The Route - Parsons to Davis

​​​

Update: 06/17/24

​​Blackwater Avoidance Alternative 2 Updated Historic Resources Survey​


Update: 03/05/24

Parsons to Davis Project

​​​​​​​​​​​
Corridor H - Parsons to Davis Open for Public Comment​
April – September 2019 Status:​​

After discovering evidence of the West Virginia Northern Flying Squirrel, a Federally Endangered Species, the WVDOH completed additional environmental investigations throughout the 10-mile area between Parsons and Davis in Tucker County.

The Supplemental Draft Environmental Impact Statement (SDEIS) on the segment was approved on December 4, 2002. A public hearing was held February 6, 2003 at the Blackwater Lodge in Davis. Comments were due by April 22, 2003. The Thomas and Davis City Councils had an additional 60 days (until September 30, 2003) to review the preferred alternative recommendation. The Supplemental Final Environmental Impact Statement was approved by the Federal Highway Administration on February 2, 2007, and comments regarding the SFEIS were due August 1, 2007. A SEIS is underway. Final design of this segment through Tucker County is anticipated to begin in 2023. Construction tentatively is scheduled to begin in 2024.

A copy of the following documents can be found below:
1992 Corridor Selection Draft Supplemental Environmental Impact Statement (DEIS)
1993 Corridor Selection DEIS Decision Document
1994 Alignment Selection Supplemental Environmental Impact Statement (ASDEIS)
1994 Alignment Selection Air, Noise and Energy Technical Report​​
1994 Alignment Selection Secondary and Cumulative Impacts Technical Report
1994 Alignment Selection Streams Technical Report
1994 Alignment Selection Vegetation and Wildlife Habitat Technical Report
1994 Alignment Selection Wetland Technical Report
​1996 Final Environmental Impact Statement
        Volume I - Narrative
        Volume II - Tables, Exhibits, Figures &; Appendices
        Volume III - Mitigation Document
1996 Record Of Decision​
2000 Section 106 Programmatic Agreement
2000 Settlement Agreement
2003 Blackwater Preferred Alternative Report
2003 Draft Supplemental Environmental Impact Statement
2004 Preferred Alternative Report
2007 Preferred Alternative
A copy of the 2007 SFEIS can be found
he​re.​
2017 Alignment and Resource Location Plans​
Blackwater Industrial Complex COE Report​​
Updated ​Eligibility Report - 2-15-23​​
Parsons to Davis 2023 C​OE​
Core Boring Activities 2023​
Project Location and Status
Project Summary
Project Maps


Parsons-to-Davis.png

This map is not to scale nor is it an accurate geographic representation of the area. This graphic is for planning and public information purposes only. Distances area approximated to the nearest alignment point.

​ Please cl​ick here to view the entire map at full-size (80mb).

1. Elkins to Kerens
2. Kerens to Parsons
3. Parsons to Davis
4. Davis to Bismark
5. Bismark to Forman
6. Forman to Moorefield
7. Moorefiled to Baker
8. Baker to Wardensville
9. Wardensville to Virginia

If you would like a very detailed description of a certain area, please contact us and we will be happy to provide you with that information.​​​​​​​​​​​​​​