Skip to main content
An Official West Virginia Government Website

MP-700s

Material Procedures (700 Series)

The West Virginia Division of Highways (WVDOH) utilizes Division-approved Material Procedures (MPs) to maintain a reliable quality assurance system. These procedures standardize the sampling, testing, reporting, and inspection of materials used in state projects. The list below is organized by MP Number.

100 | 200 | 300 | 400 | 500 | 600 | 700 | Other

WVDOH Material Procedures: 700 Series
MP NumberProcedure TitleEffective DateResources and Archives
700.00.00Preparing Materials ProceduresRenumbered to 100.00.00
700.00.01Sampling and Testing of Materials at the Source (Replaces IM-17)May 31, 2023Archives: 2004, 1995
700.00.06Aggregate Sampling Procedures (Replaces ML-26)December 8, 2021Archive: 1995
700.00.22Determining Adjusted Pay Quantity for Excess Moisture in AggregatesJanuary 1995
700.00.24Nuclear Density Test By The Roller Pass MethodsMay 31, 2023Forms: T-313, T-317
700.00.30Certification of Batch Scales and Calibration of 50 Pound WeightsAugust 23, 2024Archive: 2004
700.00.50Monitoring Contractor Compaction Testing (Concrete, Base, Backfill)November 10, 2025Archive: 1995
700.00.53Evaluating Independent Assurance Samples With Acceptance SamplesNovember 10, 2025Archive: 2000
700.00.54Evaluating QC Results with Verification Sample ResultsJanuary 7, 2026Archive: 2000
701.01.10Portland Cement Mill CertificationMay 17, 2024Archive: 1995
711.03.23Mix Design for Portland Cement ConcreteOctober 1, 2025Excel Spreadsheet Tool
712.04.50Quality Assurance of Guardrail Beams, Posts, and HardwareJuly 25, 2024Replaces MP 707.02.12
712.21.26Determining Random Location of Compaction TestsJanuary 2, 2025Archive: 1999
714.03.30Quality Assurance of Reinforced Concrete Pipe and CulvertsAugust 23, 2024Archive: 2020
715.09.20Stability Determination of Portable Sign StandsJanuary 7, 2026
718.00.00Sewer and Waterline Materials ProcedureMarch 4, 2025
720.10.01Longitudinal Profile Measurement via High-Speed Inertial ProfilerJanuary 2, 2025Profiler Form

Inactive or Replaced Procedures

Material Procedures Status Updates
MP NumberTitleStatus
700.00.55Guidelines for Approved Lists of Material and SourcesReplaced by MP 106.00.03
700.03.00Procedure for Item Material CertificationDe-Activated (7/20/22)
701.01.11Chemical Constituents In Hydraulic CementDe-Activated (5/17/23)
702.00.20Fine Aggregate Moisture (Speedy Tester)De-Activated
703.00.24Source Control of AggregateDe-Activated
707.02.13Steel Sign Post Quality ControlDe-Activated
713.01.50Corrugated Metal Pipe QADe-Activated (4/5/2023)