Top

WV Transportation

WV Transportation

WV Transportation

WV Department of Transportation

Upcoming Consultant Contract Detail

Status: Open

Approved Consultants

Chapman Technical Services.
McKinley
Potesta
Thrasher
ZMM
HNTB


Notice for Architectural and Engineering Consultant Services 
 (Request for Qualifications)

 ***** THIS IS A REVISED NOTICE TO CHANGE TO  AN OPEN 5 YEAR CONTRACT. IF YOU PREVIOUSLY APPLIED AND WERE APPROVED THERE IS NO NEED TO RESUBMIT *****

 
 Notice  is  hereby  given  that  the  West  Virginia  Department  of  Transportation,  Division  of  Highways  (DOH),  Building  and  Grounds  Section  is  soliciting  qualifications  for  the  purpose  of  making  available  a  list  of  pre-qualified  Consultants  to  be  utilized  to  provide  architectural  and  engineering  services  for  vertical  construction  projects  (primarily  buildings).  The  work  generally  consists  of  building  structural,  envelope,  or  system  inspections;  building  renovation;  new  building  design;  including  preparation  of  contract  plans  and  related  documents.  Successful  Consultants  must  be  capable  of  performing  51%  of  the  work  as  the  prime  Consultant.  This  list  of  prequalified  Consultants  will  be  made  available  on  the  WVDOH  website.  

Consultants interested in being considered for pre-qualification must submit a letter of interest and unpriced prospectus to Mr. William Murray, Assistant Director, Operations Division, West Virginia Division of Highways, Building Five, Room A-350, 1900 Kanawha Boulevard, East, Charleston, West Virginia 25305-0430,  AND via e-mail to DOHMaintenanceLOQ@wv.gov beginning March 1, 2024 through February 28, 2028.  
</br>
NO HAND DELIVERIES WILL BE ACCEPTED.

 Once  approved,  that  Consultant’s  name  shall  be  placed  on  the  list  of  Consultants  pre-qualified  to  participate  in  this  program.  Those  Consultants  selected  and  placed  on  a  master  list  MUST  resubmit  their  CCQQ  each  year  on  or  shortly  after  the  first  day  of  January  to  remain  on  the  list,  or  at  any  time  any  of  the  required  information changes. 
 Pre-qualifications  of  consultant(s)  shall  be  based  on  an  evaluation  of  the  criteria  requested  which  shall  include  but  is  not  limited  to:  design  related  experience;  technical  competence;  capability  to  perform;  and  past  performance. 
 The  areas  of  work  required  will  include,  but  are  not  limited  to,  the  following  items:  Site  planning,  building  or  system design, renovation, inspections (mechanical, electrical, structural, HVAC, waste treatment,etc.) 
 All design elements shall meet all current WV Building Codes. 
 E.E.O./AFFIRMATIVE ACTION EMPLOYER 
 All  Consultants  requesting  to  be  considered  MUST  hold  a  valid  Certificate  of  Authorization  (COA)  and  have  an  individual  who  shall  be  in  charge  of  the  work,  who  shall  sign  and  seal  all  design  documentation,  plans,  etc.,  and  must  be  registered  and  licensed  with  the  West  Virginia  Board  of  Professional  Engineers  or  the  West  Virginia  State  Board  of  Architects.  The  Consultant’s  Engineer/Architect  in-charge  shall  be  responsible  for  all  aspects of the design of the project.  This individual must have a minimum of five (5) years’ experience. 
  
