601.00.49
  Archive
  | Method of Tests for Determining the Condition of Concrete Bridge Decks
  | July 15, 2025
  | 
|---|
                601.03.20 
  Archive
  1/1995
  | 
                Chemical Determination of Cement Content In Hardened Portland Cement Concrete 
  | 
                De-Activated 6/2/23
     | 
            
 601.03.21
  Archive
  | Los Alamos Staining Method for Alkali Silica Reaction Gel
  | February 29, 2024
  | 
            
                 601.03.50
  Archive
  8/1/2024
  2/29/2024
  2/16/2023
  8/17/2022
  12/2020
  8/2019
  10/2006
  | 
                Guide for Quality Control and Acceptance Requirements for Portland Cement Concrete  | 
                August 23, 2024
  | 
            
            
                 601.03.51 
  Archive
  4/2005
  1/1995
  | 
                Standard Method for Determination of the Total Solids In Portland Cement Concrete  | 
                August 31, 2022
  | 
            
            
                601.03.52 
  Archive
  | 
                Procedural Guidelines for Maintaining Control Charts for Portland Cement Concrete  | 
                January 1995
     | 
            
601.03.53 Attachment
  Archive | Standard Method for Determination of Optimized Aggregate Gradation in Portland Cement Concrete
  | October 2021
  | 
            
                 601.04.20 
  Archive
  2/2005
  1/1995
  | 
                Curing Concrete Test Specimens In The Field  | 
                February 16, 2023
 
    | 
            
            
                601.04.21
  Archive June 1996
  | 
                Acceptance Use Of The Maturity Method For The Estimation Of Concrete Strength On WVDOH Projects 
  | 
                March 2020 | 
            
             601.05.50
  Archive
  October 2019
  | 
                Quality Assurance Procedures For Portland Cement Concrete  | 
                August 25, 2025
  | 
                
                 601.11.20 
  Archive
  1/1995
  | 
                Calibration and Operation of Rolling Ten Foot Straight Edge on Bridge Decks  | 
                February 16, 2023
     | 
            
            
                 603.02.10 
  Archive
  2/16/2023
  5/14/2018
  | 
                Guide for Approval of Component Materials At Precast and Prestressed Concrete Plants  | 
                July 25, 2024 | 
            
            
                | 
                  603.06.20
 
 Archive
  8/2015
   | 
                 Test Method for the Determination of Bond Strength Between Prestressing Steel Strand and Self-Consolidating Concrete (SCC)
  | 
                August 31, 2022
  | 
            
            
                 603.10.40
  Archive
  8/31/2022
  5/2020
  6/2013
  | 
                Inspection and Acceptance Procedures for Prestressed Concrete Bridge Beams  | 
                January 2, 2025
  | 
            
            
                 604.02.40   Archive
  5/31/2023
  2/16/2023
  3/30/2022
  10/2021 
                 | 
                Inspection and Acceptance Procedures for Precast Concrete Products.
  | 
                January 2, 2025 | 
            
            
                606.03.50 
  Archive
  1/1995
  | 
                Procedure for Determining a Reduced Unit Price To Be Paid for Underdrain Aggregate Which Does Not Conform To The Grading Requirements of Governing Specifications  | 
                May 2020 | 
            
            
                608.02.20 
  Archive
  1/1995
  | 
                Qualitative Determination of Coating Materials On Metal  | 
                De-Activated 7/20/22
  | 
            
            
                608.02.50  now
  709.46.50
  Archive
  | 
                Quality Control of Steel Fence Posts Studded Tee Type 
  | 
                Number Changed to 709.46.50
  | 
            
615.00.20
  10/2010 1/1995
  | Preparing, Recording, and Transmitting Approved Lists of Welding Electrodes and Fluxes
  | Deleted
  | 
            
                615.05.10
  Archive 10/2010
  | 
                Preparing, Recording, and Transmitting Approved List of Welding Electrodes and Fluxes (Replaced IM-29)  | 
                De-Activated 7/20/22 | 
            
            
                615.20.00 
  Archive
  1/1995
  | 
                Field (Job Site) Welder Qualification Procedures for Shielded Metal Arc Welding Flux Cored Arc Welding and Gas Metal Arc Welding (Replaced IM-30)  | 
                Aug 2020 | 
            
             615.20.01 Previously  IM-31
  Archive
  | Preparing, Recording and Transmitting Information on Approved List of Welded Stud Shear Connectors
  | August 1, 2024
  | 
                616.14.50 
  Archive
  1/1995
  | 
                Quality Assurance of Steel Bearing Piles Item 616, Steel Sheet Piling, Welded and Seamless Steel Pipe Piles  | 
                De-Activated 7/20/22  | 
            
            
                642.03.50 
  Archive
  | 
                Contractor's Quality Control for Surface Waters & Sampling Procedures for Quality Determination  | 
                January 1995
 
    | 
            
            
                642.40.20 
  Archive
  1/1995
  | 
                Analysis of Water  | 
                January 1995
  De-Activated 8/8/2023
 
    | 
            
            
                657.00.50
  Archive
  1/1995
 
  | 
                Method of Tensioning and Reporting Torque of Bolts for New and Replacement Breakaway Sign Supports  | 
                January 1995
  Deactivated 
     | 
            
             658.05.06
  | Ancillary Structure Anchor Bolt Tightening
  | August 1, 2024
  | 
                661.00.00 
  Archive
  | 
                Chemical Analysis of Aluminum Alloy 
  | 
                January 1995
     | 
            
            
                 661.02.40 
  Archive
  8/31/2022
  6/1996
  | 
                Sampling, Inspection, and Acceptance of Signing Material
  | January 6, 2025
  | 
            
             661.02.50
  | Criteria to Approve Manufacturers of Aluminum Sheeting for Traffic Signs
  | August 1, 2024
  | 
                 661.20.00
  Archive
  10/1996
  | 
                Procedure for Determining the Torque on Tamper Resistant Hardware 
  | 
                May 31, 2023
     | 
            
            
                679.03.00 
  Archive
  | 
                Total Solids In Latex Polymer Modified Concrete  | 
                January 1995
 
  Revision Pending   | 
            
            
                688.02.20
  Archive
  1/1995
  | 
                Guide for Contractor's and Fabricator's Quality Control Plan for Painting Structural Steel (Replaced MP 615.06.20)  | 
                May 2019 | 
            
            
                688.03.20 
  Archive
  1/1995
  | 
                Guide for Developing the Contractor's Containment/Disposal Control Plan for Spent Material Prior to Painting Existing Steel Structures  | 
                May 2019 | 
            
            
                688.03.21
  Archive
  1/1995
 
  | 
                Procedures for Sampling "Spent Material" During Removal or Cleaning of Existing Steel Structures Prior to Repainting | 
                De-Activated | 
            
            
                688.03.22
  Archive
  1/1995 | 
                Procedure for Testing "Spent Material" Recovered During Paint Removal or Cleaning of Existing Steel Structures  | 
                De-Activated | 
            
            
                688.03.23
  Archive
  1/1995
  | 
                Evaluation and Approval for Laboratory Testing of Solid Waste  | 
                De-Activated
 
  |