TRAFFIC ADVISORY: Nighttime Lane Closures Scheduled on Montrose Drive for Bridge Replacement Project
The West Virginia Division of Highways (WVDOH) advises motorists to expect overnight traffic disruptions along a heavily traveled segment of Montrose Drive in South Charleston. Beginning on Monday, February 23, 2026, construction crews will establish recurring nighttime lane restrictions to advance the multi-bridge replacement initiative at the Interstate 64 interchange.
To minimize regional impacts on daytime commerce and commuter gridlock along the busy commercial corridor, work will be performed exclusively during off-peak overnight hours.
Closure Logistics & Operational Windows
The temporary traffic configuration will restrict motorists to a single lane during active maintenance shifts. Drivers should adjust their travel plans based on the following operational schedule:
| Operational Parameter | Project Framework Details |
|---|---|
| Affected Lane | Left lane closure (Northbound and Southbound lanes affected as required) |
| Geographic Limits | Montrose Drive — Segment spanning from MacCorkle Avenue (US 60) to Kanawha Turnpike |
| Effective Date | Beginning Monday, February 23, 2026 |
| Daily Work Window | 9:00 p.m. to 6:00 a.m. nightly (Sunday evening through Friday morning patterns) |
| Associated Initiative | Interstate 64 Montrose Drive Interchange Three-Bridge Replacement Project |
Work Zone Safety & Commuter Guidelines
These nightly restrictions are required to safely position heavy civil equipment, manage material deliveries, and execute structural concrete demolition near active driving lanes. WVDOH urges all motorists navigating the area to prioritize safety:
- Expect Localized Delays: Although traffic volumes decrease significantly overnight, intermittent backups may manifest near the MacCorkle Avenue and Kanawha Turnpike intersections. Plan alternate routes or allow extra time for your commute.
- Exercise Extreme Caution in Low-Light Conditions: Drivers must reduce speeds immediately upon encountering warning signs, eliminate all mobile distractions, and remain highly alert for ground personnel, flashing arrow boards, and shifting lane tapers.
- Project Context: This phase directly supports the comprehensive long-term replacement of the Montrose Drive bridge over I-64, alongside the corresponding infrastructure approach structures crossing First and Second Avenues.
Operational Note: Motorists are reminded that inclement winter weather, sub-freezing temperatures, or unforeseen engineering challenges may cause the WVDOH and its prime contractors to alter, pause, or extend this nightly work schedule.
Accessibility Statement:
The West Virginia Department of Transportation will, upon request, provide reasonable accommodations including auxiliary aids and services necessary to afford an individual with a disability an equal opportunity to participate in our services, programs, and activities. Please contact us at (304) 558-3931. Persons with hearing or speech impairments can reach all state agencies by calling (800) 982-8772 (voice to TDD) or (800) 982-8771 (TDD to voice), toll free.
