WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- October 17, 2006 LETTING Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its office in Building Five, Room A-148, 1900 Kanawha Boulevard East, Charleston, West Virginia 25305-0430 until 10 A.M. October 17, 2006 and said proposals will be publicly opened and read immediately thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 0510140 U302-0009/00-016.13 02 HUBT 0009 165 C00 CONST NEW/RELOC 4 LANE ROAD W/BRIDGE(S) REGIONAL JAIL TO OPEQUON CREEK CO 9/13 - 0.1 MI S OPEQUON CREEK COUNTY: BERKELEY BRIDGE : 10324 CONCRETE SLAB ON PRESTRESSED GIRDER SPAN(S): 3 ; BRIDGE : 10325 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : MANDATORY PRE-BID 10/3/06, TUESDAY, 1 P.M. BLDG 5 RM A-122 ------------------------------------------------------------------------------------------------------------------------------------ 002 9812734 S320-0079/00-020.57 00 00IM 0791 090 E00 STRUCTURE RENOVATION LEFT HAND FORK BRIDGE / US 119, 1.30 MI N CO 53 COUNTY: KANAWHA BRIDGE : 2922.1 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 3 ; DBE GOAL: 5 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 003 0108641 S330-0065/05-001.08 00 00BR 0655 010 E00 STRUCTURE REPLACEMENT DELBARTON CONCRETE GIRDER BRIDGE /ROCKHOUSE FK, 0.22 MI W CO 65/18 COUNTY: MINGO BRIDGE : 10523 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 1 ; STRUCTURE STEEL: 87,802.00 LBS DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 004 *0115804 U317-0131/00-000.02 00 INTERSECTION IMPROVEMENT BENEDUM DRIVE TURNING LANE US 50-0.05 MI N US 50 COUNTY: HARRISON ------------------------------------------------------------------------------------------------------------------------------------ 005 *0518748 U317-0019/00-017.02 00 STPG 0019 307 E00 TRAFFIC SIGNAL US 19 RAMPS TRAFFIC SIGNAL RENOVATION I/S US19 & US 50 WB RAMPS COUNTY: HARRISON ------------------------------------------------------------------------------------------------------------------------------------ WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- October 17, 2006 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 006 *0606941 S354-0047/00-000.74 00 0STP 0074 044 E00 REPAIR DAMAGE WV 47 SEED AND MULCH BEGIN: 0.74 MI. E. OF JCT US 50 END: 1.04 MI. E. OF US 50 COUNTY: WOOD ------------------------------------------------------------------------------------------------------------------------------------ 007 0506940R1 S320-0060/62-000.15 00 0STP 6062 005 E00 CLEAN AND PAINT STRUCTURE 36TH ST BRIDGE # 2565 0.14 MILES NORTH OF WV 61 COUNTY: KANAWHA BRIDGE : 2565 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 13 ; DBE GOAL: 1 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. CONTRACT: 0506940 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of total bid, whichever is greater. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained at the Charleston office. The right is reserved to reject any or all proposals. *These are projects on which any contractor with a Category "W" Prequalification Rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals on all projects will be furnished at twenty-five dollars ($25.00) per set. Extra plans will be furnished at fifteen dollars ($15.00) per set and extra proposals will be furnished at ten dollars ($10.00) per proposal. Cross sections will be furnished at fifty dollars ($50.00) per set. All will be furnished without refund and transmitted at your risk. The above noted project information will be available in the Contract Unit, Construction Section, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305 and may also be ordered by calling (304)558-2874. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national orign in consideration for an award. No proposals for these projects will be issued after 3:00 P.M. on the day prior to the letting. It is necessary to advise your approximate uncompleted workload when ordering plans and proposals. Announcement, opening and reading of bids received will be in the order as designated in the "Notice to Contractors". Sealed proposals may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9 A.M. and 10 A.M., the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division Of Highways John E. Lewis, Jr., Assistant Secretary for Program Administration 1 FEDERAL PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 0510140 Letting Date : 10/17/06 10:00 A.M. PROJECTS : U302-0009/00-016.13 02 HUBT 0009 165 C00 COUNTIES : BERKELEY DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/09 RES. ENG.: GARY LONG DESCRIPTION: