MP-Other
It is important to perform all procedures associated with sampling, testing, reporting, and inspection appropriately in order to maintain a reliable quality assurance system. This is accomplished by use of Division approved Material Procedures (MP’s). The following is a list of MP’s currently used by WVDOH.
This page is organized by MP Number.
100 | 200 | 300 | 400 | 500 | 600 | 700 | Other
| MP Number | Procedure Title | Status / Link |
|---|---|---|
| IM-18 | Quality Assurance Procedures | Replaced by MP 601.05.50 in October 2019 |
| IM-31 | Preparing, Recording, and Transmitting Information on Approved List of Welded Stud Sheer Connectors | Replaced by MP 615.20.01 on August 1, 2024 |
| MA-1 Archive | Operating and Emergency Procedures for Nuclear Gauges | Replaced by MP 700.04.23 on August 11, 2025 |
| ML-25 Archive | Procedure for Monitoring the Sieve Analysis of Fine and Coarse Aggregate | Replaced by MP 307.00.51 on August 11, 2025 |
