County Route 1 (Buffalo Brink Road) will be temporarily closed to through traffic at milepost 3.07 to facilitate the relocation of a temporary bridge. This operation is a necessary phase in the construction of a new permanent infrastructure structure. A designated detour route will be established to guide motorists around the active work area during scheduled hours.
| Detail | Information |
|---|---|
| Location | County Route 1 (Buffalo Brink Road), milepost 3.07 |
| Dates | Monday, March 17, 2025, through Friday, March 21, 2025 |
| Daily Work Hours | 7:00 a.m. to 5:00 p.m. |
| Traffic Impact | Full road closure during work hours. Motorists must utilize the designated detour routes. |
| Project Scope | Relocation of a temporary bridge for the construction of a new permanent structure |
Official Detour Route:
Motorists should navigate around the closure by proceeding via County Route 1/3 (Warrior Fork Road) to County Route 19, connecting to County Route 15, and then returning to County Route 1.