REGIONAL JAIL TO OPEQUON CREEK MANDATORY PRE-BID 10/3/06, TUESDAY, 1 P.M. BLDG 5 RM A-122 ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202001-000 BUILDING DEMOLITION NUMBER, 46/1 ( 1.00 ) LUMP 0015 202001-000 BUILDING DEMOLITION NUMBER, 55/2 ( 1.00 ) LUMP 0020 202001-000 BUILDING DEMOLITION NUMBER, 58/1 ( 1.00 ) LUMP 0025 202002-000 WATER WELL ABANDONMENT NUMBER, 46/2 LUMP LUMP 0030 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 58/2 LUMP LUMP 0035 204001-000 MOBILIZATION LUMP LUMP 0040 207001-001 UNCLASSIFIED EXCAVATION 227,713.000 CY 0045 207002-000 SUBGRADE 20,764.000 CY 0050 207034-000 FABRIC FOR SEPARATION 95,109.000 SY 0055 211002-000 ROCK BORROW EXCAVATION 1,645.000 CY 0060 211008-000 ROCK BORROW EXCAVATION 500.000 TN 0065 307001-000 AGGREGATE BASE COURSE, CLASS 1 2,416.000 CY 0070 307001-000 AGGREGATE BASE COURSE, CLASS 10 1,634.000 CY 0075 311006-001 OPEN GRADED FREE DRAINING BASE COURSE 6,616.000 CY 0080 408002-001 BITUMINOUS MATERIAL 852.000 GA 0085 501001-008 8 INCH REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT 168.000 SY 0090 501005-010 10 INCH NON-REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT 37,875.000 SY 0095 501010-001 BRIDGE APPROACH EXPANSION JOINT 4.000 EA 0100 502001-012 12 INCH PORTLAND CEMENT CONCRETE APPROACH SLAB 769.000 SY 1 FEDERAL PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 0510140 Letting Date : 10/17/06 10:00 A.M. PROJECTS : U302-0009/00-016.13 02 HUBT 0009 165 C00 COUNTIES : BERKELEY DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/09 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0105 601002-001 CLASS B CONCRETE 28.000 CY 0110 604037-012 15 INCH REINFORCED CONCRETE PIPE, CLASS III 57.000 LF 0115 604037-016 18 INCH REINFORCED CONCRETE PIPE, CLASS III 344.000 LF 0120 604037-020 24 INCH REINFORCED CONCRETE PIPE, CLASS III 984.000 LF 0125 604037-022 30 INCH REINFORCED CONCRETE PIPE, CLASS III 252.000 LF 0130 604037-026 42 INCH REINFORCED CONCRETE PIPE, CLASS III 111.000 LF 0135 604037-028 48 INCH REINFORCED CONCRETE PIPE, CLASS III 490.000 LF 0140 604071-012 15 INCH REINFORCED CONCRETE PIPE SAFETY SLOPE END SECTION 2.000 EA 0145 604071-016 18 INCH REINFORCED CONCRETE PIPE SAFETY SLOPE END SECTION 2.000 EA 0150 604071-020 24 INCH REINFORCED CONCRETE PIPE SAFETY SLOPE END SECTION 2.000 EA 0155 604071-022 30 INCH REINFORCED CONCRETE PIPE SAFETY SLOPE END SECTION 6.000 EA 0160 605001-001 TYPE A MANHOLE 1.000 EA 0165 605002-001 TYPE B MANHOLE 1.000 EA 0170 605008-001 TYPE F INLET 2.000 EA 0175 605009-001 TYPE G INLET 31.000 EA 0180 605014-001 MODIFIED INLET, TYPE G 1.000 EA 0185 606029-001 FREE DRAINING BASE TRENCH 13,499.000 LF 0190 606030-001 OUTLET PIPE, 6 INCH 1,293.000 LF 0195 607001-001 TYPE 1 GUARDRAIL, CLASS I 4,565.000 LF 0200 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 6.000 EA 0205 607030-001 SPECIAL TRAILING END TERMINAL 23.000 EA 1 FEDERAL PROJECT PAGE 3 Call Order : 001 CONTRACT ID : 0510140 Letting Date : 10/17/06 10:00 A.M. PROJECTS : U302-0009/00-016.13 02 HUBT 0009 165 C00 COUNTIES : BERKELEY DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/09 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0210 607042-001 6 FT STEEL POST ,6 INCH 5.000 EA 0215 607046-001 7 INCH ROUND X 6 FT TREATED WOOD POST 12.000 EA 0220 607065-001 FLARED END TERMINAL 5.000 EA 0225 608002-001 3 FT X 11 IN RIGHT-OF-WAY FENCE, FARM FIELD 12,675.000 LF 0230 608003-001 3 FT 11 IN TEMPORARY FENCE 400.000 LF 0235 608006-001 PEDESTRIAN GATE, FARM FIELD, 4 FT 1.000 EA 0240 610002-001 INTEGRAL CONCRETE CURBING, TYPE I 25.000 LF 0245 633003-001 DUMPED ROCK GUTTER 643.000 CY 0250 636007-001 ERADICATION OF PAVEMENT MARKING 2,000.000 LF 0255 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 15,000.000 LF 0260 636009-001 TEMPORARY PAVEMENT MARKING-TAPE 4 IN SOLID LINE 30,000.000 LF 0265 636011-001 TRAFFIC CONTROL DEVICE 36,230.000 UN 0270 636012-010 PROJECT TRAFFIC CONTROL DEVICE CLEANING 3.000 EA 0275 636013-001 INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING 400.000 EA 0280 636014-001 FLAGGER 700.000 HR 0285 636017-001 TEMPORARY CONCRETE BARRIER 500.000 LF 0290 636019-001 TEMPORARY GUARDRAIL BARRIER 325.000 LF 0295 636021-001 ELECTRIC ARROW 40.000 DA 0300 636022-001 CHANGAEBLE MESSAGE SIGN 720.000 DA 0305 636025-001 WARNING LIGHTS, TYPE B 8,500.000 DA 0310 636025-001 WARNING LIGHTS, TYPE C 1,200.000 DA 1 FEDERAL PROJECT PAGE 4 Call Order : 001 CONTRACT ID : 0510140 Letting Date : 10/17/06 10:00 A.M. PROJECTS : U302-0009/00-016.13 02 HUBT 0009 165 C00 COUNTIES : BERKELEY DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/09 