R1 Letting Date : 08/28/12 10:00 A.M. PROJECTS : X050-0POR/T0-010.00 00 0TIG 0003 243 000 COUNTIES : WAYNE DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 06/30/15 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0020 COMPUTER SYSTEM 1575 640004-001 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP