MP-600s
It is important to perform all procedures associated with sampling, testing, reporting, and inspection appropriately in order to maintain a reliable quality assurance system. This is accomplished by use of Division approved Material Procedures (MP’s). The following is a list of MP’s currently used by WVDOH.
This page is organized by MP Number
100 | 200 | 300 | 400 | 500 | 600 | 700 | Other
Portland Cement Concrete (601 Series)
| MP Number | Description | Effective Date / Status |
|---|---|---|
| 601.00.49 | Method of Tests for Determining the Condition of Concrete Bridge Decks | July 15, 2025 |
| 601.03.20 | Chemical Determination of Cement Content In Hardened Portland Cement Concrete | De-Activated (06/02/23) |
| 601.03.21 | Los Alamos Staining Method for Alkali Silica Reaction Gel | February 29, 2024 |
| 601.03.50 | Guide for Quality Control and Acceptance Requirements for Portland Cement Concrete | August 23, 2024 |
| 601.03.53 | Determination of Optimized Aggregate Gradation in Portland Cement Concrete | October 2021 |
Precast & Prestressed Concrete (603-604 Series)
| MP Number | Description | Effective Date |
|---|---|---|
| 603.10.40 | Inspection and Acceptance Procedures for Prestressed Concrete Bridge Beams | January 2, 2025 |
| 604.02.40 | Inspection and Acceptance Procedures for Precast Concrete Products | October 28, 2025 |
Welding, Signage, & Painting (615-688 Series)
| MP Number | Description | Status |
|---|---|---|
| 615.20.00 | Field (Job Site) Welder Qualification Procedures (SMAW, FCAW, GMAW) | August 2020 |
| 658.05.06 | Ancillary Structure Anchor Bolt Tightening | August 1, 2024 |
| 661.02.40 | Sampling, Inspection, and Acceptance of Signing Material | January 6, 2025 |
| 688.02.20 | Quality Control Plan for Painting Structural Steel | May 2019 |
Note: Material Procedure 679.03.00 is currently under revision. De-activated procedures are maintained in the archive for historical project reference only.