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0315 637001-001 WATER FOR DUST PALLIATIVE 408.000 MG 0320 638002-001 RIGHT OF WAY MARKER 86.000 EA 0325 638003-001 SURVEY MARKER 20.000 EA 0330 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0335 640001-001 STANDARD FIELD OFFICE AND STORAGE BUILDING 16.000 MO 0340 640003-001 BUILDING EQUIPMENT LUMP LUMP 0345 642001-001 TEMPORARY BERM 2,770.000 LF 0350 642004-001 SEED MIXTURE, TEMPORARY 1,929.000 LB 0355 642005-001 MULCH, STRAW OR HAY 64.000 TN 0360 642006-001 FERTILIZER 13.000 TN 0365 642008-001 TEMPORARY PIPE 415.000 LF 0370 642009-001 CONTOUR DITCH 2,045.000 LF 0375 642010-001 AGRICULTURAL LIMESTONE 48.000 TN 0380 642012-001 SILT FENCE 8,040.000 LF 0385 642015-001 SUPER SILT FENCE 1,500.000 LF 0390 642031-001 DITCH CHECK 122.000 EA 0395 642033-001 SEDIMENT TRAP 4,325.000 CY 0400 652001-001 AGRICULTURAL LIMESTONE 48.000 TN 0405 652002-001 FERTILIZER, 10-20-10 13.000 TN 0410 652002-002 FERTILIZER, UREA FORMALDEHYDE 5.000 TN 0415 652003-001 SEED MIXTURES, B, C-1, OR C-2 3,054.000 LB 1 FEDERAL PROJECT PAGE 5 Call Order : 001 CONTRACT ID : 0510140 Letting Date : 10/17/06 10:00 A.M. PROJECTS : U302-0009/00-016.13 02 HUBT 0009 165 C00 COUNTIES : BERKELEY DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/09 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0420 652004-001 STRAW OR HAY MULCH 64.000 TN 0425 655001-001 MATTING TEMPORARY 8,945.000 SY 0430 655002-001 PERMANENT EROSION MATTING, TYPE A 7,238.000 SY 0435 664001-008 IMPACT ATTENUATING DEVICE, TYPE IV 2.000 EA 0440 699000-001 ON JOB TRAINING 1,000.000 HR 0445 401001-011 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, 6,967.000 TN AA1 TYPE 19 0450 401001-012 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 19 6,325.000 TN AA2 0455 401001-011 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, 7,933.000 TN AB1 TYPE 37.5 0460 401001-012 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 37.5 7,572.000 TN AB2 0465 402001-011 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 3,719.000 TN AC1 GRAVEL, TYPE 9.5 0470 402001-012 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, 3,550.000 TN AC2 SLAG, TYPE 9.5 0475 636002-001 AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 250.000 TN AD1 0480 636002-002 AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 238.000 TN AD2 0485 604002-012 15 INCH FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, A2 24.000 LF AE1 0490 604037-012 15 INCH REINFORCED CONCRETE PIPE, CLASS III 24.000 LF AE2 0495 604076-012 15 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 24.000 LF AE3 0500 604002-016 18 INCH FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, A2 2,227.000 LF AF1 0505 604072-116 18 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 1.000 EA AF1 0510 604037-016 18 INCH REINFORCED CONCRETE PIPE, CLASS III 2,227.000 LF AF2 0515 604071-016 18 INCH REINFORCED CONCRETE PIPE SAFETY SLOPE END SECTION 1.000 EA AF2 0520 604076-016 18 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 2,227.000 LF AF3 1 FEDERAL PROJECT PAGE 6 Call Order : 001 CONTRACT ID : 0510140 Letting Date : 10/17/06 10:00 A.M. PROJECTS : U302-0009/00-016.13 02 HUBT 0009 165 C00 COUNTIES : BERKELEY DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/09 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0525 604072-116 18 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 1.000 EA AF3 0530 604002-020 24 INCH FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, A2 910.000 LF AG1 0535 604072-120 24 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 3.000 EA AG1 0540 604037-020 24 INCH REINFORCED CONCRETE PIPE, CLASS III 910.000 LF AG2 0545 604071-020 24 INCH REINFORCED CONCRETE PIPE SAFETY SLOPE END SECTION 3.000 EA AG2 0550 604076-020 24 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 910.000 LF AG3 0555 604072-120 24 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 3.000 EA AG3 0560 604002-022 30 INCH FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, A2 173.000 LF AH1 0565 604037-022 30 INCH REINFORCED CONCRETE PIPE, CLASS III 173.000 LF AH2 0570 604076-022 30 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 173.000 LF AH3 0575 604002-024 36 INCH FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, A2 150.000 LF AJ1 0580 604037-024 36 INCH REINFORCED CONCRETE PIPE, CLASS III 150.000 LF AJ2 0585 604076-024 36 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 150.000 LF AJ3 0590 604002-026 42 INCH FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, A2 262.000 LF AK1 0595 604072-126 42 