Skip to main content
An Official West Virginia Government Website

Lane Closure on I-79 to Begin Thursday, February 19, 2026, at Tom’s Run Bridge

The West Virginia Division of Highways (WVDOH) established a localized, single-lane restriction along Interstate 79 Southbound to accommodate essential structural maintenance on the Tom’s Run Bridge. Located just south of Morgantown, this targeted repair operation was integrated into a broader, systemic corridor preservation strategy designed to reinforce bridge decks, safeguard substructural elements, and maintain optimal transit safety across the North Central West Virginia highway grid.

To limit traffic disruptions and avoid interfering with the heavy morning and evening regional commutes, state engineering teams restricted field operations to a brief, off-peak afternoon window. Traffic was funneled into a single shared lane through the work zone using high-visibility barrels and electronic signage.


Project Parameters & Operational Matrix

The maintenance shift was restricted to the far-right travel lane, allowing the remaining southbound passing lane to stay open for continuous expressway traffic. The core specifications of the deployment are archived below:

Interstate 79 Tom’s Run Bridge Maintenance Specifications
Operational ParameterProject Framework Details
Designated RouteInterstate 79 (I-79) Southbound
Structural LandmarkTom’s Run Bridge (Geographic coordinate segment south of Morgantown)
Execution DateThursday, February 19, 2026
Active Work Window1:00 p.m. to 3:00 p.m. (Off-peak daytime shift)
Lane ModificationFar-right travel lane closed; left passing lane maintained open
Primary ObjectiveStructural concrete preservation and localized bridge deck maintenance

Commuter Directives & Work Zone Safety Protocol

While the construction window was deliberately abbreviated, the compression of interstate traffic into a single lane created localized bottlenecking. The WVDOH reinforced standard safety protocols for drivers navigating Monongalia and Harrison counties:

Operational Safety Notice: Motorists are reminded that highway work zones demand heightened defensive driving habits. Sudden lane changes, tailgating, or failure to yield to flashing strobe lights increases the mathematical probability of a secondary collision. The posted work zone restrictions are legally binding enforcement thresholds.

  • Buffer Transit Windows: Drivers traveling through the North Central corridor were advised to expect minor congestion and add a 10-to-15-minute padding to their mid-afternoon travel timelines.
  • Maintain Positional Alertness: Commuters must look ahead for active flashing arrow boards, orange warning barriers, and support vehicles, while remaining highly mindful of civil maintenance personnel working right adjacent to the open travel lane.
  • Utilize Real-Time Logistics Tools: WVDOH encourages all regional drivers to continuously monitor the official WV511.org platform. This digital network streams live traffic speeds, camera feeds, and active congestion updates to help motorists bypass delays.
  • Schedule Fluidity: Because heavy civil materials placement is sensitive to environmental variables, localized freezing precipitation, high moisture levels, or unexpected equipment anomalies can cause field managers to dynamically shift or extend active work windows.

Accessibility Statement:
The West Virginia Department of Transportation will, upon request, provide reasonable accommodations including auxiliary aids and services necessary to afford an individual with a disability an equal opportunity to participate in our services, programs, and activities. Please contact us at (304) 558-3931. Persons with hearing or speech impairments can reach all state agencies by calling (800) 982-8772 (voice to TDD) or (800) 982-8771 (TDD to voice), toll free.

Contact Name
WVDOT Communications