 As a minimum, the prospectus shall include the following evaluation information factors: 
1. Professional  qualifications  necessary  for  consideration  and  satisfactory  performance  of  the  required  work  and  as  a  minimum  shall  have  a  professional  engineer  or  an  architect  licensed  by  the  State  of  West  Virginia.  That  person  shall  be  located  within  the  office  where  the  work  is  to  be  performed  and  shall  demonstrate  sufficient  experience  performed  for  the  State  of  West  Virginia.  This  individual  shall  be  the  person-in-charge  overseeing  the  work  and  must  be  readily  accessible  to  the Division of Highways staff, preferably located in-state. 
2. Consideration  for  a  specific  project  shall  be  given  to  specialized  experience  and  technical  competence.  Specialized  experience  considered  shall  focus  on  the  qualifications  of  the  staff  working  on  the  project  with  emphasis  placed  specialized  expertise  required  for  the  project.  As  a  minimum,  the  Consultant  shall  provide  a  Résumé  of  those  individuals  who  will  be  committed  to  the  needs  of  the  specific  project  type.  Additional  consideration  shall  be  based  on  the  professional  and  non-professional  staff’s  specialized  experience  and  technical  competence  stationed  within  the  office  where the work is to be performed. 
3. Capacity  consideration  shall  be  made  on  the  Consultant’s  ability  to  accomplish  the  work  within  the  Department’s  required  schedule  time  frame;  personnel  dedicated  to  performing  such  work. 
4. Past  performance  on  contracts  with  Government  agencies  and  private  industry  in  terms  of  cost  control,  quality  of  work,  and  compliance  with  performance  schedules.  In  addition,  the  information provided for past work performed should include: 
a. Information sufficient to show the minimum  qualifications stated in items above. 
b. A list of applicable project experience in  the past five  (5)  years. 
c. The name of the owner for whom the work was  performed. 
d. The  names  and  phone  numbers  of  owner’s  representatives  who  can  verify  and  discuss  the  Consultant’s participation in these projects. 
e. A brief description of each project size and  type, including any unusual features. 
5. Location:  consideration  shall  be  based  on  the  geographic  location  of  the  Consultant’s  office  relative  to  the  project  site,  past  experience  and  knowledge  of  the  area  where  the  project  site  is  located,  and  significant  importance  being  given  to  accessibility  of  the  office  location  relative  to  the  DOH staff. 
 In addition to the above evaluation factors, the prospectus shall include, as a minimum, the following items: 
1. A  completed  copy  of  the  Division’s  Architectural  and  Building  Consultant  Confidential  Qualification Questionnaire  [ACL1]  dated January 1,  2024 or later, if not already on file.  This form may be found on the following website: 
 http://transportation.wv.gov/highways/engineering/Pages/FormsandDocuments.aspx 
 It must specifically indicate the staff levels  by classification located in-state vs. out-of-state. 
2. Location of office or office(s) in which  the work, or part of the work, may be performed. 
3. 4. Identification  of  software  (including  design  software) that   may  potentially be   utilized  for  this project. 
5. Indication  of  whether  a  cost  accounting  system  has  been  maintained  and  is  in  effect  such  that  it  is  capable  of  segregating  and  identifying  accumulating  costs  for  each  job  that  is  performed  under cost type projects. 
6. Completed  copies  of  the  Division’s  “Consultant  Shortlist  Selection  Criteria  Technical  Evaluation”  form  limited  to  a  single  page  of  data.  One  loose  leaf  copy  of  the  form  is  to  accompany  the  bound  unpriced  prospectus.  Cross  referencing  on  this  form  to  other  parts  of  the prospectus is not acceptable.  This form can be found at the link above in item 1. 
7. A  copy  of  a  valid  “Certificate  of  Authorization”  to  offer  Engineering,  Surveying,  Architecture,  or  other related services within the state, issued by the appropriate West Virginia Board. 
 A  single  “Letter  of  Qualification”  and  one  unpriced  prospectus  are  required  and  must  contain  all  the  above  information  required  to  be  considered.  Failure  to  provide  the  required  information  and/or  insufficient  information  will  cause  disqualification  and  the  prospectus  will  be  returned.  All  evaluation  factors  as  noted  herein  before  will  be  given  equal  consideration  in  the  selection  process  unless  a  project  specific  weighting  of  the evaluation factors is shown in the Notice for Consulting Services. 
 Prior  to  entering  any  contract  negotiations,  the  selected  Consultant  and  any  subconsultants  shall  submit  a  current  audited  overhead  rate  computation  performed  by  a  State  or  Federal  government  agency  or  independent  CPA  firm.  The  submitted  overhead  audit  shall  contain  a  detailed  exhibit  of  the  computations  with  all  applicable  eliminations  and  references.  The  audit  shall  be  done  in  accordance  with  Government  Auditing  Standards  issued  by  the  Comptroller  General  of  the  United  States  and  all  eliminations  required  by  the  Federal  Acquisition  Regulations  will  be  made.  The  submitted  certified  audited  overhead  (Indirect  Cost  Rate)  report  shall  include  the  certification,  certifying  that  the  allowability  of  costs  used  to  establish  the  final  indirect  cost  rate  are  in  accordance  with  the  FAR  cost  principles,  or  a  verification  indicating  this  certification  was  previously  submitted  and  accepted  by  the  cognizant  agency.  This  requirement  will  be  waived  for  the  selected  Consultant  or  any  subconsultant  when  its  portion  of  the  fee  for  the  project  is  less  than  Two  Hundred  and  Fifty  Thousand  Dollars  ($250,000.00).  In  such  instances,  a  company  computed  overhead  rate  may  be  utilized. 
 It  is  the  policy  of  the  West  Virginia  Department  of  Transportation,  Division  of  Highways,  that  disadvantaged,  and  Women-owned  Business  Enterprises  shall  have  the  maximum  opportunity  to  participate  in  the  performance of contracts financed in whole or in part with Federal funds. 


​​​​​​​​​​​​​​​​​​

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​