Skip to main content
An Official West Virginia Government Website

Lane Closure on County Route 24, Meadowbrook Road, beginning Monday, March 02, 2026

TRAFFIC ADVISORY: Continuous 24/7 Lane Restrictions Established on Meadowbrook Road for Bridge Rehabilitation

The West Virginia Division of Highways (WVDOH) has implemented a long-term, continuous single-lane restriction on County Route 24 (Meadowbrook Road) at the USMC Stephen E. Drummond Memorial Bridge. This essential infrastructure preservation initiative is engineered to execute specialized structural maintenance, significantly extending the service life of the crossing while ensuring long-term safety for the traveling public.


Project Timeline and Operational Matrix

Due to the complex structural nature of the rehabilitation work, this zone utilizes a continuous 24/7 lane restriction. Motorists should anticipate shifted travel lanes, reduced clearance margins, and localized delays during morning and evening peak traffic hours.

Meadowbrook Road Bridge Project Specifications
Constraint ParameterProject Specifications & Thresholds
Designated RouteCounty Route 24 (Meadowbrook Road)
Structural LandmarkUSMC Stephen E. Drummond Memorial Bridge
Construction WindowCommenced Monday, March 2, 2026 — Anticipated completion in Late Summer 2026
Traffic ConfigurationContinuous single-lane restriction (Maintained 24 hours a day, 7 days a week)
Maximum Permissible Width11.5 feet absolute maximum lane envelope

Engineering Preservation Scope

The capital preservation works involve precision maintenance targeting elements most vulnerable to environmental weathering and high-volume vehicular loading:

  • Advanced Bridge Deck Overlay: Contractors are applying a specialized protective surface course to the driving deck. This dense overlay acts as an impermeable barrier to seal the concrete, permanently preventing water, brine, and corrosive chemical de-icing salts from penetrating into the underlying steel rebar matrix.
  • Expansion Dam Replacement: Crews will completely remove worn components and install brand-new, modern expansion joint systems. These mechanical gaps allow the bridge deck to expand and contract smoothly in response to seasonal thermal shifts without creating internal stress fractures.

Commuter Directives and Safety Protocols

The WVDOH appreciates the cooperation and patience of regional commuters while these structural upgrades are carried out. To safeguard both civil construction crews and the driving public, travelers must strictly observe active work zone rules:

Critical Commuter Notice: Expect localized travel delays through the Meadowbrook Road corridor. Motorists are strongly urged to plan their routes ahead of time and add extra padding to their daily travel buffers. Please maintain a safe following distance, eliminate all interior distractions, and strictly obey all posted electronic traffic control devices.

  • Wide Load Restrictions: Freight operators and drivers transporting agricultural or commercial loads exceeding the strict 11.5-foot width limit are prohibited from entering the zone and must utilize pre-planned alternate regional corridors.
  • Schedule Contingencies: Motorists are reminded that unpredictable weather shifts, heavy seasonal precipitation, or unexpected field discoveries can cause supervisors to adjust or extend the active construction calendar.

Accessibility Statement:
The West Virginia Department of Transportation will, upon request, provide reasonable accommodations including auxiliary aids and services necessary to afford an individual with a disability an equal opportunity to participate in our services, programs, and activities. Please contact us at (304) 558-3931. Persons with hearing or speech impairments can reach all state agencies by calling (800) 982-8772 (voice to TDD) or (800) 982-8771 (TDD to voice), toll free.

Contact Name
WVDOT Communications