It is important to perform all procedures associated with sampling, testing, reporting, and inspection appropriately in order to maintain a reliable quality assurance system. This is accomplished by use of Division approved Material Procedures (MP’s). The following is a list of MP’s currently used by WVDOH.
This page is organized by MP Number
IM-18
Archive 01/95
|
Quality Assurance Procedures |
Replaced by MP 601.05.50
|
IM-31
Archive 1/1995
|
Preparing, Recording, and Transmitting Information on Approved List of Welded Stud Sheer Connectors |
Replaced by MP 615.20.01 on August 1, 2024 See 600s MPs
|
MA-1
Archive
|
Operating and Emergency Procedures for Nuclear Gauges |
August 2001 |
ML-25
Archive
|
Procedure for Monitoring the Sieve Analysis of Fine and Coarse Aggregate |
September 1996 |