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 1.000 EA AK1 0600 604037-026 42 INCH REINFORCED CONCRETE PIPE, CLASS III 262.000 LF AK2 0605 604071-026 42 INCH REINFORCED CONCRETE PIPE SAFETY SLOPE END SECTION 1.000 EA AK2 0610 604076-026 42 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 262.000 LF AK3 0615 604072-126 42 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 1.000 EA AK3 0620 604002-028 48 INCH FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, A2 570.000 LF AL1 0625 604037-028 48 INCH REINFORCED CONCRETE PIPE, CLASS III 570.000 LF AL2 1 FEDERAL PROJECT PAGE 7 Call Order : 001 CONTRACT ID : 0510140 Letting Date : 10/17/06 10:00 A.M. PROJECTS : U302-0009/00-016.13 02 HUBT 0009 165 C00 COUNTIES : BERKELEY DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/09 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0630 604076-028 48 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 570.000 LF AL3 SECTION NO. 0002 BRIDGE #10324 OVER OPEQUON CREEK 0635 203001-000 DISMANTLING STRUCTURE LUMP LUMP 0640 207034-000 FABRIC FOR SEPARATION 688.000 SY 0645 211002-000 ROCK BORROW EXCAVATION 2,728.000 CY 0650 212001-000 STRUCTURE EXCAVATION 188.000 CY 0655 212002-000 WET EXCAVATION 973.000 CY 0660 212005-000 SELECT MATERIAL FOR BACKFILLING 275.000 CY 0665 601002-001 CLASS B CONCRETE 832.000 CY 0670 601009-001 CLASS H CONCRETE 996.000 CY 0675 601009-003 CLASS H CONCRETE, ARCHITECTURAL 94.000 CY 0680 602001-001 REINFORCING STEEL BAR 156,625.000 LB 0685 602002-001 EPOXY COATED REINFORCING STEEL BAR 203,085.000 LB 0690 603018-020 54 INCH PRESTRESSED CONCRETE I BEAM 3,416.000 LF 0695 615029-001 NON-GUIDED BEARING, ELASTOMERIC 78.000 EA 0700 616004-006 HP12X53 STEEL BEARING PILE, DRIVEN 2,426.000 LF 0705 617003-001 ALUMINUM RAILING 273.000 LF 0710 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0715 662002-001 GALVANIZED STEEL CONDUIT 2 INCH LUMP LUMP SECTION NO. 0003 BRIDGE #10325 CR 9/16 OVER EVANS RUN 1 FEDERAL PROJECT PAGE 8 Call Order : 001 CONTRACT ID : 0510140 Letting Date : 10/17/06 10:00 A.M. PROJECTS : U302-0009/00-016.13 02 HUBT 0009 165 C00 COUNTIES : BERKELEY DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/09 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0003 BRIDGE #10325 CR 9/16 OVER EVANS RUN 0720 207034-000 FABRIC FOR SEPARATION 116.000 SY 0725 211002-000 ROCK BORROW EXCAVATION 144.000 CY 0730 212005-000 SELECT MATERIAL FOR BACKFILLING 48.000 CY 0735 601002-001 CLASS B CONCRETE 28.000 CY 0740 601009-001 CLASS H CONCRETE 86.000 CY 0745 602001-001 REINFORCING STEEL BAR 3,128.000 LB 0750 602002-001 EPOXY COATED REINFORCING STEEL BAR 15,962.000 LB 0755 603016-024 33X36 INCH PRESTRESSED CONCRETE BOX BEAM 262.000 LF 0760 615029-001 NON-GUIDED BEARING, ELASTOMERIC 16.000 EA 0765 616004-006 HP12X53 STEEL BEARING PILE, DRIVEN 224.000 LF 0770 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP SECTION NO. 0004 REINFORCED BOX CULVERT #10414 0775 211002-000 ROCK BORROW EXCAVATION 599.000 CY 0780 212001-000 STRUCTURE EXCAVATION 1,208.000 CY 0785 212005-000 SELECT MATERIAL FOR BACKFILLING 253.000 CY 0790 601002-001 CLASS B CONCRETE 941.000 CY 0795 602001-001 REINFORCING STEEL BAR 175,830.000 LB 0800 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP SECTION NO. 0005 SIGNING & PAVEMENT MARKINGS 0805 657006-001 S4X7.7, A-441 SUPPORT, GALVANIZED 203.000 LF 1 FEDERAL PROJECT PAGE 9 Call Order : 001 CONTRACT ID : 0510140 Letting Date : 10/17/06 10:00 A.M. PROJECTS : U302-0009/00-016.13 02 HUBT 0009 165 C00 COUNTIES : BERKELEY DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/09 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0005 SIGNING & PAVEMENT MARKINGS 0810 657006-005 W6X12, A-441 SUPPORT, GALVANIZED 158.000 LF 0815 657006-015 W10X22, A-441 SUPPORT, GALVANIZED 101.000 LF 0820 657008-001 2.00 LB CHANNEL POST 474.000 LF 0825 657010-001 3.00 LB CHANNEL POST 1,491.000 LF 0830 657017-001 CLASS B CONCRETE FOOTING, REINFORCED, ROADSIDE 16.000 CY 0835 657018-001 POST REMOVAL 5.000 EA 0840 658001-001 CLASS B CONCRETE FOOTING, REINFORCED, OVERHEAD 11.000 CY 0845 658002-001 OVERHEAD SIGN, STEEL-ALUMINUM COMBINATION ,01 1.000 EA 0850 659001-001 SIGN LIGHTING, TYPE 3 ,01 LUMP LUMP 0855 661001-001 0.080 IN FLAT SHEET SIGN 868.000 SF 0860 661002-001 EXTRUDED PANEL SIGN 1,371.000 SF 0865 661004-001 DELINEATOR, REFLEX REFLECTOR, SINGLE, ,WHITE 20.000 EA 0870 661006-001 DELINEATOR, NINE PER UNIT, ,AMBER 8.000 UN 0875 661008-001 DELINEATOR BRACKET, TYPE A 1.000 EA 0880 661008-001 DELINEATOR BRACKET, TYPE C 1.000 EA 0885 661011-001 INSTALLATION OF REUSABLE SIGN 5.000 EA 