WV Route 10

  • Proposed 4-lane partial access control highway from Man to Logan; approximate length of 12.5 miles
  • Purpose and Need Report completed May 1996
  • 30-mile Corridor from Logan to Gilbert, following WV 73, WV 10 and WV 80, designated as part of National Highway System by FHWA in 1998
  • Construction of 4-lane completed for WV 73 and segment of WV 10 between US 119 and Logan
  • FHWA approved reevaluation of Categorical Exclusion Evaluation March 2002
  • Estimated total cost of Logan to Man segment is $396.9 million (2002 estimate) including engineering, right-of-way and construction; estimated total construction cost is $349.5 million ($27.2 million per mile.)
  • Project Map