STIP Files
2020 - 2025 Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a federally mandated document that identifies the transportation projects the West Virginia Department of Transportation (WVDOT) intends to fund and implement over a six-year period. This comprehensive plan includes both federal-aid and state-funded projects, ranging from highway and bridge improvements to public transit and federal lands initiatives.
STIP Documentation and Narrative
To facilitate ease of access, the STIP is provided in smaller, downloadable sections. For optimal results, right-click the links below and select "Save Link As..." to save the Adobe PDF files directly to your computer.
| Document Section | Description | File Size |
|---|---|---|
| STIP Narrative | 2020-2025 STIP Full Narrative | 15 MB |
| STIP Approval | 2020 - 2025 Federal Approval Letter | — |
STIP Appendices: Project Listings and Maps
The appendices contain detailed project listings, organizational charts, and geographic maps for both federal and state-funded programs.
| Appendix | Description and Links | Size |
|---|---|---|
| Appendix A | WVDOH Federal Project Listings | 777 KB |
| Appendix C | Non-Federal Aid Project Listings (State Funded) | 603 KB |
| Appendix E | Seven Core Programs of the Federal STIP | 2 MB |
| Appendix F | Division of Public Transit Project Listing | 559 KB |
| Appendix G | Federal Lands Project Listing | 3 MB |
| Appendix H | Organizational Charts and Contact Lists | 648 KB |
Project Maps by Fiscal Year
Geographic visualizations of planned improvements are categorized by federal and state funding sources across each fiscal year of the program.
| Year | Appendix B: Federal Project Maps | Appendix D: State Project Maps |
|---|---|---|
| 2020 | Download (73 MB) | Download (136 MB) |
| 2021 | Download (73 MB) | Download (136 MB) |
| 2022 | Download (73 MB) | Download (136 MB) |
| 2023 | Download (73 MB) | Download (136 MB) |
| 2024 | Download (73 MB) | Download (136 MB) |
| 2025 | Download (73 MB) | Download (136 MB) |
Amendments, Adjustments, and Snapshots
The STIP is a dynamic document. Once federally approved, any changes in project cost, funding, or status are handled through formal amendments and adjustments. To see the most current version of the project listings, including recent modifications, please view the current STIP Snapshot.
- Amendments and Adjustments: View approved changes to the 2020-2025 STIP.
Last updated: 10/22/2019