0890 661013-001 PLASTIC DELINEATOR POST, (WHITE) 96.000 EA 0895 661013-001 PLASTIC DELINEATOR POST, (YELLOW) 76.000 EA 0900 663001-004 EDGE LINE, TYPE II ,WHITE 25,400.000 LF 0905 663001-004 EDGE LINE, TYPE II ,YELLOW 14,600.000 LF 0910 663002-005 LANE LINE OR CENTERLINE, TYPE II ,WHITE 3,690.000 LF 1 FEDERAL PROJECT PAGE 10 Call Order : 001 CONTRACT ID : 0510140 Letting Date : 10/17/06 10:00 A.M. PROJECTS : U302-0009/00-016.13 02 HUBT 0009 165 C00 COUNTIES : BERKELEY DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/09 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0005 SIGNING & PAVEMENT MARKINGS 0915 663003-005 BARRIER LINE, TYPE II ,4 INCH 9,700.000 LF 0920 663004-004 CHANNELIZING LINE, TYPE II ,4 INCH 800.000 LF 0925 663005-010 STOP LINE, TYPE V (24") 180.000 LF 0930 663007-004 STRIPE, TYPE II YELLOW (12") 500.000 LF 0935 663009-025 BICYCLE SYMBOL, TYPE V 5.000 EA 0940 663010-010 LANE ARROW, TYPE V 16.000 EA SECTION NO. 0006 COMPUTER SYSTEM 0945 640004-001 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP SECTION NO. 0007 WATERLINE RELOCATION 0950 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0955 670007-012 2 INCH PLASTIC PIPE, CLASS 200 280.000 LF 0960 670007-024 10 INCH PLASTIC PIPE, CLASS 200 705.000 LF 0965 670009-240 10 INCH GATE VALVE AND VALVE BOX 3.000 EA 0970 670010-340 20 INCH STEEL CASING PIPE, THICKNESS 0.250 INCH 178.000 LF 0975 670010-380 24 INCH STEEL CASING PIPE, THICKNESS 0.250 INCH 242.000 LF 0980 670010-440 30 INCH STEEL CASING PIPE, THICKNESS 0.250 INCH 255.000 LF 0985 670014-001 RELOCATE FIRE HYDRANT 1.000 EA SECTION NO. 0008 STEEL AND GFRP-REINFORCED CRCP 0990 301001-001 CEMENT TREATED BASE COURSE 1,593.000 CY 0995 311006-001 OPEN GRADED FREE DRAINING BASE COURSE (CEMENT STABILIZED) 587.000 CY 1 FEDERAL PROJECT PAGE 11 Call Order : 001 CONTRACT ID : 0510140 Letting Date : 10/17/06 10:00 A.M. PROJECTS : U302-0009/00-016.13 02 HUBT 0009 165 C00 COUNTIES : BERKELEY DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/09 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0008 STEEL AND GFRP-REINFORCED CRCP 1000 501001-010 10 INCH REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT (GFRP) 2,667.000 SY 1005 501001-010 10 INCH REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT (STEEL REINFORCED) 2,667.000 SY 1010 501010-001 BRIDGE APPROACH EXPANSION JOINT ,MODIFIED 3.000 EA 1 FEDERAL PROJECT PAGE 12 Call Order : 002 CONTRACT ID : 9812734 Letting Date : 10/17/06 10:00 A.M. PROJECTS : S320-0079/00-020.57 00 00IM 0791 090 E00 COUNTIES : KANAWHA DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/16/07 RES. ENG.: WILLIAM J. KELLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 307001-000 AGGREGATE BASE COURSE, CLASS 1 63.000 CY 0020 408002-001 BITUMINOUS MATERIAL 22.000 GA 0025 501010-001 BRIDGE APPROACH EXPANSION JOINT 4.000 EA 0030 502001-012 12 INCH PORTLAND CEMENT CONCRETE APPROACH SLAB 362.000 SY 0035 506001-001 CONCRETE PAVEMENT REPAIR 36.000 SY 0040 605012-001 ADJUST INLET TYPE, G 2.000 EA 0045 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 4.000 EA 0050 608001-002 4 FT RIGHT-OF-WAY FENCE, CHAIN LINK 130.000 LF 0055 636007-001 ERADICATION OF PAVEMENT MARKING 8,000.000 LF 0060 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 9,000.000 LF 0065 636009-001 TEMPORARY PAVEMENT MARKING-TAPE 4 IN SOLID LINE 19,000.000 LF 0070 636011-001 TRAFFIC CONTROL DEVICE 13,760.000 UN 0075 636012-010 PROJECT TRAFFIC CONTROL DEVICE CLEANING 4.000 EA 0080 636013-001 INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING 108.000 EA 0085 636014-001 FLAGGER 400.000 HR 0090 636017-001 TEMPORARY CONCRETE BARRIER 2,000.000 LF 0095 636018-001 REMOVE AND RESET TEMPORARY CONCRETE BARRIER 1,550.000 LF 0100 636021-001 ELECTRIC ARROW 120.000 DA 0105 636025-001 WARNING LIGHTS, TYPE B 960.000 DA 1 FEDERAL PROJECT PAGE 13 Call Order : 002 CONTRACT ID : 9812734 Letting Date : 10/17/06 10:00 A.M. PROJECTS : S320-0079/00-020.57 00 00IM 0791 090 E00 COUNTIES : KANAWHA DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/16/07 RES. ENG.: WILLIAM J. KELLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 636025-001 WARNING LIGHTS, TYPE C 2,000.000 DA 0115 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0120 640001-001 STANDARD FIELD OFFICE AND STORAGE BUILDING 8.000 MO 0125 640003-001 BUILDING EQUIPMENT LUMP LUMP 0130 642011-001 HAY OR STRAW BALE 94.000 EA 0135 642012-001 SILT FENCE 280.000 LF 0140 663001-004 EDGE LINE, TYPE II ,WHITE 6,660.000 LF 0145 663001-004 EDGE LINE, TYPE II ,YELLOW 6,660.000 LF 0150 663002-005 LANE LINE OR CENTERLINE, TYPE II ,WHITE 