County Route 8 (Shelter Road) will experience a temporary full bridge closure between milepost 6.33 and milepost 6.34 to allow construction crews to safely perform a complete bridge superstructure and deck replacement. The traveling public is advised to seek alternate routes around the closure, observe all posted traffic control signs, and exercise caution near the active work zone.
| Detail | Information |
|---|---|
| Location | County Route 8 (Shelter Road), from milepost 6.33 to milepost 6.34 |
| Dates | Beginning at 8:00 a.m. on Tuesday, March 11, 2025, through Friday, March 21, 2025 |
| Traffic Impact | Full bridge closure. Motorists must utilize alternate routes and obey all posted traffic control devices. |
| Project Scope | Bridge superstructure and deck replacement |
Note: Inclement weather conditions or unforeseen operational circumstances could modify the project schedule. The West Virginia Division of Highways (WVDOH) apologizes for any inconvenience this temporary closure may cause to local residents and visitors.
