It is important to perform all procedures associated with sampling, testing, reporting, and inspection appropriately in order to maintain a reliable quality assurance system. This is accomplished by use of Division approved Material Procedures (MP’s). The following is a list of MP’s currently used by WVDOH.

This page is organized by MP Number

100 | 200 | 300 | 400 | 500 | 600 | 700 | Other

IM-18

Quality Assurance Procedures

January 1995

IM-31

Preparing, Recording, and Transmitting Information on Approved List of Welded Stud Sheer Connectors

January 1995

MA-1

Operating and Emergency Procedures for Nuclear Gauges

August 2001

ML-25

Procedure for Monitoring the Sieve Analysis of Fine and Coarse Aggregate

September 1996