1,650.000 LF 0155 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 85.000 EA 0160 664001-009 REMOVE AND RESET G.R.E.A.T. ATTENUATOR DEVICE 2.000 EA 0165 664001-016 IMPACT ATTENUATING DEVICE, TYPE VIII 2.000 EA 0170 401014-001 HOT-MIX ASPHALT FOR SHOULDER REPAIR, STONE OR GRAVEL, TYPE I 12.000 TN AA1 0175 401014-002 HOT-MIX ASPHALT FOR SHOULDER REPAIR, SLAG, TYPE I 11.000 TN AA2 0180 402001-011 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 88.000 TN BB1 GRAVEL, TYPE 9.5 0185 402001-012 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, 80.000 TN BB2 SLAG, TYPE 9.5 0190 636002-001 AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 200.000 TN CC1 0195 636002-002 AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 180.000 TN CC2 SECTION NO. 0002 BRIDGE #2922.1 0200 203001-000 DISMANTLING STRUCTURE LUMP LUMP 0205 207001-001 UNCLASSIFIED EXCAVATION 326.000 CY 1 FEDERAL PROJECT PAGE 14 Call Order : 002 CONTRACT ID : 9812734 Letting Date : 10/17/06 10:00 A.M. PROJECTS : S320-0079/00-020.57 00 00IM 0791 090 E00 COUNTIES : KANAWHA DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/16/07 RES. ENG.: WILLIAM J. KELLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 BRIDGE #2922.1 0210 211002-000 ROCK BORROW EXCAVATION 321.000 CY 0215 212001-000 STRUCTURE EXCAVATION 100.000 CY 0220 212005-000 SELECT MATERIAL FOR BACKFILLING 88.000 CY 0225 601009-001 CLASS H CONCRETE 250.000 CY 0230 601031-001 EPOXY INJECTION CRACK REPAIR 51.000 LF 0235 601046-001 MODIFIED CONCRETE END POST 4.000 EA 0240 602002-001 EPOXY COATED REINFORCING STEEL BAR 16,983.000 LB 0245 615012-001 RESETTING BRIDGE BEARING 12.000 EA 0250 615012-003 REMOVE AND REPLACE BRIDGE SHOE 24.000 EA 0255 688002-001 CLEAN AND PAINT EXISTING STEEL BRIDGE COATED WITH LEAD BASE LUMP LUMP PAINT 0260 688003-001 CONTAINMENT AND DISPOSAL OF SPENT MATERIAL LUMP LUMP SECTION NO. 0003 PILING WALL 0265 211002-000 ROCK BORROW EXCAVATION 1,513.000 CY 0270 614003-001 CONCRETE LAGGING, THICKNESS 8" 2,573.000 SF 0275 616005-008 HP12X74 STEEL BEARING PILE, PRE-DRILLED AND DRIVEN 1,568.000 LF 0280 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP SECTION NO. 0004 GASLINE RELOCATION 0285 670010-180 4 INCH STEEL CASING PIPE, THICKNESS 0.25 INCH 200.000 LF 0290 671001-080 1.25 INCH GAS LINE, TYPE MDPE 230.000 LF 1 FEDERAL PROJECT PAGE 15 Call Order : 003 CONTRACT ID : 0108641 Letting Date : 10/17/06 10:00 A.M. PROJECTS : S330-0065/05-001.08 00 00BR 0655 010 E00 COUNTIES : MINGO DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/14/08 RES. ENG.: ROB PENNINGTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 2,346.000 CY 0020 207002-000 SUBGRADE 338.000 CY 0025 207034-000 FABRIC FOR SEPARATION 2,023.000 SY 0030 240001-000 CLEAN CULVERT 110.000 LF 0035 307001-000 AGGREGATE BASE COURSE, CLASS 1 315.000 CY 0040 307001-000 AGGREGATE BASE COURSE, CLASS 10 72.000 CY 0045 408002-001 BITUMINOUS MATERIAL 1,091.000 GA 0050 415005-001 REMOVE EXISTING PAVEMENT SURFACE 335.000 SY 0055 501005-006 6 INCH NON-REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT 24.000 SY 0060 502001-012 12 INCH PORTLAND CEMENT CONCRETE APPROACH SLAB 157.000 SY 0065 604072-112 15 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 1.000 EA 0070 607001-001 TYPE 1 GUARDRAIL, CLASS II 112.500 LF 0075 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 4.000 EA 0080 607066-001 TANGENT END TERMINAL 2.000 EA 0085 608003-001 3 FT 11 IN TEMPORARY FENCE 215.000 LF 0090 610005-002 BITUMINOUS CURB, TYPE II 20.000 LF 0095 636005-001 TEMPORARY STRUCTURE FOR MAINTAINING TRAFFIC ( 1.00 ) LUMP 0100 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE SOLID LINE 750.000 LF 0105 636011-001 TRAFFIC CONTROL DEVICE 4,480.000 UN 1 FEDERAL PROJECT PAGE 16 Call Order : 003 CONTRACT ID : 0108641 Letting Date : 10/17/06 10:00 A.M. PROJECTS : S330-0065/05-001.08 00 00BR 0655 010 E00 COUNTIES : MINGO DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/14/08 RES. ENG.: ROB PENNINGTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 636012-010 PROJECT TRAFFIC CONTROL DEVICE CLEANING 2.000 EA 0115 636013-001 INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING 100.000 EA 0120 636014-001 FLAGGER 200.000 HR 0125 636023-001 TEMPORARY TRAFFIC SIGNAL ( 1.00 ) LUMP 0130 636025-001 WARNING LIGHTS, TYPE B 720.000 DA 0135 638002-001 RIGHT OF WAY MARKER 20.000 EA 0140 638004-001 OUTLET MARKER 1.000 EA 0145 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0150 640003-001 BUILDING EQUIPMENT LUMP LUMP 0155 640006-001 SMALL FIELD OFFICE 12.000 MO 0160 642004-002 SEED MIXTURE, B 15.300 LB 0165 642004-003 