One southbound lane of Interstate 77 will be temporarily closed to allow maintenance crews to safely execute a full expansion joint repair. Work teams will remove a damaged, cracked structural joint containing exposed rebar and refill the section with specialized patching material. Motorists traveling through the area should remain alert for shifting traffic patterns.
| Detail | Information |
|---|---|
| Location | Interstate 77 Southbound, from milepost 98.2 to 97.8 |
| Date | Wednesday, March 12, 2025 |
| Work Hours | 12:30 p.m. to 6:00 p.m. |
| Traffic Impact | One southbound lane closed during operations. This closure does not affect traffic utilizing southbound I-77 Exit 98 to access the 35th Street Bridge. |
| Project Scope | Full expansion joint removal, repair, and concrete refilling |
Note: The afternoon work schedule accounts for a mandatory two-hour setting and curing period required for the specialized patching material to achieve proper structural strength before the lane can be safely reopened to active traffic.

