It is important to perform all procedures associated with sampling, testing, reporting, and inspection appropriately in order to maintain a reliable quality assurance system. This is accomplished by use of Division approved Material Procedures (MP’s). The following is a list of MP’s currently used by WVDOH.

This page is organized by MP Number

100 | 200 | 300 | 400 | 500 | 600 | 700 | Other


601.03.20

Chemical Determination of Cement Content In Hardened Portland Cement Concrete

January 1995

601.03.50

Guide for Quality Control and Acceptance Requirements for Portland Cement Concrete

September 2018

601.03.51

Standard Method for Determination of of the Total Solids In Portland Cement Concrete

April 2005 

601.03.52

Procedural Guidelines for Maintaining Control Charts for Portland Cement Concrete

January 1995

601.04.20

Curing Concrete Test Specimens In The Field

February 2005

601.04.21 Use Of The Maturity Method For The Estimation Of Concrete Strength On WVDOH Projects May 2012

601.11.20

Calibration and Operation of Rolling Ten Foot Straight Edge on Bridge Decks

January 1995

603.02.10

Guide for Approval of Component Materials At Precast and Prestressed Concrete Plants

September 2018

603.06.20

 Test Method for the Determination of Bond Strength Between Prestressing Steel Strand and Self-Consolidating Concrete August 2015

603.10.40

Inspection and acceptance procedures for Prestressed Concrete Bridge Beams

Setepmber 2018

604.02.40 

Inspection and acceptance procedures for Precast Concrete Products.
Attachment (pdf)

May 9 2018

606.03.50

Procedure for Determining a Reduced Unit Price To Be Paid for Underdrain Aggregate Which Does Not Conform To The Grading Requirements of Governing Specifications

January 1995

608.02.20

Qualitative Determination of Coating Materials On Metal

January 1995

608.02.50

Quality Control of Steel Fence Posts Studded Tee Type

January 1995

615.05.10

Preparing, Recording, and Transmitting Approved List of Welding Electrodes and Fluxes (Replaced IM-29)

October 2010

615.20.00

Field (Job Site) Welder Qualification Procedures for Shielded Metal Arc Welding Flux Cored Arc Welding and Gas Metal Arc Welding (Replaced IM-30)

January 1995

616.14.50

Quality Assurance of Steel Bearing Piles Item 616, Steel Sheet Piling, Welded and Seamless Steel Pipe Piles

January 1995

642.03.50

Contractor's Quality Control for Surface Waters & Sampling Procedures for Quality Determination

January 1995

642.40.20

Analysis of Water

January 1995

657.00.50

Method of Tensioning and Reporting Torque of Bolts for New and Replacement Breakaway Sign Supports

January 1995

661.00.00

Chemical Analysis of Aluminum Alloy

January 1995

661.02.40

Sampling, Inspection, and Acceptance of Signing Material

June 1996

661.20.00

Procedure for Determining the Torque on Tamper Resistant Hardware

October 1996

679.03.00

Total Solids In Latex Polymer Modified Concrete

January 1995

688.02.20​

Guide for Contractor's and Fabricator's Quality Control Plan for Painting Structural Steel (Replaced MP 615.06.20)

May 2019

688.03.20

Guide for Developing the Contractor's Containment/Disposal Control Plan for Spent Material Prior to Painting Existing Steel Structures

May 2019

688.03.21

Procedures for Sampling "Spent Material" During Removal or Cleaning of Existing Steel Structures Prior to Repainting

 In-active

688.03.22

Procedure for Testing "Spent Material" Recovered During Paint Removal or Cleaning of Existing Steel Structures

In-active

688.03.23

Evaluation and Approval for Laboratory Testing of Solid Waste

In-active

​​