SEED MIXTURE, D D 2.700 LB 0170 642005-001 MULCH, STRAW OR HAY 0.500 TN 0175 642005-002 MULCH, WOOD CELLULOSE FIBER 0.100 TN 0180 642006-001 FERTILIZER 0.120 TN 0185 642010-001 AGRICULTURAL LIMESTONE 0.160 TN 0190 642011-001 HAY OR STRAW BALE 289.000 EA 0195 642012-001 SILT FENCE 865.000 LF 0200 642031-001 DITCH CHECK 9.000 EA 0205 652001-001 AGRICULTURAL LIMESTONE 0.160 TN 0210 652002-001 FERTILIZER, 10-20-10 0.120 TN 1 FEDERAL PROJECT PAGE 17 Call Order : 003 CONTRACT ID : 0108641 Letting Date : 10/17/06 10:00 A.M. PROJECTS : S330-0065/05-001.08 00 00BR 0655 010 E00 COUNTIES : MINGO DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/14/08 RES. ENG.: ROB PENNINGTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0215 652002-002 FERTILIZER, UREA FORMALDEHYDE 0.120 TN 0220 652003-001 SEED MIXTURES, B, C-1, OR C-2 28.200 LB 0225 652004-001 STRAW OR HAY MULCH 0.600 TN 0230 652004-002 WOOD CELLULOSE FIBER MULCH 0.100 TN 0235 663001-004 EDGE LINE, TYPE II WHITE 1,000.000 LF 0240 663003-005 BARRIER LINE, TYPE II YELLOW 1,000.000 LF 0245 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 156.000 TN AA1 TYPE 4 0250 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 4 142.000 TN AA2 0255 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 2 165.000 TN BB1 0260 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 2 150.000 TN BB2 0265 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 1 206.000 TN CC1 0270 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 1 187.000 TN CC2 0275 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 10.000 TN DD1 GRAVEL 0280 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 9.000 TN DD2 0285 604002-012 15 INCH FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, A2 110.000 LF EE1 0290 604025-012 15 INCH CORRUGATED ALUMINUM ALLOY PIPE, A2 110.000 LF EE2 0295 604002-016 18 INCH FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, A2 5.000 LF FF1 0300 604025-016 18 INCH CORRUGATED ALUMINUM ALLOY PIPE, A2 5.000 LF FF2 0305 636002-001 AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 900.000 TN GG1 0310 636002-002 AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 810.000 TN GG2 SECTION NO. 0002 BRIDGE #10523 1 FEDERAL PROJECT PAGE 18 Call Order : 003 CONTRACT ID : 0108641 Letting Date : 10/17/06 10:00 A.M. PROJECTS : S330-0065/05-001.08 00 00BR 0655 010 E00 COUNTIES : MINGO DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/14/08 RES. ENG.: ROB PENNINGTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 BRIDGE #10523 0315 203001-000 DISMANTLING STRUCTURE LUMP LUMP 0320 212001-000 STRUCTURE EXCAVATION 1,255.000 CY 0325 212004-000 COFFERDAM 4.000 EA 0330 212005-000 SELECT MATERIAL FOR BACKFILLING 140.000 CY 0335 601002-001 CLASS B CONCRETE 401.000 CY 0340 601003-001 CLASS K CONCRETE 17.000 CY 0345 601009-001 CLASS H CONCRETE 147.000 CY 0350 602001-001 REINFORCING STEEL BAR 30,156.000 LB 0355 602002-001 EPOXY COATED REINFORCING STEEL BAR 32,382.000 LB 0360 615001-001 STEEL SUPERSTRUCTURE ( 87,802.00 ) LUMP 0365 615029-001 NON-GUIDED BEARING, ELASTOMERIC 4.000 EA 0370 615030-001 FIXED BEARING, ELASTOMERIC 4.000 EA 0375 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0380 642050-001 DEWATERING DEVICE 4.000 EA 0385 679006-001 TEST SLAB LUMP LUMP SECTION NO. 0003 WATERLINE RELOCATION 0390 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0395 670004-121 2 INCH DUCTILE IRON PIPE, TYPE I, CLASS 50 188.000 LF 0400 670004-222 8 INCH DUCTILE IRON PIPE, TYPE II, CLASS 50 118.000 LF 0405 670004-222 8 INCH DUCTILE IRON PIPE, TYPE II, CLASS 56 143.000 LF 0410 670009-120 2 INCH GATE VALVE AND VALVE BOX 1.000 EA 1 FEDERAL PROJECT PAGE 19 Call Order : 003 CONTRACT ID : 0108641 Letting Date : 10/17/06 10:00 A.M. PROJECTS : S330-0065/05-001.08 00 00BR 0655 010 E00 COUNTIES : MINGO DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/14/08 RES. ENG.: ROB PENNINGTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0003 WATERLINE RELOCATION 0415 670009-220 8 INCH GATE VALVE AND VALVE BOX 2.000 EA 0420 670010-180 4 INCH STEEL CASING PIPE, THICKNESS 0.25 INCH 30.000 LF SECTION NO. 0004 SANITARY SEWER RELOCATION 0425 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0430 675007-022 8 INCH PLASTIC SEWER PIPE 66.000 LF 0435 675014-001 MANHOLE COMPLETE, INCLUDING CASTING INCLUDE CASTING 3.000 EA 0440 675018-001 ADJUSTING MANHOLE 1.000 EA SECTION NO. 0005 COMPUTER SYSTEM 0445 640004-001 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP 1 STATE PROJECT PAGE 20 Call Order : 004 CONTRACT ID : 0115804 Letting Date : 10/17/06 10:00 A.M. PROJECTS : U317-0131/00-000.02 00 COMPLETION DATE : 05/31/07 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TURNING LANE 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 82.300 CY 0015 207034-000 FABRIC FOR SEPARATION 305.000 SY 0020 218003-000 GABION 12.000 CY 0025 408002-001 BITUMINOUS MATERIAL 70.000 GA 0030 604025-028 48 INCH CORRUGATED ALUMINUM ALLOY PIPE, A2 4.000 LF 0035 604050-012 15 INCH CORRUGATED POLYETHYLENE PIPE SMOOTH LINED 130.000 LF 0040 605009-001 TYPE G INLET 1.000 EA 0045 605015-001 ADJUST MANHOLE TYPE A 1.000 EA 0050 636011-001 TRAFFIC CONTROL DEVICE 2,910.000 UN 0055 636014-001 FLAGGER 240.000 HR 0060 636025-001 WARNING LIGHTS, TYPE B 72.000 DA 0065 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0070 642004-002 SEED MIXTURE, B 2.400 LB 0075 642005-002 MULCH, WOOD CELLULOSE FIBER 0.190 TN 0080 642006-001 FERTILIZER 0.010 TN 0085 642031-001 DITCH CHECK 2.000 EA 0090 660002-020 TRAFFIC DETECTOR, VTDS LUMP LUMP 0095 660007-001 MISCELLANEOUS SIGNAL LUMP LUMP 0100 663001-004 EDGE LINE, TYPE II WHITE (14 DAY TEMPORARY) 1,620.000 LF 0105 663001-004 EDGE LINE, TYPE II WHITE (PERMANENT) 1,620.000 LF 0110 663003-005 BARRIER LINE, TYPE II YELLOW (14 DAY TEMPORARY) 1,225.000 LF 0115 663003-005 BARRIER LINE, TYPE II YELLOW (PERMANENT) 1,225.000 LF 1 STATE PROJECT PAGE 21 Call Order : 004 CONTRACT ID : 0115804 Letting Date : 10/17/06 10:00 A.M. PROJECTS : U317-0131/00-000.02 00 COMPLETION DATE : 05/31/07 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TURNING LANE 0120 663004-011 CHANNELIZING LINE, TYPE V 6" 180.000 LF 0125 663005-010 STOP LINE, TYPE V 24" 60.000 LF 0130 663010-010 LANE ARROW, TYPE V 6.000 EA 0135 663011-010 LANE LETTER, TYPE V 4.000 EA 0140 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1 80.000 TN AA1 0145 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1 72.000 TN AA2 0150 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 45.000 TN BB1 0155 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 40.000 TN BB2 0160 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 2 110.000 TN CC1 0165 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 2 99.000 TN CC2 0170 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 45.000 TN DD1 0175 401007-002 MARSHALL SCRATCH COURSE, SLAG 40.000 TN DD2 0180 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 120.000 TN EE1 GRAVEL, TYPE 1 0185 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE 1 108.000 TN EE2 1 FEDERAL PROJECT PAGE 22 Call Order : 005 CONTRACT ID : 0518748 Letting Date : 10/17/06 10:00 A.M. PROJECTS : U317-0019/00-017.02 00 STPG 0019 307 E00 COMPLETION DATE : 05/28/07 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TRAFFIC SIGNAL 0005 204001-000 MOBILIZATION LUMP LUMP 0010 636011-001 TRAFFIC CONTROL DEVICE 4,580.000 UN 0015 636014-001 FLAGGER 80.000 HR 0020 660001-001 SIGNAL CONTROLLER ,01 LUMP LUMP 0025 660002-020 TRAFFIC DETECTOR, VTDS 01 LUMP LUMP 0030 660003-006 SIGNAL SECTION, V-12 24.000 EA 0035 660007-001 MISCELLANEOUS SIGNAL ,01 LUMP LUMP 0040 660010-001 PRIORITY CONTROL SYSTEM DETECTOR ,D3 1.000 EA 0045 663005-010 STOP LINE, TYPE V (24") 75.000 LF 1 FEDERAL PROJECT PAGE 23 Call Order : 006 CONTRACT ID : 0606941 Letting Date : 10/17/06 10:00 A.M. PROJECTS : S354-0047/00-000.74 00 0STP 0074 044 E00 COMPLETION DATE : 11/30/06 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SEEDING AND MULCHING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 636011-001 TRAFFIC CONTROL DEVICE 1,330.000 UN 0015 636014-001 FLAGGER 20.000 HR 0020 636025-001 WARNING LIGHTS, TYPE B 20.000 DA 0025 652002-004 FERTILIZER, 15-30-5 7.300 TN 0030 652003-006 SEED MIXTURE, SPECIAL 1,306.000 LB 0035 655002-001 PERMANENT EROSION MATTING, TYPE SPECIAL 70,250.000 SY 1 FEDERAL PROJECT PAGE 24 Call Order : 007 CONTRACT ID : 0506940R1 Letting Date : 10/17/06 10:00 A.M. PROJECTS : S320-0060/62-000.15 00 0STP 6062 005 E00 COUNTIES : KANAWHA DBE GOALS : 1.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/07 RES. ENG.: WILLIAM J. KELLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 C & P 36TH ST BR # 2565 X331 0005 204001-000 MOBILIZATION LUMP LUMP 0010 636011-001 TRAFFIC CONTROL DEVICE 16,050.000 UN 0015 636014-001 FLAGGER 200.000 HR 0020 636014-002 TRAFFIC DIRECTOR 200.000 HR 0025 636021-001 ELECTRIC ARROW 360.000 DA 0030 636022-001 CHANGAEBLE MESSAGE SIGN 540.000 DA 0035 636025-001 WARNING LIGHTS, TYPE B 2,880.000 DA 0040 636028-001 SHADOW VEHICLE 200.000 DA 0045 688002-001 CLEAN AND PAINT EXISTING STEEL BRIDGE COATED WITH LEAD BASE LUMP LUMP PAINT 0050 688003-001 CONTAINMENT AND DISPOSAL OF SPENT MATERIAL LUMP LUMP